单选题New AIX systems arrive without a CDROM drive. All systems do not have the system hardware configuration. Which of the following options is the most appropriate way to install AIX on the systems?()AInstall CDROM drives or tape drives on the systems because that is the only way to install AIX.BInstall one system. Take a mksysb from the first system and resotre the mksysb to the remaining systems.CInstall one system. Mirror rootvg onto a disk from each of the remaining systems.DSetup and NIM master and resources.

单选题
New AIX systems arrive without a CDROM drive. All systems do not have the system hardware configuration. Which of the following options is the most appropriate way to install AIX on the systems?()
A

Install CDROM drives or tape drives on the systems because that is the only way to install AIX.

B

Install one system. Take a mksysb from the first system and resotre the mksysb to the remaining systems.

C

Install one system. Mirror rootvg onto a disk from each of the remaining systems.

D

Setup and NIM master and resources.


参考解析

解析: 暂无解析

相关考题:

During an AIX installation, which of the following actions will occur once the Complete Overwrite option is selected?() A.All new disks in the system will be formattedB.Only the contents of the root volume group destination disks will be destroyedC.All file systems, including /(root), /tmp, /usr, and /var, but no usr data in the root volume group, will be destroyedD.The contents of all disks on the system, even if they are not shown as the destination root volume group disks, will be destroyed

The purpose of systems analysis phase is to build a logical model of the new system. The first step is( ), where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the( ). You use the fact-finding results to build business models, data and process models, and object models. The deliverable for the systems analysis phase is the( ), which describes management and user requirements, costs and benefits, and outlines alternative development strategies. The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase, you need to determine the( ), which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the( ), which is presented to management and users for review and approval.A.System logical modelingB.use case modelingC.requirements modelingD.application modeling A.systems planning phaseB.systems modeling phaseC.systems analysis phaseD.systems design phase A.system charterB.system scope definitionC.system blueprintD.system requirement document A.application architectureB.system data modelC.system process modelD.implement environment A.system architecture descriptionB.system design specificationC.system technique architectureD.physical deployment architecture

The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.A.system charterB.system scope definitionC.system blueprintD.system requirements document

The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.A.systems planning phaseB.systems modeling phaseC.systems analysis phaseD.systems design phase

The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.A.system architecture descriptionB.system design specificationC.system technique architectureD.physical deployment architecture

A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()A、Because additional systems would require more power receptaclesB、Because the customer may need to do additional facilities planningC、Because the customer needs additional funding to cover the servicesD、Because postponing the eventual discussion will likely lead to customer dissatisfaction

Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()A、APV, AIX5.2ML4B、AIX5.3 or i5/OSC、APV, i5/OS, AIX5.3D、APV, AIX5.3 or SuSE9

Where will an administrator find documents in PDFformat that include detailed architecture and step-by-step installation instructions for Power servers?()A、AIX Fix CentralB、IBM Developer WorksC、IBM Systems Software Information CenterD、IBM Systems Hardware Information Center

There are several technicians working on various systems on a new workbench. Which of thefollowing should be reviewed to ensure all proper procedures are followed to help reduce anypossible issues?()A、MSDSB、OEMC、ESDD、EMI

Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?() A、APV features are not supported for some legacy POWER4 adaptersB、APV will require the most current maintenance level for AIX 5.2C、APV features will require that legacy POWER4 adapters be updated with new microcodeD、The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3

A company runs very large database applications on multiple HP-UX servers. They recently upgraded the device drivers for their fibre channel HBAs and have suffered numerous crashes on several systems. Which feature of Power Systems running AIX would help eliminate this problem during pre-release testing of a new device driver?()A、Redundant VIO serversB、Storage Protection KeysC、Electronic Service AgentD、NPIV support in the kernel

A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()A、Linux will be restricted to the p650 system, as it is not supported on the p630.B、The customer can run Linux on all the existing systems with or without the presence of AIX.C、Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.D、Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.

New AIX systems arrive without a CDROM drive. All systems do not have the system hardware configuration. Which of the following options is the most appropriate way to install AIX on the systems?()A、Install CDROM drives or tape drives on the systems because that is the only way to install AIX.B、Install one system. Take a mksysb from the first system and resotre the mksysb to the remaining systems.C、Install one system. Mirror rootvg onto a disk from each of the remaining systems.D、Setup and NIM master and resources.

