单选题The line connecting the Loran-C master station with a secondary station is called the().AFocus lineBBase lineCSide lineDCenter line

单选题
The line connecting the Loran-C master station with a secondary station is called the().
A

Focus line

B

Base line

C

Side line

D

Center line


参考解析

解析: 暂无解析

相关考题:

驱动器的英文全称是() A.Secondary Master DriveB.Second Master DriveC.Secondary DriveD.Master Drive

It is the responsibility of the Master or person in charge of a ship to ensure that ______.A.the station bill is posted in each compartmentB.temporary personnel and visitors are advised of emergency stationsC.names of crew members are listed on the station billD.no changes are made to the station bill

Most modern Loran-C receivers,when not tracking properly,have a(n)______.A.Bell alarm to warn the userB.Lighted alarm signal to warn the userC.Alternate signal keying systemD.View finder for each station

The line connecting the Loran-C master station with a secondary station is called the ______.A.Focus lineB.Base lineC.Side lineD.Center line

The use of pulse groups and extremely precise timing at each Loran-C station makes possible the use of ______.A.High frequency pulsesB.Combinations of high and low frequency pulsesC.The same frequency for all stations in a chainD.Varied long and short pulses

A line connecting all possible positions of your vessel at any given time is a ______.A.longitude lineB.latitude lineC.line of positionD.Fix

An isotherm is ______.A.a line on a weather map connecting equal points of both temperature and pressureB.an instrument that measures the climatological effects of temperatureC.a line connecting points of equal barometric pressure on a weather mapD.a line connecting points of equal temperature on a weather map

In multipoint networks , there are tree persistence methods when a station finds a channel busy.in the 1-persistent method,after the station finds the line idle,it sends its frame immediately.this method has the ( ) chance of collision because two or more stations may find the line (请作答此空) and send their frames immediately. In the nonpersistent method , a station that has a frame to send ( ) the line . If the line is idle , it sends immediately If the line is not idle , it waits a ( ) amount of time and then senses the line again.The nonpersistent approach ( ) the chance of collision because it is unlikely that two or more stations will wait the same amount of time and retry to send simultaneously The p-persistent approach combines the advantages of the other two strategies . It reduces the chance of collision and improves efficiency.A.idleB.busyC.usefulD.unusable

驱动器的英文全称是()A、Secondary Master DriveB、Second Master DriveC、Secondary DriveD、Master Drive

二环系(second cycle line)

联络线 connecting line

A user requires more storage space on their computer. After a technician installs a second IDE drive in the computer, the system will not recognize that there are any hard drives installed. Which of the following is the MOST likely cause of the problem?()A、The second hard drive has not been formatted for NTFS.B、The jumpers on both drives are set to the cable select position.C、The jumper on the first drive is set to master and the second is set to slave.D、The jumpers on both drives are set to the master position.

An administrator needs to configure a server (192.168.22.22) as a temporary solution for an NTP master that has stopped working. What is the process for configuring the NTP master?()A、Edit the /etc/ntp.conf file changing the server line to 'server 127.127.1.0' and add the line 'fudge 127.127.1.0 stratum 0', and then refresh the daemon.B、Edit the /etc/ntp.conf file changing the server line to 'server 127.127.1.0' and add the line 'master 127.127.1.0 stratum 0', and then refresh the daemon.C、Edit the /etc/ntp.conf file changing the server line to 'server 192.168.22.22' and add the line 'fudge 192.168.22.22 stratum 0', and then refresh the daemon.D、Edit the /etc/ntp.conf file changing the server line to 'server 192.168.22.22' and addthe line 'master 192.168.22.22 stratum 0', and then refresh the daemon.

单选题Functions aboard a tanker or tank barge such as connecting,disconnecting,and topping off must be supervised by().Aany certificated tankermanBthe Master of the vesselCthe officer of the watchDthe person designated as person in charge

名词解释题二环系(second cycle line)

单选题When connecting the tow bridle to a tug, the end of the bridle is passed with a().Aheaving lineBshot lineChigh lineDmessenger line

单选题A line of position is().Aa line connecting two charted objectsBa line on some point of which the vessel may be presumed to be locatedCthe position of your vesselDnot used in a running fix

单选题Which is the summer load waterline on the load waterline mark?().AThe first line at the bottomBThe second line from the bottomCThe third line from the bottomDThe fourth line from the bottom

单选题A user requires more storage space on their computer. After a technician installs a second IDE drive in the computer, the system will not recognize that there are any hard drives installed. Which of the following is the MOST likely cause of the problem?()AThe second hard drive has not been formatted for NTFS.BThe jumpers on both drives are set to the cable select position.CThe jumper on the first drive is set to master and the second is set to slave.DThe jumpers on both drives are set to the master position.

名词解释题联络线 connecting line

单选题A line connecting all possible positions of your vessel at any given time is a().Alongitude lineBlatitude lineCline of positionDfix

单选题A line on a weather chart connecting places which have the same barometric pressure is called an().AisothermBisallobarCisobarDisotope

单选题Which statement is TRUE about placing the eyes of two mooring lines on the same bollard?()APut one line at the low point and one at the high point of the bollard so they don't touchBTake the eye of the second line up through the eye of the first line before putting the second line on the bollardCNever put two mooring lines on the same bollardDThe mooring line forward should be put on the bollard first

单选题All Loran-C transmitting stations are equipped with cesium frequency standards which permit ().Aevery station in one chain to transmit at the same timeBeach station to transmit without reference to another stationCon-line transmission of single-line transmitters at the same timeDeach station to only depend on the master for synchronization and signal ratio

单选题The line connecting the Loran-C master station with a secondary station is called the().AFocus lineBBase lineCSide lineDCenter line

单选题Most modern Loran-C receivers,when not tracking properly,have a(n)().ABell alarm to warn the userBLighted alarm signal to warn the userCAlternate signal keying systemDView finder for each station

单选题It is the responsibility of the Master or person in charge of a ship to ensure that().Athe Muster List (Station Bill) is posted in each compartmentBtemporary personnel and visitors are advised of emergency stationsCnames of crew members are listed on the Muster List (Station Bill)Dno changes are made to the Muster List (Station Bill)

单选题It is the responsibility of the Master or person in charge of a ship to ensure that().Athe station bill is posted in each compartmentBtemporary personnel and visitors are advised of emergency stationsCnames of crew members are listed on the station billDno changes are made to the station bill