单选题The pSeries technical specialist has been asked to verify a solution that has six servers connecting to a 7316-TF3 rack-mounted flat-panel console. Each server will connect into the 4202 Keyboard/Video/Mouse (LCM Switch). What is the minimum number of KVM Conversion Cable Options (FC 4268) required to complete this installation?()A1B2C6D8
单选题
The pSeries technical specialist has been asked to verify a solution that has six servers connecting to a 7316-TF3 rack-mounted flat-panel console. Each server will connect into the 4202 Keyboard/Video/Mouse (LCM Switch). What is the minimum number of KVM Conversion Cable Options (FC 4268) required to complete this installation?()
A
1
B
2
C
6
D
8
参考解析
解析:
暂无解析
相关考题:
A company has a small network,consisting of a single switch and a single router.The switch has been configured with two vlans,and route-on-a-stick is being configured on the router for inter-vlan routing.A trunk is configured to connect the switch to the router.What is the minimum number of router subinterfaces that are required for all the vlans to communicate?()A. oneB. threeC. twoD. zero
A company has a small network,consisting of a single switch and a single router. The switch has been configured with two vlans,and route-on-a-stick is being configured on the router for inter-vlan routing. A trunk is configured to connect the switch to the router.What is the minimum number of router subinterfaces that are required for all the vlans to communicate?()A.oneB.threeC.twoD.zero
A company has a small network,consisting of a single switch and a single router.The switch has beenconfigured with two vlans,and route-on-a-stick is being configured on the router for inter-vlan routing.Atrunk is configured to connect the switch to the router.What is the minimum number of router subinterfacesthat are required for all the vlans to communicate?()A、oneB、threeC、twoD、zero
A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated. The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage. Each system has the following: ? 2 integrated network ports ? 2 fibre channel adapter cards ? 1 power supply and redundant cooling ? HACMP v5.1 In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()A、One fibre channel switchB、Two fibre channel switchesC、Two Ethernet cardsD、Nothing
Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()A、Design the solution and present it confidently so the customer does not question it.B、Design the solution and ensure the customer understands the unknowns with the new technology.C、Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.D、Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()A、Ensure Director Agent is installed on the new servers.B、Ensure a DHCP Sever is installed and configured in the environment.C、Ensure Server Plus Pack option has been installed and configured.D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.
A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()A、Implementing CoDB、Using Express Configurations with processor upgradesC、Meeting the minimum Value Pak rulesD、Engaging the pSeries representative to identify appropriate discounts
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()A、The technical support specialist has completed a UNIX course at college.B、The technical specialist has supported several similar projects and has earned an IBM AIX certification.C、The technical support specialist’s company sells $3M of UNIX computer systems every year.D、The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web server to support the release of a product. The systems architect has recommended that the Web server will require a whole CPU. Which of the following should the technical specialist suggest to provide the most cost-effective deployment?()A、Remove one application server partition and apply its CPU resources to the Web server.B、Reassign the CPU from one of the VIO servers and create the new partition.C、Add 0.6 CPU to one of the application servers and run the Web service with the application. D、Reassign a total of 0.4 CPUs from the application servers and create a new partition with awhole CPU for new deployment.
Acustomer has requested an IBM System Storage DS8300 system for a new Exchange 2003 email solution to meet the following requirements: - 20% yearly growth - 25,000 mail boxes - approximately 50/50 mix of read/write operations The storage specialist has used Capacity Magic to calculate a base configuration of 46.7 TB raw capacity, 64 GB cache, and 24 ports for the DS8300. The storage specialist has been asked to model this configuration using the expected workload to verify that it is a viable solution. What is needed to start modeling()A、73GB 15k rpm drivesB、the amount of IOPS per mail boxC、the number of servers running ExchangeD、the Jetstress tool to emulate the Exchange environment
A pSeries technical specialist has been asked to provide a server consolidation solution to replace several AIX servers running typical commercial database workloads. Benchmarks for SPECint, SPECfp, SPECjbb as well as estimates of ROLTP and rPerf are available for all the current systems. Which of the following could be used as a first approximation of total performance required for one large server?()A、Sum of SPECfp valuesB、Sum of rPerf values onlyC、Sum of rPerf and ROLTP valuesD、Sum of SPECint and SPECjbb values
A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()A、Are there any errors in the error log? Do they indicate any hardware or software errors?B、Has performance data been collected? What do the results show in terms of I/O statistics?C、Has performance data been collected? What do the results show in terms of CPU utilization? D、What type of SAN switch is the customer using? What are the microcode levels on the switch?
