单选题What term indicates the line drawn at the top of the flat plate keel().ABase lineBMolded lineCDesigner's waterlineDKeel line
单选题
What term indicates the line drawn at the top of the flat plate keel().
A
Base line
B
Molded line
C
Designer's waterline
D
Keel line
参考解析
解析:
暂无解析
相关考题:
The term "inventory" indicates () A. merchandise held for sale in the normal course of businessB. materials in the process of production or held for productionC. suppliesD. both A and B
What is talk mainly about?A. The history of the term.B. The courses for the term.C. The plan for the day.
Bottom line is an informal term for ______. A、top lineB、net incomeC、total revenueD、gross profit
Which line from the output of the show ip interface command indicates that there is a Layer 1 problem?A.Serial0/1 is up, line protocol is downB.Serial0/1 is down, line protocol is downC.Serial0/1 is up, line protocol is upD.Serial0/1 is administratively down, line protocol is downE.None of the above
What command visualizes the general NetFlow data on the command line?() A.show ip flow exportB.show ip flow top-talkersC.show ip cache flowD.show mls samplingE.show mls netflow ip
What is good about the flat?A It has a large sitting roomB It has good furnitureC It has a big kitchen
A predictable result of a vessel nearing a bank or edge of a channel is that the ______.A.stern is drawn to the bank as the bow sheers offB.bow sheers toward the bankC.vessel continues in a straight line,but with greatly reduced maneuverabilityD.vessel will be drawn bodily into the bank unless the engines are stopped
The path that a vessel is expected to follow,represented on a chart by a line drawn from the point of departure to the point of arrival,is the ______.A.DR plotB.track lineC.headingD.estimated course
Laying out a line in successive circles flat on deck with the bitter end in the center is known as ______.A.coilingB.fakingC.flemishingD.Lining
What command visualizes the general NetFlow data on the command line?()A、show ip flow exportB、show ip flow top-talkersC、show ip cache flowD、show mls samplingE、show mls netflow ip
Which line from the output of the show ip interface command indicates a layer 1 problem?()A、Serial0/1 is up, line protocol is downB、Serial0/1 is down, line protocol is downC、Serial0/1 is up, line protocol is upD、Serial0/1 is administratively down, line protocol is down
Which configuration causes RIP-learned routes to be advertised to other RIP neighbors?()A、set protocol rip no-passiveB、top edit policy-options policy-statement demo set term 1 from protocol rip set term 1 then accept top set protocols rip group internal export demoC、set protocols rip advertise in-outD、top edit policy-options policy-statement demo set term 1 from active routes set term 1 then accept top set protocols rip group internal export demo
单选题What term indicates the line drawn at the top of the flat plate keel().ABase lineBMolded lineCDesigner's waterlineDKeel line
单选题What is meant by the term two-blocked().AThe bottom block touches the top blockBThe line has jumped the sheavesCThere are turns in the fallDYou have two blocks
单选题A term applied to the bottom shell plating in a double-bottom ship is().Abottom floorBouter bottomCshear platingDtank top
单选题What term indicates a curvature of the decks in a longitudinal direction?()ADeadriseBCamberCSheerDFlare
单选题What command visualizes the general NetFlow data on the command line?()Ashow ip flow exportBshow ip flow top-talkersCshow ip cache flowDshow mls samplingEshow mls netflow ip
单选题The irregular black line around a charted light such as Race Rock Light indicates that it is ().AunwatchedBsurrounded by riprapCa minor lightDconstructed on an artificial island
单选题A predictable result of a vessel nearing a bank or edge of a channel is that the().Astern is drawn to the bank as the bow sheers offBbow sheers toward the bankCvessel continues in a straight line,but with greatly reduced maneuverabilityDvessel will be drawn bodily into the bank unless the engines are stopped
单选题Which configuration causes RIP-learned routes to be advertised to other RIP neighbors?()Aset protocol rip no-passiveBtop edit policy-options policy-statement demo set term 1 from protocol rip set term 1 then accept top set protocols rip group internal export demoCset protocols rip advertise in-outDtop edit policy-options policy-statement demo set term 1 from active routes set term 1 then accept top set protocols rip group internal export demo
单选题The term that indicates how many tons of cargo a vessel can carry is().Abale cubicBdeadweightCgross tonnageDloaded displacement
单选题What defines a great circle? ()AA curved line drawn on a Mercator ChartBA course line that inscribes a loxodromic curveCThe shortest distance between any two points on the earthDThe smallest circle that can be drawn on the face of a sphere
单选题Laying out a line in successive circles flat on deck with the bitter end in the center is known as().AcoilingBfakingCflemishingDlining
单选题The path that a vessel is expected to follow,represented on a chart by a line drawn from the point of departure to the point of arrival,is the().ADR plotBtrack lineCheadingDestimated course
单选题The angular movement of a vessel about a horizontal line drawn from its bow to its stern is ().ApitchingBrollingCheavingDswaying
单选题()shall be provided in every cargo tank and slop tank in accordance with the appropriate Resolutions.AA load on top systemBDirect line systemCCircle line systemDAn inert gas system