单选题Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak. What is the best configuration to fully utilize the processor resource?()ASet up the server in SMP mode and use WLM to manage resources effectivelyBSet up eight dedicated LPARs and use DLPAR to manage resources effectivelyCSet up a shared pool with eight capped LPARs including production and test/devDSet up a shared pool with eight uncapped LPARs with priority weight to Production
单选题
Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak. What is the best configuration to fully utilize the processor resource?()
A
Set up the server in SMP mode and use WLM to manage resources effectively
B
Set up eight dedicated LPARs and use DLPAR to manage resources effectively
C
Set up a shared pool with eight capped LPARs including production and test/dev
D
Set up a shared pool with eight uncapped LPARs with priority weight to Production
参考解析
解析:
暂无解析
相关考题:
Companycom has seven days of vmstat data on four p5 590 production LPARs of four processors each. The data shows that all four LPARs have periodic utilizations of 90-95% lasting several minutes in duration. However, the average utilizations of the four LPARs were between 15-30%. The vmstat data shows that the peak utilizations of each LPAR do not occur at the same time. Which of the following should be set up?()A、A shared pool with four capped LPARsB、A shared pool with four uncapped LPARsC、Four dedicated LPARs and use DLPAR to manage resources effectivelyD、The server in SMP mode and use WLM to manage resources effectively
A current Sun Solaris customer has just purchased their first p5 590. During the Solution Assurance, the backup requirements were discussed. Which of the following should be recommended to the customer with regards to restoring rootvg?()A、mksysbB、restvgC、AIX install CDsD、Veritas NetBackup
Companycom is considering a partitioned solution which will require cumulative rPerf total of 150. The original sizing came back recommending a 32-way p5 590. However, they have a requirement for future scalability and availability is important. Which of the following would be the best reason to recommend a p5 595?()A、The p5 595 would allow for CODB、The p5 595 includes the Advanced Power Virtualization hardware and softwareC、The p5 595 is priced the same as the p5 590 given the same number/type of CPUsD、The p5 595 performance would be equivalent to the p5 590 given the same number/type of CPUs
Companycom has just added some new disk drives to a p5 590. The customer needs to know the largest Logical Track Group that these drives will support. What is the best way to locate this information?()A、Use lquerypv to read the driveB、Use lspv and look at PP Size valueC、Look on the outside of the drive itselfD、Use bootinfo to find the LTG on the drive
Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak. What is the best configuration to fully utilize the processor resource?()A、Set up the server in SMP mode and use WLM to manage resources effectivelyB、Set up eight dedicated LPARs and use DLPAR to manage resources effectivelyC、Set up a shared pool with eight capped LPARs including production and test/devD、Set up a shared pool with eight uncapped LPARs with priority weight to Production
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A、Free up one HMC and update the software for use with the p5 570B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()A、POWER5 runs in an SMP mode as defaultB、POWER5 can run in a full system mode the same as the p690C、POWER5 can run in full system mode with the purchase of PLMD、POWER5 can run in a full system mode, but it is in LPAR mode
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A、 vmstat and iostat data from the older machines B、 The number of CPUs that were installed in the original machines C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) D、 Performance data that is collected from the new system after it has been put into production
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()A、Upgrade the p690 to a p5 590 server running AIX 5.3B、Upgrade the p690 server to AIX 5.3 and implement Advanced Power VirtualizationC、Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adaptersD、Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization
A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()A、A CD or DVD with installation mediaB、An internal SCSI adapter in the target LPARC、An Ethernet adapter for access to an FTP serverD、Advanced Power Virtualization feature of the p5 590
Companycom has just installed a p5 595 with four uncapped LPARs in a shared processor pool. The system and profile settings are still in their default states. One of the LPARs has an application that is consuming all of the available shared processor resources. Users of this application are complaining about response time. Which of the following changes to the slow LPAR would improve response time?()A、Enable SMTB、Reduce the weightC、Renice the processD、Increase the weight
After rebooting the machine, Companycom notices that the machine is not performing as well as before. The applications are running slower, and their CPU utilization has increased. How can the customer check to see if a CPU was deallocated?()A、Run the vmstat commandB、Run the iostat commandC、Run the lparstat commandD、Check the logs in the /var/adm/ras directory
In which scenario, will you issue the following command?() RMAN REPORT NEED BACKUP DAYS 7;A、 to configure RMAN to maintain backup information in the RMAN repository for seven daysB、 to configure RMAN to maintain backup information in the control file for at least seven daysC、 to display the list of files that have not been backed up for the last seven daysD、 to display the list of files that must be backed up within seven days
After running the CONFIGURE RETENTION POLICY TO RECOVERY WINDOW OF 7 DAYS command, what has been accomplished?()A、Retain the data file backup for 7 days.B、Run the recover process every 7 days.C、Destroy the physical backup files every 7 days.D、Destroy the physical backup files older than 7 days.E、Retain one backup of each data file for at least 7 days.F、Keep the catalog information in the control file for 7 days.