The pSeries technical specialist has been asked to verify a solution that has six servers connecting to a 7316-TF3 rack-mounted flat-panel console. Each server will connect into the 4202 Keyboard/Video/Mouse (LCM Switch). What is the minimum number of KVM Conversion Cable Options (FC 4268) required to complete this installation?()A、1B、2C、6D、8
The pSeries technical specialist of a Premier Tier 1 Business Partner has been working on a design for a four LPAR p5-570 Express solution. The specialist has received conflicting information regarding sharing the IDE DVD-RAM drive between different LPARs. Who should the technical specialist contact to gain a definitive answer?()A、IBM BPSOB、IBM PartnerlineC、IBM DistributorD、IBM Supportline
单选题A company has a small network,consisting of a single switch and a single router.The switch has beenconfigured with two vlans,and route-on-a-stick is being configured on the router for inter-vlan routing.Atrunk is configured to connect the switch to the router.What is the minimum number of router subinterfacesthat are required for all the vlans to communicate?()AoneBthreeCtwoDzero
单选题Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()ADesign the solution and present it confidently so the customer does not question it.BDesign the solution and ensure the customer understands the unknowns with the new technology.CExplain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.DExplain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
单选题A pSeries technical specialist has been asked to provide a server consolidation solution to replace several AIX servers running typical commercial database workloads. Benchmarks for SPECint, SPECfp, SPECjbb as well as estimates of ROLTP and rPerf are available for all the current systems. Which of the following could be used as a first approximation of total performance required for one large server?()ASum of SPECfp valuesBSum of rPerf values onlyCSum of rPerf and ROLTP valuesDSum of SPECint and SPECjbb values
单选题A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated. The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage. Each system has the following: ? 2 integrated network ports ? 2 fibre channel adapter cards ? 1 power supply and redundant cooling ? HACMP v5.1 In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()AOne fibre channel switchBTwo fibre channel switchesCTwo Ethernet cardsDNothing
单选题A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()AImplementing CoDBUsing Express Configurations with processor upgradesCMeeting the minimum Value Pak rulesDEngaging the pSeries representative to identify appropriate discounts
单选题A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()AThe technical support specialist has completed a UNIX course at college.BThe technical specialist has supported several similar projects and has earned an IBM AIX certification.CThe technical support specialist’s company sells $3M of UNIX computer systems every year.DThe technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
单选题Acustomer has requested an IBM System Storage DS8300 system for a new Exchange 2003 email solution to meet the following requirements: - 20% yearly growth - 25,000 mail boxes - approximately 50/50 mix of read/write operations The storage specialist has used Capacity Magic to calculate a base configuration of 46.7 TB raw capacity, 64 GB cache, and 24 ports for the DS8300. The storage specialist has been asked to model this configuration using the expected workload to verify that it is a viable solution. What is needed to start modeling()A73GB 15k rpm drivesBthe amount of IOPS per mail boxCthe number of servers running ExchangeDthe Jetstress tool to emulate the Exchange environment
单选题A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the power cord plug to show to their electrician. Where would the pSeries technical specialist find the required information?()ASales ManualBAnnouncement LetterCPOWER4+ p650 Specification SheetDSite and Hardware Planning Information Manual
单选题A company has a small network,consisting of a single switch and a single router.The switch has been configured with two vlans,and route-on-a-stick is being configured on the router for inter-vlan routing.A trunk is configured to connect the switch to the router.What is the minimum number of router subinterfaces that are required for all the vlans to communicate?()AoneBthreeCtwoDzero
单选题The pSeries technical specialist of a Premier Tier 1 Business Partner has been working on a design for a four LPAR p5-570 Express solution. The specialist has received conflicting information regarding sharing the IDE DVD-RAM drive between different LPARs. Who should the technical specialist contact to gain a definitive answer?()AIBM BPSOBIBM PartnerlineCIBM DistributorDIBM Supportline
单选题ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web server to support the release of a product. The systems architect has recommended that the Web server will require a whole CPU. Which of the following should the technical specialist suggest to provide the most cost-effective deployment?()ARemove one application server partition and apply its CPU resources to the Web server.BReassign the CPU from one of the VIO servers and create the new partition.CAdd 0.6 CPU to one of the application servers and run the Web service with the application. DReassign a total of 0.4 CPUs from the application servers and create a new partition with awhole CPU for new deployment.
单选题A solution provider has proposed a pSeries solution to a new customer. The solution is complex with a number of technologies that are new to the customer. They have a tight timeline for implementation. The solution provider has not been able to get a clear understanding as to how the customer will backup the system. What would be the most appropriate action to address the risks with this solution?()ASell SysbackBConduct a SARCSell SupportlineDProvide a project timeline
单选题A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback. There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future. The customer has asked the pSeries technical specialist to recommend anything else that may be needed. Which of the following should be recommended in this situation?()AHMCBDVD-ROMCTape driveDNetwork switch