单选题The /etc/qconfig file needs to be modified on a busy AIX print server with 30 printers attached. What action should be performed before modifying this file()Alpstat; Record the currently running jobsBenq -DCenq -XDenq -h -p
单选题
The /etc/qconfig file needs to be modified on a busy AIX print server with 30 printers attached. What action should be performed before modifying this file()
A
lpstat; Record the currently running jobs
B
enq -D
C
enq -X
D
enq -h -p
参考解析
解析:
暂无解析
相关考题:
You are the network administrator for Ezonexam. You are planning to upgrade 35 Windows NT Server 4.0 computers to Windows 2000 Server. You want to accomplish the upgrades by using a distribution server. The Windows NT Server 4.0 computers support a tight production schedule that requires them to be online from 8:00 A.M. to midnight, seven days a week. You schedule the upgrade to run during non-business hours. Because of the limited amount of time the upgrades must be performed as quickly as possible.You want to complete the upgrades before production begins in the morning.What should you do?A.Perform. an unattended installation by running the winnt32 command and the /cmdcons switch.B.Perform. an unattended installation by running the winnt32 command and specify the use of a .txt file and a uniqueness database file.C.Perform. an unattended installation by running the winnt command and specify the use of a .txt file and a uniqueness database file.D.Perform. an unattended installation by using a Winnt.sif file with a commands section that initiates the Update.exe command in quiet mode.
The/etc/qconfigfileneedstobemodifiedonabusyAIXprintserverwith30printersattached.Whatactionshouldbeperformedbeforemodifyingthisfile() A.lpstat;RecordthecurrentlyrunningjobsB.enq-DC.enq-XD.enq-h-p
Which of the following will cancel only job 123 from printer lp01?() A. lpstat -d 123 lp01B. enq -d 123 -p lp01C. qcan -x 123 -P lp01D. lpcan -j 123 -p lp01
When planning to access the on-line documentation from a remote client, which of the following procedures should be performed on the server?()A、Install and configure the HTTPServer. B、Add the name(s) of the client(s) to the httplite.conf file. C、Add the names of any clients expecting to access the documentation to the /etc/hosts file. D、No action is required.
The /etc/qconfig file needs to be modified on a busy AIX print server with 30 printers attached. What action should be performed before modifying this file()A、lpstat; Record the currently running jobsB、enq -DC、enq -XD、enq -h -p
How should an administrator change the order in which host name lookup is performed so that it reads the host file before using DNS?() A、Edit the /etc/inetd.conf file so that it reads ’local, bind’.B、Edit the /etc/resolv.conf file so that it reads ’local, bind’.C、Edit the /etc/netsvc.conf file so that it reads ’local, bind’.D、Edit the /etc/nslookup.conf file so that it reads ’local, bind’.
A hospital customer with an experienced AIX and Microsoft Windows staff wants to consolidate all of their file/print services onto fewer systems. They currently use multiple Microsoft Windows-based Intelsystems that are experiencing reliability problems. They also have POWER4+ systems that are running multiple AIX LPARs that have experienced no reliability issues. They need at least 99.99% uptime. Which solution will meet their uptime needs at the lowest cost?()A、Combine the file/print servers onto a larger Intel-based machine (x445).B、Bring up a Linux LPAR on the pSeries and run Samba to provide file/print services.C、Bring up another AIX LPAR on the pSeries and run Samba to provide file/print services.D、Bring up another AIX LPAR on the pSeries and run Connect Direct to provide file/print services.
Because of changes in an application environment, the /etc/inittab file needs to be modified. Which of the following commands would be used to accomplish this in a supported manner()A、viB、chitabC、chssysD、chrsrc
During the process of fallover testing, a client/server database needs to be tested. On the AIX Server, start/stop/cleanup scripts and server application functionality have been tested. Before moving onto the next step of fallover testing,what action must be completed?()A、 Run who -a and validate that client connections are restored.B、 Verify that the client side application is functioning properly.C、 Check hacmp.out log file to validate that the application server started.D、 Verify that the application will successfully stop and restart on the fallover node.
A system at 192.100.45.17 is able to print to the printer. However, another system at 192.100.50.23 cannot print to the same printer. All of the following should be performed EXCEPT:()A、 Increase the size of /var. B、 Check /etc/qconfig file. C、 Check the default route. D、 Check for name resolution.
An administrator needs to configure a server (192.168.22.22) as a temporary solution for an NTP master that has stopped working. What is the process for configuring the NTP master?()A、Edit the /etc/ntp.conf file changing the server line to 'server 127.127.1.0' and add the line 'fudge 127.127.1.0 stratum 0', and then refresh the daemon.B、Edit the /etc/ntp.conf file changing the server line to 'server 127.127.1.0' and add the line 'master 127.127.1.0 stratum 0', and then refresh the daemon.C、Edit the /etc/ntp.conf file changing the server line to 'server 192.168.22.22' and add the line 'fudge 192.168.22.22 stratum 0', and then refresh the daemon.D、Edit the /etc/ntp.conf file changing the server line to 'server 192.168.22.22' and add the line 'master 192.168.22.22 stratum 0', and then refresh the daemon.
Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()A、Verify the ISV application runs on AIX 5.2B、Power4 to POWER5 upgrades are not supported without a application recompileC、Check the placement and size of the boot logical volume and disk space requirements on the S85D、AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
Which of the following will cancel only job 123 from printer lp01?()A、lpstat -d 123 lp01B、enq -d 123 -p lp01C、qcan -x 123 -P lp01D、lpcan -j 123 -p lp01
Multiple users are trying to telnet to the AIX server. They are able to ping the server successfully, but are getting the following error message: telnet: connect: A remote host refused an attempted connect operation Which of the following options could be the cause of this problem()A、The routing table on the AIX server is incorrect.B、The IP address in the /etc/hosts file is incorrect,C、The portmap daemon is not running on the AIX server.D、The inetd daemon is not running on the AIX server.
An operator must check the status of print queues on a regular basis. Which of the following commands can be used to check on all the print queues?()A、lslp -aB、qchk -AC、enq -s ALLD、lpstat -p ALL
单选题An administrator needs to configure a server (192.168.22.22) as a temporary solution for an NTP master that has stopped working. What is the process for configuring the NTP master?()AEdit the /etc/ntp.conf file changing the server line to 'server 127.127.1.0' and add the line 'fudge 127.127.1.0 stratum 0', and then refresh the daemon.BEdit the /etc/ntp.conf file changing the server line to 'server 127.127.1.0' and add the line 'master 127.127.1.0 stratum 0', and then refresh the daemon.CEdit the /etc/ntp.conf file changing the server line to 'server 192.168.22.22' and add the line 'fudge 192.168.22.22 stratum 0', and then refresh the daemon.DEdit the /etc/ntp.conf file changing the server line to 'server 192.168.22.22' and add the line 'master 192.168.22.22 stratum 0', and then refresh the daemon.
单选题Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()AVerify the ISV application runs on AIX 5.2BPower4 to POWER5 upgrades are not supported without a application recompileCCheck the placement and size of the boot logical volume and disk space requirements on the S85DAIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
单选题A user reports that they are getting an error when trying to save a video file to a share on a server running Windows Server 2003. The administrator looks at the file and finds that it is 5GB. The administrator checks the server and finds that the server has 100GB of free space. This file needs to be saved on the server. Which of the following should the administrator do to accomplish this?()AConvert the filesystem to EXT3.BConvert the filesystem to VMFS.CConvert the filesystem to NTFS.DConvert the filesystem to FAT32.
单选题When planning to access the on-line documentation from a remote client, which of the following procedures should be performed on the server?()AInstall and configure the HTTPServer. BAdd the name(s) of the client(s) to the httplite.conf file. CAdd the names of any clients expecting to access the documentation to the /etc/hosts file. DNo action is required.
单选题A hospital customer with an experienced AIX and Microsoft Windows staff wants to consolidate all of their file/print services onto fewer systems. They currently use multiple Microsoft Windows-based Intelsystems that are experiencing reliability problems. They also have POWER4+ systems that are running multiple AIX LPARs that have experienced no reliability issues. They need at least 99.99% uptime. Which solution will meet their uptime needs at the lowest cost?()ACombine the file/print servers onto a larger Intel-based machine (x445).BBring up a Linux LPAR on the pSeries and run Samba to provide file/print services.CBring up another AIX LPAR on the pSeries and run Samba to provide file/print services.DBring up another AIX LPAR on the pSeries and run Connect Direct to provide file/print services.
单选题You created a response file and want to check it before starting installations in silent mode. You started installation of Oracle software in interactive mode by providing the response file. In the middle of the installation, you realize that the behavior of the Oracle Universal Installer (OUI) is not consistent with the response file. What action would you take to detect the cause of this behavior?()ACompare the contents of the install.log file with the response file.BRefer to the contents of the oraInst.loc file to verify the steps performed by OUI.CCompare the contents of the installActions.log file with that of the response file.DRefer to the alert log file for information regarding the actions performed by OUI during installation.
单选题How should an administrator change the order in which host name lookup is performed so that it reads the host file before using DNS?()AEdit the /etc/inetd.conf file so that it reads ’local, bind’.BEdit the /etc/resolv.conf file so that it reads ’local, bind’.CEdit the /etc/netsvc.conf file so that it reads ’local, bind’.DEdit the /etc/nslookup.conf file so that it reads ’local, bind’.
单选题Multiple users are trying to telnet to the AIX server. They are able to ping the server successfully, but are getting the following error message: telnet: connect: A remote host refused an attempted connect operation Which of the following options could be the cause of this problem()AThe routing table on the AIX server is incorrect.BThe IP address in the /etc/hosts file is incorrect,CThe portmap daemon is not running on the AIX server.DThe inetd daemon is not running on the AIX server.
单选题A system at 192.100.45.17 is able to print to the printer. However, another system at 192.100.50.23 cannot print to the same printer. All of the following should be performed EXCEPT:()A Increase the size of /var. B Check /etc/qconfig file. C Check the default route. D Check for name resolution.
单选题A file system has been corrupted and needs to be restored. Which file contains the ufsdump levels for this file system? ()A /etc/backupB /etc/ufsdumpC /etc/dumpdatesD /etc/fsdumpdates
单选题During the process of fallover testing, a client/server database needs to be tested. On the AIX Server, start/stop/cleanup scripts and server application functionality have been tested. Before moving onto the next step of fallover testing,what action must be completed?()A Run who -a and validate that client connections are restored.B Verify that the client side application is functioning properly.C Check hacmp.out log file to validate that the application server started.D Verify that the application will successfully stop and restart on the fallover node.
单选题Because of changes in an application environment, the /etc/inittab file needs to be modified. Which of the following commands would be used to accomplish this in a supported manner()AviBchitabCchssysDchrsrc