During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()A、The IBM CE will install the cardB、The card will not be supported by IBMC、The AIX device driver should work fineD、The customer is correct, there should be no problem
单选题A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()AA CD or DVD with installation mediaBAn internal SCSI adapter in the target LPARCAn Ethernet adapter for access to an FTP serverDAdvanced Power Virtualization feature of the p5 590
单选题During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()AThe IBM CE will install the cardBThe card will not be supported by IBMCThe AIX device driver should work fineDThe customer is correct, there should be no problem
单选题Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()AEnable DHCP server on the HMCBConfigure host name and IP address on DNS serverCManually set the IP address of the service processorDConnect a RS-232 cable from the HMC to the service processor
单选题After running the CONFIGURE RETENTION POLICY TO RECOVERY WINDOW OF 7 DAYS command, what has been accomplished?()ARetain the data file backup for 7 days.BRun the recover process every 7 days.CDestroy the physical backup files every 7 days.DDestroy the physical backup files older than 7 days.ERetain one backup of each data file for at least 7 days.FKeep the catalog information in the control file for 7 days.
单选题Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()AUtilize the integrated 10/100/1000 network interfaceBImplement Virtual Ethernet to enable inter-partition communicationCImplement shared Ethernet with the Ethernet adapters utilized in the other LPARsDImplement a Point to Point protocol serial communication between the p5 595 serial ports
单选题The vessel has stayed in port for seven days because she needs().ArepairsBrepairingCrepairedDbeing repaired
单选题Companycom has a p5 595 with no DVD configured on this server. How can they install the Virtual IO Server code?()AFrom the HMCBFrom a NFS mountCFrom a FTP serverDFrom any CD or DVD drive on another server
单选题Companycom has seven days of vmstat data on four p5 590 production LPARs of four processors each. The data shows that all four LPARs have periodic utilizations of 90-95% lasting several minutes in duration. However, the average utilizations of the four LPARs were between 15-30%. The vmstat data shows that the peak utilizations of each LPAR do not occur at the same time. Which of the following should be set up?()AA shared pool with four capped LPARsBA shared pool with four uncapped LPARsCFour dedicated LPARs and use DLPAR to manage resources effectivelyDThe server in SMP mode and use WLM to manage resources effectively
单选题A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A vmstat and iostat data from the older machines B The number of CPUs that were installed in the original machines C Data from Workload Estimator (WLE) and IBM Performance Management (PM) D Performance data that is collected from the new system after it has been put into production
单选题Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()AUse shared memory and semaphores to transfer the data to the TSM LPARBProvide gigabit Ethernet adapters in each LPAR and run a crossover cableCCreate a Virtual Ethernet between the production server and the TSM LPARsDCreate a Virtual Ethernet between the TSM server LPAR and the non-production LPARs
单选题A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()AA CD or DVD with installation mediaBAn internal SCSI adapter in the target LPARCAn Ethernet adapter for access to an FTP serverDAdvanced Power Virtualization feature of the p5 590