单选题The maintenance work for sailors includes ()(清洁), repairing and painting work on board a ship. 正确答案AAcleaningBcleanerCcleanlyDcleanness
单选题
The maintenance work for sailors includes ()(清洁), repairing and painting work on board a ship. 正确答案A
A
cleaning
B
cleaner
C
cleanly
D
cleanness
参考解析
解析:
暂无解析
相关考题:
Cost of quality includes:A . Appraisal costB . detection costC . prevention costD . maintenance costE . A, B, and C only
150 Cost of quality includes:A. Appraisal costB. detection costC. prevention costD. maintenance costE. A, B, and C only
● Project (69) Management includes the processes required to ensure thatthe project includes all the work required, and only the work required, tocomplete the project successfully.tA.IntegrationB.ScopeC.ConfigurationD.Requiremen
Cleaning, painting and repair work is known as ______.A.maintenance workB.sailor’s workC.daily work
Point out which one of the following items is not in the charge of Chief Officer in repairing operation. ______.A.hull cleaningB.derusting and paintingC.the maintenance of boilerD.docking and undocking
Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.A.IntegrationB.ConfigurationC.ScopeD.Requirement
()includes the processes required to ensure that the project includes all the work required,and only the work required,to compete the project successfully.Managing the project scope is primarily concerned with defining and controlling what is not included in the project.A:Create scopEB:Project stakeholder managementC:Project scope managementD:Project cost management
The maintenance work for sailors includes ()(清洁), repairing and painting work on board a ship. 正确答案AA、cleaningB、cleanerC、cleanlyD、cleanness
清洁,涂漆,修理工作称为船舶保养工作。()A、Cleaning, painting and repairing work are known as sailor’s work.B、Cleaning, painting and repairing work are known as maintenance work.C、Painting, repairing and cleaning work are known as maintenance work.D、Cleaning, painting and repairing work are known as daily work.
The sailors do cleaning and repair work under the supervision of the ().A、chief officerB、captainC、bosunD、second officer
The sailors do cleaning and repair work ()the bosun.A、under the supervision ofB、with the help ofC、in charge ofD、in the charge of
The maintenance work for sailors includes cleaning , repairing, and ()(涂漆) work on board a ship.A、paintingB、painterC、painD、pair
Sailors should know the ()(安全工作负荷量)of derricks.A、safe working loadB、safety work loadC、safe work loadD、safe working loading
Cleaning, painting and repairing work is known as ()work.A、sailors’B、motormen’sC、dailyD、maintenance
Cleaning, painting and repairing are known as maintenance work.()A、清扫,涂漆和修理工作称为维修工作。B、清扫,涂漆和修理工作称为日常工作。C、清扫,涂漆和修理工作称为机工工作。D、清扫,涂漆和修理工作称为水手工作。
Project()Management includes the processes required to ensure that theproj ect includes all the work required, and only the work required, to complete the project successfully.A、IntegrationB、ScopeC、ConfigurationD、Requirement
Project () Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.A、IntegrationB、ScopeC、ConfigurationD、Requirement
A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and have to be ordered. What is the status of the work order, after a maintenance manager has approved the work order? ()A、 Approved (APPR)B、 Waiting on Materials (WMATL)C、 Waiting to be Scheduled (WSCH)D、 Waiting on Plant Condition (WPCOND)
单选题Cleaning, painting and repairing are known as maintenance work.()A清扫,涂漆和修理工作称为维修工作。B清扫,涂漆和修理工作称为日常工作。C清扫,涂漆和修理工作称为机工工作。D清扫,涂漆和修理工作称为水手工作。
单选题The sailors do cleaning and repair work ()the bosun.Aunder the supervision ofBwith the help ofCin charge ofDin the charge of
单选题Cleaning, painting and repairing work is known as ()work.Asailors’Bmotormen’sCdailyDmaintenance
单选题If you work under a car when repairing it, you often get very _____.AwaxyBslipperyCstickyDgreasy
单选题()of the following items is not in the charge of Chief Officer in repairing operation.AHull cleaningBDerusting and paintingCThe maintenance of boilerDDocking and undocking
单选题A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and have to be ordered. What is the status of the work order, after a maintenance manager has approved the work order? ()A Approved (APPR)B Waiting on Materials (WMATL)C Waiting to be Scheduled (WSCH)D Waiting on Plant Condition (WPCOND)
单选题船舶发生溢油事故时,水手的主要工作是清理油污。()AWhen oilspilling happens on board, the sailors’ work is to do oil-cleaning.BWhen oilspilling happens on board, the sailors’ work is painting.CWhen oilspilling happens on board, the sailors’ work is to do some repair work.DWhen oilspilling happens on board, the captain is in over command of it.
单选题Point out which one of the following items is not in the charge of Chief Officer in repairing operation().Ahull cleaningBderusting and paintingCthe maintenance of boilerDdocking and undocking