单选题While executing a Cluster Test Plan, the administrators realize that they will need to email the Operations and network on-call staff in the event of a network outage. What can be done to alert the on-call staff of network failures?()A Customize clstat to send a mail message.B Customize an Event Notification method.C Customize an Error Notification method.D Customize clinfo to send an SNMP trap.
单选题
While executing a Cluster Test Plan, the administrators realize that they will need to email the Operations and network on-call staff in the event of a network outage. What can be done to alert the on-call staff of network failures?()
A
Customize clstat to send a mail message.
B
Customize an Event Notification method.
C
Customize an Error Notification method.
D
Customize clinfo to send an SNMP trap.
参考解析
解析:
暂无解析
相关考题:
Which of the following would require real-time processing?( )A.Playing a computer gameB.Executing a program that predicts the state of economyC.Printing labelsD.Listening the music
While deploying a new application module, the software vendor ships the application software along with appropriate SQL plan baselines for the new SQLs being introduced. Which two statements describe the consequences?()A、The plan baselines can be evolved over time to produce better performance.B、The newly generated plans are directly placed into the SQL plan baseline without being verified.C、The new SQL statements initially run with the plans that are known to produce good performance under standard test configuration.D、The optimizer does not generate new plans for the SQL statements for which the SQL plan baseline has been imported.
Which service component in the design phase describes developing a detailed, site-specific plan for implementing the new technology system or solution()A、Implementation Plan DevelopmentB、Detailed Design DevelopmentC、Systems Acceptance Test Plan DevelopmentD、Staging Plan Development
What is the correct command to stop the currently executing job "test" in JOBS job stream on a local machine?()A、 conman "k test"B、 conman "cj test"C、 conman "k jobs.test"D、 conman "cj jobs.test"
A step in the HACMP test plan is to gracefully stop the cluster on a node and to verify that the Shared resources fallover to the standby node. To prepare for this testing step, both nodes in the two-node cluster are in a stable state with the single resource group active on Node ’A’. Which of the following is the best way to execute this portion of the test plan?() A、 Execute "lssrc -g cluster stop" on Node ’A’B、 Execute "cat /etc//motd /dev/kmem" on Node ’A’C、 Execute "/usr/es/sbin/cluster/utilities/sclstop -gr" on Node ’A’D、 Find the pid of cluster manager daemon on Node ’A’ and issue a "kill-9" against the pid
While executing a Cluster Test Plan, the administrators realize that they will need to email the Operations and network on-call staff in the event of a network outage. What can be done to alert the on-call staff of network failures?() A、 Customize clstat to send a mail message.B、 Customize an Event Notification method.C、 Customize an Error Notification method.D、 Customize clinfo to send an SNMP trap.
The first step documented in Company.com’s HACMP test plan is to start the cluster manager on the normal service node and verify that HACMP daemons have started with the ’lssrc -g cluster" command. What daemons MUST show as active in the ’lssrc -g cluster" command to have an operational cluster?() A、 clstrmgrES,clsmuxpdESB、 topsvcsd,grpsvcsd,exaixosC、 topsvcsd,grpsvcsd,clinfoES,grglsmdD、 clstrmgrES,clsmuxpdES,topsvcsd,grpsvcsd
A system administrator wants to ensure that the cluster will failover if quorum is lost for appAvg in RG1 whichis mirrored between hdisk3 and hdisk5. Automatic error notification has been configured in this cluster. Which of the following actions should be usedto test that the cluster fails over correctly when quorum is lost for appAvg?()A、Emulate the errpt entry from the HACMP Error Notification menuB、Execute a custom test procedure from the HACMP Cluster Test Tool menuC、Emulate the LVM_SA_QUORCLOSE event from the HACMP Event Emulation menuD、Execute the automated test procedure from the HACMP Cluster Test Tool menu
A customer needs to test the failover capabilities of their cluster. Which of the following AIX commands, whenissued from the command line, will simulate a node crash and cause the cluster resource group running onthat server to fail over to another node?()A、clstopB、halt -qC、shutdown -FD、stopsrc -s cluster
The Database Resource Manager is not currently active in your database that is up and running. You created a resource plan named DAY_PLAN that contains two sub-plans named MANAGERS_PLAN and CLERKS_PLAN. You decided to activate DAY_PLAN by executing the following statement: SQLALTER SYSTEM SET RESOURCE_MANAGER_PLAN = ’managers_plan’; What will be the outcome of this statement?() A、 The statement will deactivate DAY_PLAN.B、 The statement will activate DAY_PLAN as the top plan.C、 The statement will activate MANAGERS_PLAN as the top plan.D、 The statement will return an error because MANAGERS_PLAN is not the top plan.
