单选题Survival practice in the mooring system is to slack off the tensions on the leeward side and().Adeballast the unit to transit draftBadjust as evenly as practical the windward tensionsCrelease the anchors on the windward sideDtighten the anchor buoys on the leeward side anchors

单选题
Survival practice in the mooring system is to slack off the tensions on the leeward side and().
A

deballast the unit to transit draft

B

adjust as evenly as practical the windward tensions

C

release the anchors on the windward side

D

tighten the anchor buoys on the leeward side anchors


参考解析

解析: 暂无解析

相关考题:

To “EASE” A LINE means to ___ .A.cast offB.double up so that one line does not take all the strainC.pay out line to remove most of the tensionD.slack it off quickly

A storm is forecast for the area where your vessel is moored. For its safety you should put ______.A.more slack in the mooring linesB.a strain on the mooring linesC.chafing gear on the mooring linesD.grease on the mooring lines

Connecting elements of a mooring system should be fabricated from ______.A.cast ironB.forged steelC.stainless steelD.cast steel

An on-load release system on a survival craft means the cable can be released ______.A.only when the load is taken off the cableB.only when there is a load on the cableC.only when activated by the controls at the lowering stationD.at any time

Given the same water depth and line tension, the holding power of a 19 pound / foot wire rope mooring system in comparison to the holding power of a 90 pound / foot chain mooring system will be ______.A.weakerB.equalC.greaterD.Indeterminable

In order to pay out or slack a mooring line which is under strain, you should ______.A.sluice the lineB.surge the lineC.stopper the lineD.slip the line

We must()the mooring lines when the tide rises and falls.A、slack awayB、take onC、take inD、adjust

This mooring line is a little slack. Please ()it.A、fastB、fastenC、slack awayD、slack

You should slack the mooring lines ()when the wind is big.A、at the same timeB、on timeC、in timeD、at times

单选题The backup system on an electric start survival craft is a().Ahydraulic systemBpneumatic systemCspare batteryDhand crank

单选题In order to pay out or slack a mooring line which is under strain,you should().Asluice the lineBsurge the lineCstopper the lineDslip the line

单选题The sprinkler system of a survival craft is used to().Acool the craft in a fireBcool the engineCspray oil on the sea to calm itDspray personnel during a fire

单选题Two mooring lines may be placed on the same bollard and either one cast off first if().Athe eye of the second line is dippedBthe mooring lines are doubledCthe bollard has two hornsDone of the lines is a breast line

单选题What is likely to occur when you are surging synthetic mooring lines on the gypsyhead during mooring operations?()AThe lines may jam and then jump off the gypsyheadBIf there is sudden strain on the line,the man tending the line may be pulled into the gypsyheadCThe lines' surging may cause the vessel to surgeDThe heat generated may cause the lines to temporarily fuse to the gypsyhead

单选题You should slack the mooring lines ()when the wind is big.Aat the same timeBon timeCin timeDat times

单选题In an automatic mooring winches, the wire is paid off the barrel at() a tension and is recovered at()tension.Alower;igherBmaximum;higherCpredetermined minimum;higherDpredetermined maximum;lower

单选题A mooring system that results in a spread system without anchor buoys is called a().Apermanent chasing systemBwire rope mooring systemCshepherd's crook mooring systemDspring buoy mooring system

单选题A storm is forecast for the area where your vessel is moored. For its safety you should put ().Amore slack in the mooring linesBa strain on the mooring linesCchafing gear on the mooring linesDgrease on the mooring lines

单选题The most doubtful and unpredictable factor in a mooring system is the().Aability of the anchors to hold in a seabedBanchor chain catenary lengthCvariability of the fairleadDangle of the flukes

单选题If the engine of a survival craft does not start,check to see().Athat the fuel valve is openBif the air supply system is openCif the water sprinkler system is openDif the limit switch is on

单选题An on-load release system on a survival craft means the cable can be released().Aonly when the load is taken off the cableBonly when there is a load on the cableConly when activated by the controls at the lowering stationDat any time

单选题Given the same water depth and line tension,the holding power of a 19 pound/foot wire rope mooring system in comparison to the holding power of a 90 pound/foot chain mooring system will be().AweakerBequalCgreaterDindeterminable

单选题This mooring line is a little slack. Please ()it.AfastBfastenCslack awayDslack

单选题Connecting elements of a mooring system should be fabricated from().Acast ironBforged steelCstainless steelDcast steel

单选题When checking a mooring line,you should().Aensure the bight is not fouled between the ship and the dock by taking up slackBpay out slack smartly and keep free for runningCsecure more turns to hold the line against any strain,then clear the areaDsurge the line so that it maintains a strain without parting

单选题The principal action in changing from transit to survival draft in the event heavy weather threatens is().AballastingBdeballastingCdisconnectingDhanging off

单选题In a storm,the leeward lines of a ship’s mooring system will().Apull the unit in the same direction that the weather is pushing itBpull the unit in the opposite direction that the weather is pushing itCtend to keep the unit on its original location over the well headDaffect the unit's draft and inclination as maximum mooring tensions are reached