A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A、Purchase a second HMC and use this to manage the new servers.B、Connect all of the new servers to the existing private HMC network.C、Configure a second private network on their existing HMC for the new servers.D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

A system administrator is responsible for a vast and growing collection of dissimilar AIX systems. The verification of microcode levels and installation of new microcode is becoming increasingly unmanageable. What tool can be used to discover the existence of new microcode and automate the download and installation?()A、NIMB、HMCC、sumaD、invscout

A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing.  This system does not require an HMC.

Which of the following is a correct statement about rPerf?()A、It can only be used on systems running without partitions.B、It is relevant for IBM systems running the AIX operating system.C、It is the main benchmark for sizing systems that will run HPC applications.D、It has a direct relationship with other benchmarks like TPC-C and SpecjAppServer2004.

A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()A、A desk, as it not rack mountableB、Ethernet connections to the POWER5 systemsC、Serial connections to the POWER5 systemsD、USB connections for the keyboard and mouse

A manufacturing business is presently supporting multiple UNIX platforms and considering the advantages of consolidating environments, adding new applications and standardizing on HP-UX with IA-64. Which advantage should be communicated as the most compelling reason to consider pSeries as the platform of choice?()A、The pSeries family of servers offers many choices from small entry servers to data-center class systemsB、pSeries systems support both AIX and Linux operating systems providing a single platform for both environmentsC、AIX contains the tools and utilities necessary to convert all their UNIX software onto a single pSeries serverD、Thousands of AIX operating system-based applications, middleware, and tools are available today and already optimized

During an AIX installation, which of the following actions will occur once the Complete Overwrite option is selected?()A、All new disks in the system will be formattedB、Only the contents of the root volume group destination disks will be destroyedC、All file systems, including /(root), /tmp, /usr, and /var, but no usr data in the root volume group, will be destroyedD、The contents of all disks on the system, even if they are not shown as the destination root volume group disks, will be destroyed

An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access.   What preparation for moving the rack will result in the least disruption to end-users?()A、Initiate LPAR fallover to backup systems.B、Use Live Partition Mobility to move the LPARs to other systems.C、Use Live Application Mobility to move critical applications to alternate systems.D、Back up all LPARS to a NIM server and restore them to other LPARs on other systems.

单选题Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()AAPV, AIX5.2ML4BAIX5.3 or i5/OSCAPV, i5/OS, AIX5.3DAPV, AIX5.3 or SuSE9

单选题A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()AA desk, as it not rack mountableBEthernet connections to the POWER5 systemsCSerial connections to the POWER5 systemsDUSB connections for the keyboard and mouse

单选题Which of the following is a correct statement about rPerf?()AIt can only be used on systems running without partitions.BIt is relevant for IBM systems running the AIX operating system.CIt is the main benchmark for sizing systems that will run HPC applications.DIt has a direct relationship with other benchmarks like TPC-C and SpecjAppServer2004.

单选题During an AIX installation, which of the following actions will occur once the Complete Overwrite option is selected?()AAll new disks in the system will be formattedBOnly the contents of the root volume group destination disks will be destroyedCAll file systems, including /(root), /tmp, /usr, and /var, but no usr data in the root volume group, will be destroyedDThe contents of all disks on the system, even if they are not shown as the destination root volume group disks, will be destroyed

单选题A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()ALinux will be restricted to the p650 system, as it is not supported on the p630.BThe customer can run Linux on all the existing systems with or without the presence of AIX.CLinux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.DLinux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.

单选题Most Computer operating systems in use today, including all consumer-targeted systems, include a TCP/IP().AplanBrequirementCimplementationDdesign

单选题A manufacturing business is presently supporting multiple UNIX platforms and considering the advantages of consolidating environments, adding new applications and standardizing on HP-UX with IA-64. Which advantage should be communicated as the most compelling reason to consider pSeries as the platform of choice?()AThe pSeries family of servers offers many choices from small entry servers to data-center class systemsBpSeries systems support both AIX and Linux operating systems providing a single platform for both environmentsCAIX contains the tools and utilities necessary to convert all their UNIX software onto a single pSeries serverDThousands of AIX operating system-based applications, middleware, and tools are available today and already optimized