单选题After making changes to the profile for an LPAR, the administrator asks the operator to bring the LPAR back up into a running state with the new changes. Which of the following is the correct way to do this?()AShutdown and activate the partition profileBReboot the partition using the reboot commandCReboot the partition using the 'shutdown -r' commandDRight click on the partition profile and select the 'apply changes' option
单选题
After making changes to the profile for an LPAR, the administrator asks the operator to bring the LPAR back up into a running state with the new changes. Which of the following is the correct way to do this?()
A
Shutdown and activate the partition profile
B
Reboot the partition using the reboot command
C
Reboot the partition using the 'shutdown -r' command
D
Right click on the partition profile and select the 'apply changes' option
参考解析
解析:
暂无解析
相关考题:
An administrator is creating a new LPAR with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()A、 0B、 1C、 255D、 256
A client is experiencing issues after cloning an LPAR using alt_disk_install. DLPAR functions are not available for the new LPAR. Also, there is a lot of network traffic to the HMC. What is the most probable cause of this problem?()A、DLPAR functions are not available for cloned partitionsB、The new partition has the same node number as the original LPARC、Additional filesets need to be reinstalled after the alt_disk_install cloningD、The speed and duplex settings on the Ethernet adapter on the new LPAR is misconfigured
A system administrator is creating four LPARs on a Power 550. The Power 550 has 64GB of memoryinstalled and 32GB activated. The system administrator sets the minimum dedicated memory to 8GB in the profile for each LPAR. After activating three LPARs, he is not able to activate the fourth LPAR. What is the likely cause of the problem?()A、The Power 550 is licensed for three LPARs only.B、There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. A faulty memory DIMM is detected in the POWER5 550.C、There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The HMC reserves some memory toperform logical partition tasks.D、There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The hypervisor reserves some memory to perform logical partition tasks.
An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can however allocate 512 MB that is free to LPAR 1 on the 570. What is the most likely cause of this failure when dynamically moving memory?()A、 Maxperm% is set too low on LPAR 2B、 Insufficient paging space on LPAR 1C、 Service IBM.DRM is unavailable on LPAR 1D、 Insufficient pinnable memory frames available on LPAR 2
Which of the following procedures will allow an operator to access an LPAR console session?()A、Open a vterm from the VIO graphical interface to get the partition console.B、Open a vterm from the ASMI graphical interface to get the partition console.C、Start an ssh session to the HMC. Use the vtmenu command to select the desired LPAR.D、Start an ssh session to the VIO. Use the vtmenu command to select the desired LPAR.
The administrator changed the number of virtual processors from 1 to 2 in the default_profile of an LPAR. The operator ran thecfgmgr command expecting to see 2 processors after that, but did not see them. What action must be done to apply the changes?()A、Reboot AIX within the LPAR.B、Run cfgmgr against the device sys0.C、Shutdown and then activate the default_profile.D、Ensure the RSCT daemon is operative and run cfgmgr again.
Which command should the administrator use to display the IPL progress/LED code of the partition?()A、lsled -m System -r lpar B、lsrefcode -m System -r lpar C、lshwinfo -m System -r led_code D、lssyscfg -m System -r sys -F lpar_name,led_code
An administrator is creating a new logical partition (LPAR) with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()A、 0B、 1C、 255D、 256
A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing. What action, or sequence of actions, will immediately and permanently solve this problem?()A、Add or remove the resources in the profile, click 'apply', then 'save'.B、Add or remove the resources using DLPAR and change the partition profile.C、Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.D、Add or remove the resources in the system profile and reboot the managed system.
After making changes to the profile for an LPAR, the administrator asks the operator to bring the LPAR back up into a running state with the new changes. Which of the following is the correct way to do this?()A、Shutdown and activate the partition profileB、Reboot the partition using the reboot commandC、Reboot the partition using the 'shutdown -r' commandD、Right click on the partition profile and select the 'apply changes' option
A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()A、In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.B、In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.C、In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.D、In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.
System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()A、The LPAR Configuration backup is corruptB、The LPAR Configuration has been altered using DLPARC、The LPAR Configuration backup was performed on a different HMCD、The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed
The System Administrator wants to do a backup of the HMC and notices that there are two options on the HMC menu: Backup Critical Console data and Save Upgrade Data. Which of the following best describes the differences between the two options?()A、Both options back up user and partition profile data. Only the Backup Critical Console Data backs up TCP/IP settings or preferencesB、Both options back up partition profile information. Only the Backup Critical Console Data backs up service function settings, such as Inventory Scout, Service Agent, and Service Focal PointC、The Backup Critical Console Data should be performed just before the HMC software update operation. The Save Upgrade Data should be performed each time configuration changes are made to the system or the HMCD、The Save Upgrade Data should be performed just before the HMC software update operation. The Backup Critical Console Data should be performed each time configuration changes are made to the system or the HMC
单选题A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing. What action, or sequence of actions, will immediately and permanently solve this problem?()AAdd or remove the resources in the profile, click 'apply', then 'save'.BAdd or remove the resources using DLPAR and change the partition profile.CAdd or remove the resources using DLPAR, then shutdown and reactivate the LPAR.DAdd or remove the resources in the system profile and reboot the managed system.
