单选题Catenary as applied to tow lines denotes the().Adip of the lineBstretch of the lineCstrain on the lineDlength of the line

单选题
Catenary as applied to tow lines denotes the().
A

dip of the line

B

stretch of the line

C

strain on the line

D

length of the line


参考解析

解析: 暂无解析

相关考题:

ADM is an activity-on-arrow method. In this method, a dummy activity:A.Denotes a critical path relationship.B.Denotes any dependency relationship.C.Shows slack.D.Identifies customer deliverables dates.E.Identifies customer team meeting dates.

● ADM is an activity-on-arrow method. In this method, a dummy activity:A Denotes a critical path relationship.B Denotes any dependency relationship.C Shows slack.D Identifies customer deliverables dates.E Identifies customer team meeting dates.

The word “talking” (Line 6, paragraph 3) denotes ________.[A] modesty[B] personality[C] liveliness[D] informality

An administrator notices that some of their systems are reporting a number in the eferred Level?column on the HMC pdates?panel. WhatAn administrator notices that some of their systems are reporting a number in the ?eferred Level?column on the HMC ?pdates?panel.What is the meaning of the eferred Level?is the meaning of the ?eferred Level?()A.The number denotes the firmware level which will be activated when AIX is next rebooted.B.The number denotes the firmware level which will be activated when all LPARs are next started.C.The number denotes the firmware level which will be activated when the managed system is next restarted.D.The number denotes how many days have elapsed since the firmware was installed without the LPARs being reactivated.

You are pushing a tow ahead,at high speed,near the right hand bank of a canal.The forces affecting your towboat and tow will tend to ______.A.Push both the head of the tow and the stern of the towboat away from the right hand bankB.Push the head of the tow away from,and pull the stern of the towboat into,the right hand bankC.Pull both the head of the tow and the stern of the towboat into the right hand bankD.Pull the head of the tow into,and push the stern of the towboat away from,the right hand bank

A “loose” tow may cause all of the following EXCEPT ______.A.loss of maneuverabilityB.lines to partC.damage to the towing vessel and towD.a saving in the transit time

With a large tow astern,there is immediate danger to the tug in the event of the ______.A.Tug losing powerB.Tow line partingC.Bridle twistingD.Tow broaching

A tow astern is veering from side to side on its towline.The best way of controlling the action is to ______.A.Trim the tow by the bowB.Trim the tow by the sternC.List the tow to windwardD.Adjust the length of the towing bridle

A chain bridle is used when towing astern because it ______.A.is easy to connectB.provides an effective catenary and absorbs shock due to its weightC.makes rigging a swivel unnecessaryD.prevents the tow from yawing by the drag of the chains in a seaway

Which of the following denotes the FINAL point of responsibility for a service provider?()A、66 blockB、Patch panelC、Wiring closetD、Demarc

Which statement best describes configuring access control lists to control Telnet traffic destined to therouter itself?()A、The ACL applied to the vty lines has no in or out option like ACL being applied to an interface.B、The ACL is applied to the Telnet port with the ip access-group command.C、The ACL must be applied to each vty line individually.D、The ACL should be applied to all vty lines in the in direction to prevent an unwanted user from connecting to an unsecured port.

An administrator notices that some of their systems are reporting a number in the eferred Level?column on the HMC pdates?panel. WhatAn administrator notices that some of their systems are reporting a number in the ?eferred Level?column on the HMC ?pdates?panel. What is the meaning of the eferred Level?is the meaning of the ?eferred Level?()A、The number denotes the firmware level which will be activated when AIX is next rebooted.B、The number denotes the firmware level which will be activated when all LPARs are next started.C、The number denotes the firmware level which will be activated when the managed system is next restarted.D、The number denotes how many days have elapsed since the firmware was installed without the LPARs being reactivated.

单选题The biggest problem you generally encounter while towing a single tow astern is().Athe catenary dragging on the bottomBswamping of the towCthe tow tending to diveDyaw

单选题What is the purpose of the intermediate spring?()AServes as a backup for the main tow hawser in case of failureBProvides weight and flexibility to the total tow makeupCLengthens the main tow hawser to keep the tow in stepDDistributes the towing load

单选题A chain bridle is used when towing astern because it().Ais easy to connectBprovides an effective catenary and absorbs shock due to its weightCmakes rigging a swivel unnecessaryDprevents the tow from yawing by the drag of the chains in a seaway

单选题Which statement best describes configuring access control lists to control Telnet traffic destined to therouter itself?()AThe ACL applied to the vty lines has no in or out option like ACL being applied to an interface.BThe ACL is applied to the Telnet port with the ip access-group command.CThe ACL must be applied to each vty line individually.DThe ACL should be applied to all vty lines in the in direction to prevent an unwanted user from connecting to an unsecured port.

单选题Which statement is TRUE concerning hawser towing? ()AThe catenary in a hawser should be sufficient so that the hawser just touches the bottomBThe hawser is of sufficient length for towing when taut between tug and towCIncreasing speed usually increases the catenary in the hawserDShortening the tow hawser generally decreases the maneuverability of the tug

单选题When towing astern,one way to reduce yawing of the tow is to().Atrim the tow by the sternBtrim the tow by the headChave the tow on an even keelDlist the tow on the side it is yawing

单选题In towing,heaving lines are used for().Apassing a tow bridle to the tugBpassing a messenger lineCheaving in the tow bridleDservice lines with rocket line throwers

单选题If the situation arose where it became necessary to tow a disabled vessel,which statement is TRUE concerning the towing line?().AThe towing line between the two vessels should be clear of the waterBThe towing line should be taut at all times between the vesselsCThere should be a catenary so the line dips into the waterDNone of the above

单选题A tow bridle is attached to the main tow hawser at the().Abight ringBtow hookCfishplateDswivel

单选题If a vessel under tow starts jumping on its tow line,the most appropriate action to alleviate the condition is to().Achange courseBslow downCheave toDadjust tow line length

单选题Which will NOT reduce yawing of a tow?()AIncreasing the length of the towing hawserBTrimming the tow by the bowCTrimming the tow by the sternDDrogues put over the stern

单选题In towing it is desirable for the tug and the vessel to ride wave crests simultaneously because().Ashock loading on the tow line is reduceBtowing speed is improvedCthe vessel is more visible from the tugDthe catenary of the tow line is reduced

单选题A tow astern is veering from side to side on its towline. The best way of controlling the action is to().Atrim the tow by the bowBtrim the tow by the sternClist the tow to windwardDadjust the length of the towing bridle

单选题Which of the following denotes the FINAL point of responsibility for a service provider?()A66 blockBPatch panelCWiring closetDDemarc

单选题Cable tension for catenary calculations is taken at the().Achain lockerBfairleadCanchorDcontact point of chain with seabed