单选题Which sequence is correct when launching a lifeboat stowed in gravity davits?()ARelease gripes,turn on emergency disconnect switch,release frapping linesBRelease tricing pennants,turn on emergency disconnect switch,release frapping linesCOperate limit switches,release gripes,lift brakeDRelease gripes,lift brake,release tricing pennants

单选题
Which sequence is correct when launching a lifeboat stowed in gravity davits?()
A

Release gripes,turn on emergency disconnect switch,release frapping lines

B

Release tricing pennants,turn on emergency disconnect switch,release frapping lines

C

Operate limit switches,release gripes,lift brake

D

Release gripes,lift brake,release tricing pennants


参考解析

解析: 暂无解析

相关考题:

Which of the following is a characteristic of a sequence?() A.A sequence will never generate duplicate valuesB.The MAXVALUE of a sequence can be equal to the MINVALUEC.It is not possible to create a sequence that generates a constant since the INCREMENT value must be greater than zeroD.When a sequence cycles back to either the MAXVALUE or MINVALUE, it will always be equal to the specified value of either of these two boundaries

Which is the correct fallback sequence for loading the Cisco IOS?() A. ROM, Flash, NVRAMB. ROM, TFTP server, FlashC. Flash, TFTP server, ROMD. Flash, NVRAM, RAM

Frapping lines ______.A.secure the lifeboat in the davits when in the stowed positionB.bring the lifeboat close alongside the rail in the embarkation positionC.give the occupants a safety line when the boat is being lowered from the embarkation levelD.reduce the swinging of the lifeboat at the embarkation level

Coast Guard approved buoyant work vests ______.A.may be substituted for 10 percent of the required life preserversB.should be stowed adjacent to lifeboats and emergency stationsC.may be used by boat crews and line handlers during lifeboat drillsD.should be used when carrying out duties near a weather deck's edge

The launching ramp for the lifeboat is ______.A.the rollerB.the skidC.the slideD.the davit

Frapping lines are fitted to lifeboat davits to ______.A.secure the lifeboat in the davits when in the stowed positionB.bring the life boat close along the rail in the embarkation positionC.give the occupants a safety line when the boat is being lowered from the embarkation levelD.reduce the swinging of the lifeboat at the embarkation level

In launching a lifeboat, when should the tricing pendants be released?______.A.Before the boat is lowered from the stowage positionB.As soon as the boat-fall blocks clear the davit headC.After the limit switch is activatedD.After all people have been embarked

Which of the following is a characteristic of a sequence?()A、A sequence will never generate duplicate valuesB、The MAXVALUE of a sequence can be equal to the MINVALUEC、It is not possible to create a sequence that generates a constant since the INCREMENT value must be greater than zeroD、When a sequence cycles back to either the MAXVALUE or MINVALUE, it will always be equal to the specified value of either of these two boundaries

救生艇下水每隔三个月进行一次。()A、Lifeboat launching is operated at intervals of three months.B、Lifeboat launching is operated at intervals for three months.C、Fire drill is carried out once a month.D、Don’t operate two or more hatch covers at the same time.

Which is the correct fallback sequence for loading the Cisco IOS?()A、ROM, Flash, NVRAMB、ROM, TFTP server, FlashC、Flash, TFTP server, ROMD、Flash, NVRAM, RAM

多选题When performing incomplete recovery using UNTIL SEQUENCE with RMAN, which two pieces of information are required?()AThread number.BLog Sequence number.CControl file sequence number.DName of the last archived log.

单选题In launching a lifeboat,when should the tricing pendants be released?().ABefore the boat is lowered from the stowage positionBAs soon as the boat-fall blocks clear the davit headCAfter the limit switch is activatedDAfter all people have been embarked

单选题Lifeboat launching is operated at intervals of ()months.AoneBtwoCthreeDfour

单选题In launching a covered lifeboat,what would safely lower the lifeboat from inside the lifeboat cabin?()AFrapping lineBTricing lineCRottmer releaseDWinch remote control wire

单选题When launching a lifeboat,the tricing pennants should be released().Abefore the boat is lowered from the stowed positionBas the boat-fall blocks break clear of the davit headCbefore the boat is lowered from the embarkation levelDafter the boat is released into the water

单选题Lifeboat launching is operated ().AquarterlyBannuallyCmonthlyDyearly

单选题Which of the following items isn’t belonging to Docking survey?()AExamination of the shell including bottom, side and bow platingBExamination of sea suctions, overboard discharging valves and sea chestsCLoad testing of lifeboat launching devicesDPoker gauge of propeller shaft taken

单选题Frapping lines are fitted to lifeboat davits to().Asecure the lifeboat in the davits when in the stowed positionBbring the lifeboat close along the rail in the embarkation positionCgive the occupants a safety line when the boat is being lowered from the embarkation levelDreduce the swinging of the lifeboat at the embarkation level

单选题Frapping lines().Asecure the lifeboat in the davits when in the stowed positionBbring the lifeboat close alongside the rail in the embarkation positionCgive the occupants a safety line when the boat is being lowered from the embarkation levelDreduce the swinging of the lifeboat at the embarkation level

单选题Frapping lines are fitted to lifeboat davits to().Areduce the swinging of the lifeboat as it is being lowered from the embarkation levelBsecure the lifeboat in the davits when in the stowed positionChold the lifeboat to the ship's side until the tricing lines are passedDbe used as a safety line in an emergency

单选题When launching an open lifeboat by falls,the boathooks should be().Asecured forward and aft where readily availableBsecured amidships where they will not hinder the personnelCused for fending offDused for picking up survivors in the water

单选题I think they are() Which of the following is not correct?ABritonBBritishCEnglishDEnglishmen

单选题Limit switches().Acontrol the descent rate of a lifeboatBcontrol the ascent rate of a lifeboatCcut off power to the winch when the lifeboat nears the final stowed positionDcut off power to the winch when the lifeboat reaches the davit bumpers

单选题When launching a lifeboat in the rough sea, the davit gears should be released().Abefore the boat is lowered from the stowed positionBas the boat fall blocks break clear of the davit headCbefore the boat is lowered from the embarkation levelDafter the boat is released into the water

单选题Coast Guard approved buoyant work vests().Amay be substituted for 10 percent of the required life preserversBshould be stowed adjacent to lifeboats and emergency stationsCmay be used by boat crews and line handlers during lifeboat drillsDshould be used when carrying out duties near a weather deck's edge

单选题When abandoning ship,after launching the motor lifeboat you should().Aplot a course for the nearest landBtake a vote on which direction you should goCstay in the immediate areaDgo in one direction until fuel runs out

单选题What is required by regulations concerning the stowage of lifeboats on cargo vessels?()AEach lifeboat must have a launching applianceBLaunching appliances must be of the gravity typeCThere may not be more than two launching appliances on the same deckDAll of the above