单选题On an OSV,when may a work vest be substituted for a required life jacket?()ATo replace a damaged life jacketBFor use during fire drillsCFor use during boat drillsDAt no time
单选题
On an OSV,when may a work vest be substituted for a required life jacket?()
A
To replace a damaged life jacket
B
For use during fire drills
C
For use during boat drills
D
At no time
参考解析
解析:
暂无解析
相关考题:
● A calendar that identifies when a project may be performed on an activity is called a:A Project calendar.B Resource calendar.C Milestone point.D Key point.E Work unit.
● Project (69) Management includes the processes required to ensure thatthe project includes all the work required, and only the work required, tocomplete the project successfully.tA.IntegrationB.ScopeC.ConfigurationD.Requiremen
______, where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.A.Voyage repairsB.Routine dockingC.Damage repairsD.Conversion
A life preserver or buoyant work vest is required to be worn on a ship when a person is ______.A.working on the rig floorB.working over waterC.working on the pipe racksD.operating line throwing equipment
On an OSV,when may a work vest be substituted for a required life jacket?A.To replace a damaged life jacketB.For use during fire drillsC.For use during boat drillsD.At no time
The rescue boat on an OSV is not required to carry a ______.A.fishing kitB.searchlightC.sea anchorD.radar reflector
A vessel is underway with a work stage rigged over the side. A seaman may work on the stage,but only when ______.A.wearing a life jacketB.wearing a safety harness secured to the stageC.wearing both a life jacket and a safety harness secured to the stageD.the vessel is not making way
Coast Guard approved buoyant work vests ______.A.may be substituted for 10 percent of the required life preserversB.should be stowed adjacent to lifeboats and emergency stationsC.may be used by boat crews and line handlers during lifeboat drillsD.should be used when carrying out duties near a weather deck's edge
Which statement is TRUE concerning buoyant work vests aboard tankers ________.A.They may be worn while working on deck but not while working over the sideB.They must be used only under supervision of a designated ship's officerC.They will be accepted for up to 10% of the required life preserversD.They may be worn during drills
Which statement is TRUE concerning insulating flanges ________.A.They should be inspected and tested periodically to ensure that the insulation is clean and in good conditionB.Switching off a cathodic protection system may be substituted for using an insulating flangeC.The measured resistance value after installation should be less than 1,000 ohmsD.After the insulating flange is installed,hot work may be performed on deck
When should the emergency position-indicating radio beacon be activated after abandoning an OSV ________.A.ImmediatelyB.After one hourC.Only when another vessel is in sightD.Only after sunset
For GMDSS,when may a compulsory vessel not be allowed to leave port ________.A.When the vessel is in an overloaded conditionB.When the vessel has arranged for both duplication of equipment AND shore-based maintenanceC.When the vessel has replaced a required piece of GMDSS-related equipment but its performance has not been verified or loggedD.When the vessel is carrying only two licensed GMDSS Radio Operators and is capable of performing all required functions
Which narrative regarding loading software is incorrect?()A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD、A Loading Program may be provided as a classification requirement or as an Owner’s option
Project()Management includes the processes required to ensure that theproj ect includes all the work required, and only the work required, to complete the project successfully.A、IntegrationB、ScopeC、ConfigurationD、Requirement
Project () Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.A、IntegrationB、ScopeC、ConfigurationD、Requirement
单选题Each EPIRB required on an OSV shall be tested using the integrated test circuit and output indicator every().AweekBtwo weeksCmonthDtwo months
单选题When should the emergency position-indicating radio beacon be activated after abandoning an OSV?()AImmediatelyBAfter one hourCOnly when another vessel is in sightDOnly after sunset
单选题You are on a vessel that cannot comply with the spacing requirement for masthead lights.What is required in this situation().AThe vessel must carry only the lights that comply with the rules; the others may be omittedBThe vessel's lights must comply as closely as possible,as determined by her governmentCThe vessel must be altered to permit full compliance with the rulesDAn all-round light should be substituted for the after masthead light and the stern light
单选题The prohibition against displaying lights which may be confused with required navigation lights applies().Afrom sunset to sunrise and during restricted visibilityBonly when other vessels are in the areaConly when operating in a traffic separation schemeDonly when under tow
单选题Which item may be substituted for,in the fireman’s outfit,on a cargo vessel?()Afire axBflashlightCrigid helmetDflame safety lamp
单选题When required to work where there may be explosive gases, you should use tools which are ()Aapproved by the Coast GuardBhigh carbon steelCfixed with a ferrous coverDnonsparking
单选题A vessel is underway with a work stage rigged over the side. A seaman may work on the stage,but only when().Awearing a life jacketBwearing a safety harness secured to the stageCwearing both a life jacket and a safety harness secured to the stageDthe vessel is not making way
单选题(),where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.AVoyage repairsBRoutine dockingCDamage repairsDConversion
单选题What material may be substituted for zinc when making a poured metal socket ending to a wire rope().ALeadBBabbittCSolderDNothing
单选题Dangerous goods required to be “carried on deck only” should not be carried on closed vehicle decks,but may be carried on open vehicle deck when authorized by the competent authority concerned. ()Aunder deckBon deckCondeck onlyDunder deck only
单选题On a ship,when may a work vest be substituted for a required life preserver?()ATo replace a damaged life preserverBFor use during fire drillsCFor use during boat drillsDAt no time
单选题A life preserver or buoyant work vest is required to be worn on a ship when a person is ().Aworking on the rig floorBworking over waterCworking on the pipe racksDoperating line throwing equipment
单选题Coast Guard approved buoyant work vests().Amay be substituted for 10 percent of the required life preserversBshould be stowed adjacent to lifeboats and emergency stationsCmay be used by boat crews and line handlers during lifeboat drillsDshould be used when carrying out duties near a weather deck's edge