The safe working load of the derrick is ().A、5 tonsB、5 metresC、5 feetD、5 mile

The safe working load of the derrick is ().

  • A、5 tons
  • B、5 metres
  • C、5 feet
  • D、5 mile

相关考题:

What ________ the safe working load of the derrick?A.isB.beC.areD.has

RRU电源线从DCDU-03B上引电,1-3小区的宏站RRU按照()次序进行连接。 A.Load0~2B.Load2~0C.Load3~5D.Load5~3

L A.5 n mileB 3 n mileC 2 n mileD.1 n mile

L A.5 n mileB 3 n mileC 2 n mileD 1 n mile

20mL A.5 n mileB 3 n mileC 2 n mileD 1 n mile

12m≤L A.5 mileB 3 n milC 2 n mileD.I n mile

Cargo booms must be weight tested to recertify the Safe Working Load(SWL)every ______.A.YearB.Two yearsC.Four yearsD.Five years

The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the ______.A.deckB.head of the boomC.heel of the boomD.mast or king post

When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength

In relation to cargo gear, what does SWL mean ?______.A.Safe working loadB.Ship’s working liftC.Starboard wing liftD.Stress, weight, load

The safe working load of the derrick is 5 tons.()A、吊杆的安全工作负荷量是5吨B、龙门吊的安全工作负荷量是5吨C、起货机的安全工作负荷量是5吨D、重吊杆的安全工作负荷量是5吨

以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4) No.1 hold bilge, lay wood block; 5) No.1 hold bilge ,lay wood block on tungsten iron and pave canvas on wood block; 6)No.4 hold tweendeck,using rope net separate commodity from stationary.A、1)严格按配载计划要求执行;2)申请理货;B、3)吊杆安全负荷量3t;4)No.1舱底舱铺木板;C、5)No.2舱底舱钨铁上铺木板,上面再铺帆布;6)No.4舱二层舱日用品和文具间用绳网隔票。D、以上都对

英文备注“the derrick safe working load 3t”的中文意思是:()A、吊杆的重量为3tB、吊杆吊起的重量是3tC、吊杆工作时不能吊起3t的货物D、吊杆安全负荷量3t

The safe working load of the ()is 100 tons.A、single derrickB、derrickC、heavy derrickD、deck

The safe working load of the derrick is ().A、5 tonsB、5 metresC、5 feetD、5 years

The ()of the derrick is 5 tons.A、GTB、SWLC、DWTD、TDW

Sailors should know the ()(安全工作负荷量)of derricks.A、safe working loadB、safety work loadC、safe work loadD、safe working loading

“SWL” means ().A、safe working loadB、safe work loadC、safe worked loadD、safely working load

在天气描述图里,MVFR表示能见度为().A、小于3mileB、3~5mileC、大于5mile

单选题The safe working load of the derrick is ().A5 tonsB5 metresC5 feetD5 mile

单选题In determining a safe speed()shall not be among those taken into account.Athe characteristics,efficiency and limitation of the radar equipmentBany constraints imposed by the radar range scale in useCthe effect on radar detection of the sea state,weather and other sources of interferenceDthe safe working load of the cranes both on board and ashore

单选题The safe working load of the derrick is ().A5 tonsB5 metresC5 feetD5 years

单选题At what depth did Mr. Hyatt use the camera?A5 feetB10 feetC15 feetD20 feet

单选题The safe working load of the derrick is 5 tons.()A吊杆的安全工作负荷量是5吨B龙门吊的安全工作负荷量是5吨C起货机的安全工作负荷量是5吨D重吊杆的安全工作负荷量是5吨

单选题Cargo booms must be weight tested to recertify the Safe Working Load (SWL) every().AyearBtwo yearsCfour yearsDfive years

单选题Blocks and falls used as lifeboat gear must be designed with a minimum safety factor of().A4,based on the breaking strengthB5,based on the maximum allowable stressC6,based on the maximum working loadD8,based on the normal working load

单选题When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().Awinch speedBboom strengthCload radiusDcable strength