You are creating a cluster. The tables in the cluster have a relatively uniform distribution of values in the index column and the queries against the clustered table will almost use an equality operator to retrieve the desired row. Which type of cluster will you create?()A、 Index clusterB、 Hash clusterC、 Sorted Hash clusterD、 Real Application Cluster
Your environment includes a Windows Server 2008 R2 Hyper-V failover cluster. You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You plan to perform maintenance on the Hyper-V failover cluster. You need to complete the maintenance on the failover cluster while maximizing the uptime of the virtual machines (VMs). What should you do prior to starting maintenance on each cluster node?()A、Use Failover Cluster Manager to pause the cluster nodeB、Use Failover Cluster Manager to perform a quick migration of all VMs to another cluster nodeC、Use VMM to place the cluster node in maintenance modeD、Use VMM to pause all VMs and move them to another cluster node
Your network contains two servers that run the Server Core installation of Windows Server 2008 R2. The two servers are part of a Network Load Balancing cluster. The cluster hosts a Web site. Administrators use client computers that run Windows 7. You need to recommend a strategy that allows the administrators to remotely manage the Network Load Balancing cluster. Your strategy must support automation. What should you recommend?()A、On the servers, enable Windows Remote Management (WinRM).B、On the servers, add the administrators to the Remote Desktop Users group.C、On the Windows 7 client computers,enable Windows Remote Management (WinRM).D、On the Windows 7 client computers,add the administrators to the Remote Desktop Users group.
Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?() A、 Change the cluster to a rotating design.B、 Change the Cascading without Fallback flag to true.C、 Change the Inactive Takeover field to false in the cluster configuration.D、 Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
单选题The Database Resource Manager is not currently active in your database that is up and running. You created a resource plan named DAY_PLAN that contains two sub-plans named MANAGERS_PLAN and CLERKS_PLAN. You decided to activate DAY_PLAN by executing the following statement: SQLALTER SYSTEM SET RESOURCE_MANAGER_PLAN = ’managers_plan’; What will be the outcome of this statement?()A The statement will deactivate DAY_PLAN.B The statement will activate DAY_PLAN as the top plan.C The statement will activate MANAGERS_PLAN as the top plan.D The statement will return an error because MANAGERS_PLAN is not the top plan.
单选题Your company has a main office and a branch office. The offices connect by using WAN links. The network consists of a single Active Directory domain. An Active Directory site exists for each office. Servers in both offices run Windows Server 2008 R2 Enterprise. You plan to deploy a failover cluster solution to service users in both offices. You need to plan a failover cluster to meet the following requirements: èMaintain the availability of services if a single server fails èMinimize the number of servers required What should you include in your plan?()ADeploy a failover cluster that contains one node in each office.BDeploy a failover cluster that contains two nodes in each office.CIn the main office, deploy a failover cluster that contains one node. In the branch office, deploy a failover cluster that contains one node.DIn the main office, deploy a failover cluster that contains two nodes. In the branch office, deploy a failover cluster that contains two nodes.
单选题In which phase is a systems acceptance test plan developed and documented?()AImplementBDesignCPrepareDOperate
单选题What is the correct command to stop the currently executing job "test" in JOBS job stream on a local machine?()A conman k testB conman cj testC conman k jobs.testD conman cj jobs.test
单选题Your network includes 40 servers that run Windows Server 2008 R2. You plan to virtualize the servers by using Hyper-V in a failover cluster. Your plan must allow for up to two offline host servers while still maintaining highly available virtual machines. You need to recommend the minimum number of Hyper-V host servers for the cluster. How many servers should you recommend?()AFiveBThreeCFourDSix
多选题While deploying a new application module, the software vendor ships the application software along with appropriate SQL plan baselines for the new SQLs being introduced. Which two statements describe the consequences?()AThe plan baselines can be evolved over time to produce better performance.BThe newly generated plans are directly placed into the SQL plan baseline without being verified.CThe new SQL statements initially run with the plans that are known to produce good performance under standard test configuration.DThe optimizer does not generate new plans for the SQL statements for which the SQL plan baseline has been imported.
单选题The first step documented in Company.com’s HACMP test plan is to start the cluster manager on the normal service node and verify that HACMP daemons have started with the ’lssrc -g cluster" command. What daemons MUST show as active in the ’lssrc -g cluster" command to have an operational cluster?()A clstrmgrES,clsmuxpdESB topsvcsd,grpsvcsd,exaixosC topsvcsd,grpsvcsd,clinfoES,grglsmdD clstrmgrES,clsmuxpdES,topsvcsd,grpsvcsd
单选题Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?()A Change the cluster to a rotating design.B Change the Cascading without Fallback flag to true.C Change the Inactive Takeover field to false in the cluster configuration.D Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
单选题Which statement best describes clustering in a small-business wireless network?()A allows multiple access points to be connected wirelessly, without the need for a wired Ethernet networkB replicates configuration parameters across access points in the cluster, while optimizing network performanceC automatically configures wireless client devices via Wi-Fi Protected SetupD can get real-time traffic or bandwidth statistics from an access point within a cluster
单选题You are creating a cluster. The tables in the cluster have a relatively uniform distribution of values in the index column and the queries against the clustered table will almost use an equality operator to retrieve the desired row. Which type of cluster will you create?()A Index clusterB Hash clusterC Sorted Hash clusterD Real Application Cluster