判断题烹调蔬菜的正确方法是:先洗后切、急火快炒、开汤下菜、炒好即食。A对B错
判断题
烹调蔬菜的正确方法是:先洗后切、急火快炒、开汤下菜、炒好即食。
A
对
B
错
参考解析
解析:
暂无解析
相关考题:
多选题Which three statements are correct about RIP version 2 (Choose three.)()。AIt has the same maximum hop count as version 1BIt uses broadcasts for its routing updatesCIt is a classless routing protocolDIt has a lower default administrative distance than RIP version 1EIt supports authenticationFIt does not send the subnet mask in updates
多选题The network security policy requires that only one host be permitted to attach dynamically to each switch interface. If that policy is violated, the interface should shut down. Which two commands must the network administrator configure on the 2950 Catalyst switch to meet this policy?()ASwitch1(config-if)# switchport port-security maximum 1BSwitch1(config)# mac-address-table secureCSwitch1(config)# access-list 10 permit ip hostDSwitch1(config-if)# switchport p ort-security violation shutdownESwitch1(config-if)# ip access-group 10
单选题承包人与材料供应商合同约定买卖钢材500t,由于施工内容的调整变化,发包人通知承包人可能要改变交货数量,但一直没有明确具体交货数额。交货期到达,供应商将500吨钢筋交付承包人,承包人拒绝接受,理由是合同已协议变更,则正确的说法是()。A供应商应承担由此给承包人造成的损失B承包人可根据实际情况部分接受货物C由于双方已变更合同,供应商应暂停送货D如承包人拒绝接受钢材,应承担违约责任
单选题【背景资料】某写字楼工程,地下1层,地上15层,框架一剪力墙结构。已进入装饰装修阶段,施工过程中施工单位对抹灰工程基层处理的施工过程部分记录如下:在抹灰前对基层表面做了清除,室内墙面、柱面和门窗洞口的阳角做法符合设计要求。工程师对抹灰工程施工质量控制的要点确定如下: (1)抹灰用的石灰膏的熟化期不应小于3天。 (2)当抹灰总厚度大于或等于15mm时,应采取加强措施。 (3)有排水要求的部位应做滴水线(槽)。 (4)一般抹灰的水泥砂浆不得抹在石灰砂浆层上。 (5)一般抹灰和装饰抹灰工程的表面质量应符合有关规定。 请根据上述背景资料完成以下的选项。做灰饼工序要求为采用1:3水泥砂浆或1:3:9水泥石灰砂浆做规格为()的灰饼。A50mm*50mmB40mm*40mmC30mm*30mmD60mm*60mm
多选题某企业销售一批商品,为扩大销售采用45天信用销售,考虑到货款尽早收回,决定给予客户现金折扣,条件为“3/10,n/45”。该信用条件表述的含义是()。A45日为信用期限B10日为信用期限C10日为折扣期限D45日为折扣期限E3%为现金折扣
多选题华为BSC6680中,关于容量指标说法正确的为()。A1X(不含声码器)指标1X话务量(ERL)50000,用户数2000000B1X(含声码器)指标1X话务量最大为(ERL)30000,用户数1200000CDO组网容量指标为DO吞吐量4G,用户数2000000D最大扇区载频数为6000、BTS数数为2500
判断题备份云硬盘需要的时间只取决于云硬盘中的数据量。A对B错