单选题When doing the Solution Assurance for a p5 570 with several LPARs, it is discovered that the customer plans to back the system up using mksysb. The customer would like to do unattended automated system backups and incorporate them into their off-site data recovery system. Which mksysb solution should be implemented?()AA local DVD-ROM driveBA NFS mount on a NIM MasterCA SSA disk array and mirror the dataDA local tape drive and use DLPAR to move the tape to each LPAR
单选题
When doing the Solution Assurance for a p5 570 with several LPARs, it is discovered that the customer plans to back the system up using mksysb. The customer would like to do unattended automated system backups and incorporate them into their off-site data recovery system. Which mksysb solution should be implemented?()
A
A local DVD-ROM drive
B
A NFS mount on a NIM Master
C
A SSA disk array and mirror the data
D
A local tape drive and use DLPAR to move the tape to each LPAR
参考解析
解析:
暂无解析
相关考题:
Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()A、Design the solution and present it confidently so the customer does not question it.B、Design the solution and ensure the customer understands the unknowns with the new technology.C、Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.D、Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A、Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB、Use DLPAR to move resources from the test LPAR to training when training is activeC、Install Partition Load Manager to share resources between the test and training environmentsD、Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
When doing the Solution Assurance for a p5 570 with several LPARs, it is discovered that the customer plans to back the system up using mksysb. The customer would like to do unattended automated system backups and incorporate them into their off-site data recovery system. Which mksysb solution should be implemented?()A、A local DVD-ROM driveB、A NFS mount on a NIM MasterC、A SSA disk array and mirror the dataD、A local tape drive and use DLPAR to move the tape to each LPAR
A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()A、Implementing CoDB、Using Express Configurations with processor upgradesC、Meeting the minimum Value Pak rulesD、Engaging the pSeries representative to identify appropriate discounts
The customer is planning a new IBM System Storage DS5020 using iSCSI and direct attachedfibre channel connectivity in a redundant configuration. The customer is planning to set up adisaster recovery solution in the near future by using Enhanced Remote Mirroring. Which of thefollowing considerations are critical for this customer?()A、customer must reconfigure aniSCSI port for mirroringB、customer must set up a fabric and dedicate port 4 for disaster recoveryC、customer must set up a fabric and dedicate port 2 for disaster recoveryD、replication is not possible with the DS5020, they must consider the DS5300
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()A、Direct the customer to the Installation Guide for each system to identify the power requirements.B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()A、Configure a 2 node x3950 X5 B、Customer needs a System p server to support Oracle applications C、Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing D、Configure a system that meets the minimum requirements
A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()A、Verification of the expected performance of the new solution.B、A document used by IBM manufacturing to build and ship the system solution.C、An IBM Quality Assurance Certificate which is supplied to the customer with the system.D、A list of actions that are recommended to reduce risk and create a successful implementation.
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()A、What are Disaster RecoveryplansB、What are plans for datamigrationC、What storage system space isavailableD、DoesiSCSI meet the needs
A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()A、The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.B、The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.C、The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.D、The POWER5 system supports more partitions and has the lowest partitioning overhead.
A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center. Which solution best meets the customer’s requirements()A、DS8800 system with three framesB、DS8800 system with one frameC、DS8700 system with two framesD、DS8800 system with two frames
Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()A、The customer is looking for a fibre SAN solution to increase reliability and performance.B、The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.C、The customer is cost-conscious and is looking for a centralized storage solution.D、The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()A、Use eConfig to configure and validate each pSeries and p5 system.B、Engage Advanced Technical Support to review any outstanding technical issues.C、Confirm with the customer that the solution design meets their requirements.D、Perform a Pre-Install Solution Assurance Review to validate required power requirements.
单选题Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()ADesign the solution and present it confidently so the customer does not question it.BDesign the solution and ensure the customer understands the unknowns with the new technology.CExplain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.DExplain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
单选题A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()AConfigure a 2 node x3950 X5 BCustomer needs a System p server to support Oracle applications CDownload the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing DConfigure a system that meets the minimum requirements
单选题A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()AImplementing CoDBUsing Express Configurations with processor upgradesCMeeting the minimum Value Pak rulesDEngaging the pSeries representative to identify appropriate discounts
单选题A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()AVerification of the expected performance of the new solution.BA document used by IBM manufacturing to build and ship the system solution.CAn IBM Quality Assurance Certificate which is supplied to the customer with the system.DA list of actions that are recommended to reduce risk and create a successful implementation.
单选题A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()AThe POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.BThe POWER5 system supports more partitions, processors, and memory than any competitor’s solution.CThe POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.DThe POWER5 system supports more partitions and has the lowest partitioning overhead.
单选题A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()ADirect the customer to the Installation Guide for each system to identify the power requirements.BDirect the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.CDirect the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.DDirect the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
单选题The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()AUse eConfig to configure and validate each pSeries and p5 system.BEngage Advanced Technical Support to review any outstanding technical issues.CConfirm with the customer that the solution design meets their requirements.DPerform a Pre-Install Solution Assurance Review to validate required power requirements.
单选题A customer would like to implement an IBM System Storage DS8000 solution that requires 225 TB raw capacity. They are convinced that 450 GB is the optimum size for their business applications. There is limited space available for additional machines in the data center. Which solution meets best this requirement()ADS8700 system with three framesBDS8800 system with threeframeCDS8700 system with two framesDDS8800 system with two frames
单选题A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()AWhat are Disaster RecoveryplansBWhat are plans for datamigrationCWhat storage system space isavailableDDoesiSCSI meet the needs
单选题A customer requests a solution that will enhance the availability of their servers and ensure that the time needed to recover from an Operating System fault is at a minimum. What solution do you recommend? ()AUse RAID protection and add more memoryBInstall Operating System in RAID 0 (Parity) Disk ConfigurationCInstall Operating System in RAID 5 Disk ConfigurationDUse RAID protection and ensure systems are backed-up daily
单选题Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()AThe customer is looking for a fibre SAN solution to increase reliability and performance.BThe customer wants to implement an energy-efficient solution to comply with their Go Green initiative.CThe customer is cost-conscious and is looking for a centralized storage solution.DThe customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
单选题Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()AFree up one HMC and update the software for use with the p5 570BConnect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCCOrder a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570DBackup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
单选题A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center. Which solution best meets the customer’s requirements()ADS8800 system with three framesBDS8800 system with one frameCDS8700 system with two framesDDS8800 system with two frames
单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()AUse AIX 5.3 which supports micro-partitioning for both the test and training LPARSBUse DLPAR to move resources from the test LPAR to training when training is activeCInstall Partition Load Manager to share resources between the test and training environmentsDInstall Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs