单选题At any rate ()is liable for delay in obtaining the necessary Customs House papers for discharging,when the delay arises from the fact that special papers are required for the particular cargo carried.Athe ChartererBthe ShipownerCthe ShipperDthe Receiver

单选题
At any rate ()is liable for delay in obtaining the necessary Customs House papers for discharging,when the delay arises from the fact that special papers are required for the particular cargo carried.
A

the Charterer

B

the Shipowner

C

the Shipper

D

the Receiver


参考解析

解析: 暂无解析

相关考题:

(ii) Identify the points that must be confirmed and any action necessary in order for capital treatment toapply to the transaction. (4 marks)

There is less crime than there used to be. It seems that there is a____ in the crime rate.A. defectB. declineC. descentD. delay

The Seller shall be liable ()the Buyer () any loss or damage to the Buyer.A、to…onB、to…atC、for…forD、to…for

We shall not be held responsible for any delay in shipment or non-delivery of the goods due to force majeure.(英译中)

At any rate ______ is liable for delay in obtaining the necessary Customs House papers for discharging,when the delay arises from the fact that special papers are required for the particular cargo carried.A.the ChartererB.the ShipownerC.the ShipperD.the Receiver

The owner is not at liberty to leave the port of call as soon as the time specified in the charter-party has elapsed,though the Charterer may,if the contract so provides,be liable to compensate ______ for the delay.A.the shipperB.the ownerC.the consignorD.the consignee

Actual insertion of the value in the bill of lading is necessary if the shipper ______ more than the maximum sum per package or unit.A.wish to obtainB.wish obtainingC.wishes to obtainD.wishes obtaining

If there is any fine arising from inadequacy of marks,______ shall be liable for it.A.the CarrierB.the OwnerC.the CaptainD.the Merchant

The following conditions,except ______,require that vessels be towed through the entire Canal.A.vessels without mechanical motive powerB.vessels with disabled machinery or bad steeringC.vessels with dangerous cargoes on boardD.vessels liable to become unmanageable for any other reason

Banks have no liability for any delay or loss caused by postal or telex failure.A对B错

Please take the necessary steps()delay.

Banks have no liability for any delay or loss caused by postal or telex failure.

Ingeneral,the charterers should pay full hireunder time c/p,without any discount,except、that()A、on strik in loading portB、delay by iced discharging portC、Deficiency of menD、any conditions

单选题In any case the draught of the vessel at the()shall not be less than that which is necessary to obtain full immersion of the propeller.Aforward perpendicularBamidshipsClongitudinal center of floatationDafter perpendicular

单选题The owner is not at liberty to leave the port of call as soon as the time specified in the charter-party has elapsed,though the Charterer may,if the contract so provides,be liable to compensate()for the delay.Athe shipperBthe ownerCthe consignorDthe consignee

单选题The three basic elements necessary for any fire are ().Aheat, gas, and flamesBfuel, heat, and oxygenCheat, nitrogen, and fuelDfuel oil, nitrogen, and oxygen

单选题The officer in charge of the engineering watch shall notify the chief engineer without delay ().Ain any emergency or if in any doubt as to what decision or measures to takeBin the event of any impending action in machinery spaces that may cause reduction in ship’s speedCwhen isolating and bypassing machinery to be worked onDco-operating with any engineer in charge of maintenance work

单选题The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.AshouldBshallCthatDif

单选题If in any doubt as to the pilot’s actions or intentions,the officer in charge of the navigational watch shall().Anotify the master immediatelyBtake whatever action is necessary before the master arrivesCtake necessary actions at his/her discretionDseek clarification from the pilot

单选题If it becomes necessary to cutout an individual cylinder of a large, low-speed, main propulsion diesel engine, the fuel to that cylinder should be secured and its ()Afuel pump should be removed and all connections blanked offBcylinder oil feed rate should be increased slightly above that used at normal sea speedCcylinder oil feed rate should be reducedDcylinder oil feed rate should be increased to the maximum flow capable of the metering pump

判断题Banks have no liability for any delay or loss caused by postal or telex failure.A对B错

单选题If shore personnel are not permitted to work due to failure of the Owners to comply with the necessary regulations,or because of a lack of necessary certificates,any time so that lost to count as().ADemurrageBDespatchCOff-hireDDelay

单选题Actual insertion of the value in the bill of lading is necessary if the shipper()more than the maximum sum per package or unit.Awish to obtainBwish obtainingCwishes to obtainDwishes obtaining

单选题If the broker’s lien of the bill of lading for his charges in respect of goods is not satisfied before the goods have reached their destination,he may have the goods()home in order to retain his lien on them,and is not liable to any action for so doing.AdeliveredBprovidedCbroughtDbecome

单选题I don’t know exactly, what he did, but _____ he got a knighthood for it.Ain any rateBat that rateCat this rateDat any rate

单选题If there is any fine arising from inadequacy of marks,()shall be liable for it.Athe CarrierBthe OwnerCthe CaptainDthe Merchant

单选题Any Works completion date quoted by the Repairer is an estimate only and the Repairer shall not be()liable for any failure to complete the Works by that date.Aliable for any repairBliable for any failureCresponsible for any repairDresponsible for any fulfilling