单选题A healthcare customer is not satisfied with the utilization of their heterogeneous storage devices. Which of the following solutions should the System x technical representative recommend to better provision their storage on demand?()ATivoli Storage Manager (TSM) BIBM SAN Volume Controller (SVC)CIBM TotalStorage Productivity Center (TPC)DTivoli Provisioning Manager (TPM)
单选题
A healthcare customer is not satisfied with the utilization of their heterogeneous storage devices. Which of the following solutions should the System x technical representative recommend to better provision their storage on demand?()
A
Tivoli Storage Manager (TSM)
B
IBM SAN Volume Controller (SVC)
C
IBM TotalStorage Productivity Center (TPC)
D
Tivoli Provisioning Manager (TPM)
参考解析
解析:
暂无解析
相关考题:
(b) (i) State the condition that would need to be satisfied for the exercise of Paul’s share options in Memphisplc to be exempt from income tax and the tax implications if this condition is not satisfied.(2 marks)
Customer service is the service or care that a consumer receives before, during and after a purchase. It's one of the factors that come in to play when a consumer is determining buying value, the other is the quality of the product or service that is being____1____Consumers often must encounter an experience to not only be a satisfied customer, but a loyal customer. Customer service is a part of that experience.Top notch service will create______2___and a returning customer, which is what we all must strive for.Excellent customer service is____3____to businesses today. It's a component that is often missing, unfortunately. How do you provide great customer service? Always make your customer a ____4___. Greet them in a friendly manner, whether that be via telephone, email or in person.Let them know you are there to help and that you will take care of them, not only before the sale but after as well. After all, in a thriving business customers are not ____5____; it's a requirement for businesses to survive.A. vitalB. optionalC. priorityD. offeredE. loyalty
Phase I and Phase II DMVPN differ in terms of which of these characteristics?()A、Utilization of spoke-to-spoke dynamic tunnelsB、Utilization of multipoint GRE tunnels at the hub siteC、Utilization of hub-to-spoke dynamic tunnelsD、Support for multicast
A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()A、Suggest a cloud networkB、Direct the customer to redbooks and white papers on FC technologiesC、Work with business partner to include Lab Service engagement to setup FC environment and perform knowledge transferD、Switch project to iSCSI
A healthcare customer has an IBM System i server and an HP-UX server. They have high performance I/O, image-based, and archival applications. The customer has asked the IBM team for guidance on IBM DS8000 disk technologies. Which DS8000 disk technology would provide the best performance without regard to cost to meet the customer requirement()A、73 GB 15k and 300 GB 15k drivesB、73 GB SSD and 2TB 7.2k drivesC、146 GB 15k and 300 GB 15k drivesD、146 GB 15k and 2TB 7.2k drives
A customer has one mainframe and ten open system servers in their current environment. They plan to add the servers to an IBM DS8700 system with four array sites. How many extent pools should be created to provide the best resource utilization of the DS8700()A、1B、2C、4D、6
A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%. Which of the following supports this requirement?()A、Active Memory ServerB、Active Memory SharingC、Active Memory PoolingD、Active Memory Expansion
A customer is in the initial stages of implementing a server consolidation project. The Information Technology staff has identified several Microsoft Windows servers that are running single applications on older hardware and averaging under 20% utilization. Part of their server consolidation goal is to lower the number of servers, decrease the operating system license cost, and increase utilization per server. Which of the following IBM Director extensions could be used to satisfy all of these requirements?()A、Aurema Application Workload ManagerB、Remote Deployment ManagerC、Virtual Machine ManagerD、Capacity Manager
Selling the total solution includes adding services and financing options which ensures your customer will remain satisfied with their purchase. Which of the following best describes the benefits of Selling options, storage, services, and financing to your clients?()A、More face time with the executivesB、Enhanced credibility, higher profits, less competitive pressureC、One source for elements, cleaner design, simpler supportD、Locks competitors out of account
A prospective customer has selected Fiber Channel (FC) for performance reasons. The prospect does not appear to understand the terminology and options of the fiber channel but is very interested in learning before investing money in this technology. What steps should be taken to make sure the customer is satisfied with the solution?()A、Send customer links to documentation for the FC components included in the solutionB、Direct the customer to Red Books and White Papers on FC technologiesC、Work with business partner to include Lab Services engagement to setup FC environment and perform knowledge transferD、Switch toiSCSI
A customer wants to deploy the latest ServeRAID driver and firmware updates to 25 servers on their LAN. This needs to be accomplished during off peak hours when LAN utilization is at its lowest. Which IBM Director component would be used to accomplish this?()A、Update Express CDB、Update AssistantC、Process ManagementD、Remote Deployment Manager
A retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere. Which of the following should be discussed with this customer?()A、Consider two servers for redundancy and failoverB、Web content static or dynamic informationC、Processor utilization of the existing web serversD、SCSI orFibre Channel storage solution
A customer wants to improve the utilization of the current capacity of their existing N series Tier 1production storage. What solution would the storage specialist discuss with the customer?()A、 compression with IBM Real-time Compression Appliances B、 deduplication with IBM ProtecTIER C、 virtualization with IBM SVC D、 file virtualization with SONAS
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()A、Install a p615 per application.B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.C、Install the appropriate solution once the requirements are understood.D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.