单选题A client is experiencing issues after cloning an LPAR using alt_disk_install. DLPAR functions are not available for the new LPAR. Also, there is a lot of network traffic to the HMC. What is the most probable cause of this problem?()ADLPAR functions are not available for cloned partitionsBThe new partition has the same node number as the original LPARCAdditional filesets need to be reinstalled after the alt_disk_install cloningDThe speed and duplex settings on the Ethernet adapter on the new LPAR is misconfigured
单选题Which of the following procedures will allow an operator to access an LPAR console session?()AOpen a vterm from the VIO graphical interface to get the partition console.BOpen a vterm from the ASMI graphical interface to get the partition console.CStart an ssh session to the HMC. Use the vtmenu command to select the desired LPAR.DStart an ssh session to the VIO. Use the vtmenu command to select the desired LPAR.
单选题An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can however allocate 512 MB that is free to LPAR 1 on the 570. What is the most likely cause of this failure when dynamically moving memory?()A Maxperm% is set too low on LPAR 2B Insufficient paging space on LPAR 1C Service IBM.DRM is unavailable on LPAR 1D Insufficient pinnable memory frames available on LPAR 2
单选题The System Administrator wants to do a backup of the HMC and notices that there are two options on the HMC menu: Backup Critical Console data and Save Upgrade Data. Which of the following best describes the differences between the two options?()ABoth options back up user and partition profile data. Only the Backup Critical Console Data backs up TCP/IP settings or preferencesBBoth options back up partition profile information. Only the Backup Critical Console Data backs up service function settings, such as Inventory Scout, Service Agent, and Service Focal PointCThe Backup Critical Console Data should be performed just before the HMC software update operation. The Save Upgrade Data should be performed each time configuration changes are made to the system or the HMCDThe Save Upgrade Data should be performed just before the HMC software update operation. The Backup Critical Console Data should be performed each time configuration changes are made to the system or the HMC
单选题System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()AThe LPAR Configuration backup is corruptBThe LPAR Configuration has been altered using DLPARCThe LPAR Configuration backup was performed on a different HMCDThe LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed
单选题An administrator is creating a new LPAR with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()A 0B 1C 255D 256
单选题A system administrator has a pSeries p5-520 2-way with AIX 5L V5.2 with a peak utilization of 50%. There is a request to add a new Web server for a small department. Which of the following solutions is the best fit for this environment?()ACreate a dedicated LPAR for the existing workload and a Micro-Partition for the Web server. BCreate a dedicated LPAR for the existing workload and a dedicated LPAR for the Web server.CCreate a Micro-Partition for the existing workload and a dedicated LPAR for the Web server.DCreate a Micro-Partition for the existing workload and a Micro-Partition for the Web server.
单选题A system administrator is creating four LPARs on a Power 550. The Power 550 has 64GB of memoryinstalled and 32GB activated. The system administrator sets the minimum dedicated memory to 8GB in the profile for each LPAR. After activating three LPARs, he is not able to activate the fourth LPAR. What is the likely cause of the problem?()AThe Power 550 is licensed for three LPARs only.BThere is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. A faulty memory DIMM is detected in the POWER5 550.CThere is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The HMC reserves some memory toperform logical partition tasks.DThere is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The hypervisor reserves some memory to perform logical partition tasks.
单选题An administrator is creating a new logical partition (LPAR) with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()A 0B 1C 255D 256
单选题Which command should the administrator use to display the IPL progress/LED code of the partition?()Alsled -m System -r lpar Blsrefcode -m System -r lpar Clshwinfo -m System -r led_code Dlssyscfg -m System -r sys -F lpar_name,led_code
单选题A system administrator decides to review the system error log after installing new hardware. Which of the following is the correct command to use?()AerrptBsyslogCprtdiagDerrlogger
单选题The administrator changed the number of virtual processors from 1 to 2 in the default_profile of an LPAR. The operator ran thecfgmgr command expecting to see 2 processors after that, but did not see them. What action must be done to apply the changes?()AReboot AIX within the LPAR.BRun cfgmgr against the device sys0.CShutdown and then activate the default_profile.DEnsure the RSCT daemon is operative and run cfgmgr again.
单选题After making changes to the profile for an LPAR, the administrator asks the operator to bring the LPAR back up into a running state with the new changes. Which of the following is the correct way to do this?()AShutdown and activate the partition profileBReboot the partition using the reboot commandCReboot the partition using the 'shutdown -r' commandDRight click on the partition profile and select the 'apply changes' option
单选题A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()AIn the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.BIn the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.CIn the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.DIn the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.