单选题A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this customer?()Aadd twofibre HBAs to the System i and connect to the SANBadd twofibre HBAs to the System i and connect to the Windows ServersCadd twofibre HBAs to the System i and connect to the System i using VIOSDadd two SAS HBAs to the Systemi array and connect directly to the DS5300

单选题
A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this customer?()
A

add twofibre HBAs to the System i and connect to the SAN

B

add twofibre HBAs to the System i and connect to the Windows Servers

C

add twofibre HBAs to the System i and connect to the System i using VIOS

D

add two SAS HBAs to the Systemi array and connect directly to the DS5300


参考解析

解析: 暂无解析

相关考题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A. operator trainingB. cache size of the two clustersC. fibre bandwidth capability between the sitesD. number of stacked tape drives attached to each cluster

A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()A. z/OS, DS8000, TSMB. TSM, LTO-5, VMwareC. System x, VMware, XIVD. System p, VMware, DS5000

A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated.  The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage.  Each system has the following: ? 2 integrated network ports ?   2 fibre channel adapter cards   ? 1 power supply and redundant cooling   ? HACMP v5.1   In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()A、One fibre channel switchB、Two fibre channel switchesC、Two Ethernet cardsD、Nothing

A customer has multiple applications on multiple open platforms in their current environment based on IBM System Storage DS8100. They plan to set up a business continuity solution that meets the objective of zero or little data loss for their business critical data. The customer has indicated that cost is a factor.  What should the storage specialist recommend()A、a DS8700 in the Business Continuity site with a Metro Mirror licenseB、a DS8700 with SAN Volume Controller in the Business Continuity siteC、a DS8700 in the Business Continuity site with Global Copy licenseD、two new DS5300 servers (production and Business Continuity site) with a Global Copy license

A customer has an IBM System Storage Enterprise Storage Server and several EMC CX3 systems installed in a data center, attached to IBM System p servers. As a step toward data consolidation, they intend to put all data on a new DS8700.  What would be the most important data migration factors to consider()A、sector size and the amount of production dataB、existing RAID levels and the disk drive speedC、sector size and existing RAID levelsD、amount of production data and the disk drive speed

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A、operator trainingB、cache size of the two clustersC、fibre bandwidth capability between the sitesD、number of stacked tape drives attached to each cluster

A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this customer?()A、add twofibre HBAs to the System i and connect to the SANB、add twofibre HBAs to the System i and connect to the Windows ServersC、add twofibre HBAs to the System i and connect to the System i using VIOSD、add two SAS HBAs to the Systemi array and connect directly to the DS5300

A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700.  They would like to upgrade and plan for 40 TB capacity.  The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()A、What are the plans for Disaster Recovery? B、What are the plans for data migration? C、Would iSCSI meet your needs? D、How much space is available in the current storage systems?

A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues.  To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()A、add an expansion frame with additionalFibre Channel portsB、increase the amount of storage by 20 TBC、conduct a Disk Magic study to identify the source of the performance issueD、add additionalFibre Channel ports to the existing DS8700

The customer is looking for a tiered storage solution that allows them to manage different types ofdata within the same system. Further questioning reveals that the reason the customer wants amulti-tiered environment is based on cost. Which IBM single tier solution can provide an enterpriselevel system at a midrange cost?()A、XIV system B、TS3500 C、DS8700 D、DS5300

A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()A、z/OS, DS8000, TSMB、TSM, LTO-5, VMwareC、System x, VMware, XIVD、System p, VMware, DS5000

A Business Partner has proposed an IBM System Storage DS8700 that will have several AIX, Windows, and Sun Solaris servers attached via SAN. The customer has asked for detailed documentation on the steps needed to install the latest adapter drivers.  What is the best document the Business Partner can suggest to accomplish this requirement()A、the IBM System Storage DS8000 Interoperability MatrixB、the IBM System Storage DS8000 Introduction and Planning GuideC、the IBM System Storage DS8000 Host System Attachment GuideD、the IBM System Storage DS8000 User’s Guide

A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.

A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()A、compatibility of copy functionsB、difference in capacities in the two systemsC、cache size discrepancies between the two systemsD、the necessity of using two storage management products

A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing.  This system does not require an HMC.

A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()A、Disk MagicB、TPC for DataC、CLARiiON Procedure GeneratorD、System Storage Interoperability Center

A mainframe customer has requested a proposal to replace an existing storage system. Which information does Disk Magic provide?()A、logical volume sizesB、cache usage by applicationC、storage processor utilizationD、disk capacity needed forFlashCopy

A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()A、What are Disaster RecoveryplansB、What are plans for datamigrationC、What storage system space isavailableD、DoesiSCSI meet the needs

A customer has six Windows 2003 servers, three RedHat Linux servers, and three Netware servers.  The current environment is direct attached storage.  The customer needs a 2Gb Fibre solution that can scale up to 64 partitions over the next three years and provide connectivity to all three platforms.  The customer also needs a fibre attached backup solution.  Which of the following solutions has the best combination of price and performance?()A、A DS4300 Turbo with Fibre Attached Tape LibraryB、A DS4500 with EXP700’s and Fibre Attached Tape LibraryC、A DS4500 with EXP710’s and Fibre Attached Tape LibraryD、A DS4300 with Additional EXP710’s and a SCSI Attached Tape Library

单选题A customer is interested in using two Power 550 servers to implement a new two node cluster. The cluster willbe using SAN attached disk for shared storage and will be attached to one IP network. Which of the followingadapter configurations will meet the customer requirements while reducing single points of failure?()A AB BC CD D

单选题A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems. What performance metric is recommended when evaluating the replacement system?()AIBM CPWBIBM rPerfCSPECint_rate2006DIDEAS International RPE2

单选题A customer has 4 EXP5000 expansion enclosures attached to an IBM System Storage DS5100 intheir production environment, and the same configuration in their disaster recovery environment.The customer removes the drives from the production environment and ships them to the disasterrecovery facility. What IBM technology feature gives the customer the ability to migrate drives fromone DS5000 to another DS5000 with data intact?()ASnapCopyBDACstoreCFlexCloneDRAID Protect

单选题A customer has an existing SP system and needs to add cards to some of the nodes.  Which of the following applications must be used to configure the upgrade?()AMRPDPlus toolBInventory ServicesCPCRS6000 Portable ConfiguratorDeConfig - IBM Configurator for e-Business

单选题A customer has just added additional workload to their IBM System Storage DS5300. They do notfeel they are achieving the performance they expected. Which of the following will provide thecustomer with the most complete historical view of their current DS5300 system performance?()ADisk MagicBCapacity MagicCTivoli Storage Productivity Center for DataDTivoli Storage Productivity Center for Disk - Midrange Edition

单选题A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center.  Which solution  best meets the customer’s requirements()ADS8800 system with three framesBDS8800 system with one frameCDS8700 system with two framesDDS8800 system with two frames

单选题A customer has an IBM System Storage Enterprise Storage Server and several EMC CX3 systems installed in a data center, attached to IBM System p servers. As a step toward data consolidation, they intend to put all data on a new DS8700.  What would be the most important data migration factors to consider()Asector size and the amount of production dataBexisting RAID levels and the disk drive speedCsector size and existing RAID levelsDamount of production data and the disk drive speed

单选题A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()Acompatibility of copy functionsBdifference in capacities in the two systemsCcache size discrepancies between the two systemsDthe necessity of using two storage management products