An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()A、Turn over current design to Techline to create configurationsB、Perform knowledge transfer of design requirements to Business partner then disengageC、Work with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)D、Work with business partner to engage Techline to create configurations
A prospective customer has selected Fiber Channel (FC) for performance reasons. The prospect does not appear to understand the terminology and options of the fiber channel but is very interested in learning before investing money in this technology.What steps should be taken to make sure the customer is satisfied with the solution?()A、Send customer links to documentation for the FC components included in the solution B、Direct the customer to Red Books and White Papers on FC technologies C、Work with business partner to include Lab Services engagement to setup FC environment and perform knowledge transfer D、Switch to iSCSI
Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day period LPAR 1: Average utilization was 15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100% LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was 35%, Peak utilization was 100% If the customer has a requirement for all four LPARs to be moved to a p5 590 and assigned to a shared pool. Which of the following would best describe the profile requirements?()A、LPARs 1 and 2, capped, SMT on, Weights between 25-30, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, uncapped, SMT on, Weights between 100-130, min CPU 2.7, max CPU 3.0B、LPARs 1 and 2, capped, SMT on, Weights between 100-130, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, uncapped, SMT on, Weights between 25-30, min CPU 2.7, max CPU 3.0 C、LPARs 1 and 2, uncapped, SMT on, Weights between 25-30, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, capped, SMT on, Weights between 100-130, min CPU 2.7, max CPU 3.0D、LPARs 1 and 2, uncapped, SMT off, Weights between 25-30, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, capped, SMT on, Weights between 100-130, min CPU 2.7, max CPU 3.0
单选题A customer wants to improve the utilization of the current capacity of their existing N series Tier 1production storage. What solution would the storage specialist discuss with the customer?()A compression with IBM Real-time Compression Appliances B deduplication with IBM ProtecTIER C virtualization with IBM SVC D file virtualization with SONAS
单选题Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day period LPAR 1: Average utilization was 15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100% LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was 35%, Peak utilization was 100% If the customer has a requirement for all four LPARs moved to a p5 590 and to have dedicated CPU resources. Which of the following would best describe the profile requirements?()ALPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 BLPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 2.0, max CPU 3.0, desired CPU 3.0 CLPARs 1 and 2, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 3.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 DLPARs 1 and 2, SMT off, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT off, min CPU 1.0, max CPU 3.0, desired CPU 3.0
问答题Practice 3 Discussion—about 5 minutes In this part of the test you are given a discussion topic. You have 30 seconds to look at the task promptly, an example of which is below, and then about three minutes to discuss the topic with your partner. After that the examiner will ask you more questions related to the topic. For two candidates Satisfaction Survey The company you work for has conducted a satisfaction survey. We all know customer satisfaction is essential to the survival of our businesses. You have been asked to find out whether customers are satisfied. Discuss the situation together, and decide: ● how to find out whether the customers are satisfied ● what to ask in a customer satisfaction survey.
单选题A healthcare customer is not satisfied with the utilization of their heterogeneous storage devices. Which of the following solutions should the System x sales professional recommend to better provision their storage on demand?()ATivoli Storage Manager (TSM)BSAN Volume Controller (SVC)CTotalStorage Productivity Center (TPC)DTivoli Provisioning Manager
单选题A customer is looking to add disk storage. They are not satisfied with their existing EMCCLARiiON CX4-240. Instead of adding storage to the CX4, the customer wants to add a newsystem and migrate the LUNs from the EMC to the new storage system over a 6 month period,and not have any system disruption during this time. They are also interested in consolidating diskstorage management. Given these specifications, which of the following solutions would satisfythis customer’s requirements?()ADS5100 and SAN Volume ControllerBDS5100 and Tivoli Storage ManagerC2 DS5100 systems with Remote MirroringDDS5100 and Tivoli Storage Productivity Center for Data
单选题Which of the following customer requirements is the TS7650G Gateway designed to address?()Alatency across a long distance network Bhigh-speed backup of large video files Cimprove the throughput of tape backups Dreduce cost and increase storage capacity utilization