名词解释题Off-air call setup
名词解释题
Off-air call setup
参考解析
解析:
暂无解析
相关考题:
在UE发起CS12.2K业务时,下列哪些直传消息在主叫信令流程中可以看到() A.CM SERVICE REQUEST;B.CALL CONFIRMED;C.CALL PROCEEDING;D.SETUP;
YouworkfortheXxxCorporation.YouareplanningtoinstallExchange2010inalldomainsoftheXxxforest.Theforeststructureisshowninthediagrambelow:WhatcommandshouldyouruntopreparethedomainsintheXxxforestforExchange2010?()A.setup/PrepareAD/on:XxxB.setup/PrepareDomain:XxxC.setup/padD.setup/ps
A Call Drop Rate=ERAB Abnorm Rel/ERAB Normrel*100%B Call Drop Rate=ERAB Abnorm Rel/ERAB Release Total*100%C Call Drop Rate=ERAB Abnorm Rel/RRC Connection Setup Success+100%D Call Drop Rate=ERAB Abnorm Rel/ERAB Setup Success+100%
信号“CALL CONFIRMED”从手机传送到MSC,其目的是()。A、响应来自MSC的“SETUP”信号B、响应来自MSC的“AUTHENTICATIONREQUEST”信号C、响应来自MSC的“PAGINGCOMMAND”信号D、响应来自MSC的“CIPHERMODE”信号
AgilentE64xx软件中Call Status窗口的“Setup时长”是指()阶段。A、Channel Request到Connect之间时长B、Setup到Alerting之间时长C、Immediate Assignment到setup之间时长D、Channel Request到Assignment Complete之间时长
在UE发起CS12.2K业务时,下列哪些直传消息在主叫信令流程中可以看到()A、CM SERVICE REQUEST;B、CALL CONFIRMED;C、CALL PROCEEDING;D、SETUP;
以下对于华为ProbeAsisstant软件侧掉话率公式定义正确的是:()A、Call Drop Rate=eRAB Abnorm Rel/eRAB Setup Success*100%B、Call Drop Rate=eRAB Abnorm Rel/RRC Connection Setup Success*100%C、Call Drop Rate=eRAB Abnorm Rel/eRAB Release Total*100%D、Call Drop Rate=eRAB Abnorm Rel/eRAB NormRel*100%
诺基亚BTS参数中,“newEstabCausesSupport”是属于下列哪个组群的()。 A、BCCH TRX Channel AllocationB、Call ControlC、AveragingD、FACCH call setup optional
主叫手机在呼叫建立过程中,下面哪个空中接口信令上包含被叫手机的电话号码()。A、Channel RequestB、CMService RequestC、Call confirmedD、Setup
Which statement is true about the distributed call control in a VoIP network?()A、the VoIP endpoints have the intelligence to set up and control callsB、Call setup and control functionality is centralized in one call agent or clusterC、Call setup and control resides in call agents that are distributed throughout the networkD、Each VoIP device has separate call control, voice packetization, and transport mechanisms
CALL CONFIRMED是从MS发送到MSC的信号,其作用是()。A、响应MSC的SETUP信号B、响应MSC的AUTHENTICATION REQUEST信号C、响应MSC的PAGING COMMAND
PDP上下文激活过程,不应包括的信令流程是:()A、ACTIVATE PDP CONTEXT REQUESTB、radio Bearer SetupC、radio Bearer Setup CompleteD、CALL PROCEEDING
紧急呼叫与MOC的不同之处在于()。A、RRC CONNECTION REQUEST消息的原因不同B、初始直传消息中CM SERVICE REQUEST消息的业务类型不同C、呼叫建立(call setup)中的建立消息不同D、没有随机接入的过程
In a VoIP network, which three call signaling protocols are supported by the Cisco CallManager for call setup, call maintenance, and call teardown? ()A、 H·323B、 UDPC、 RTPD、 TCPE、 Media Gateway Control Protocol (MGCP)F、 session initiation protocol (SIP)
Which of the following are functions that are often provided by an ITSP but are not typically provided by the PSTN?()A、 QoSB、 call setup and teardownC、 call routingD、 call supervisionE、 audio signal compression
Which statement describes the distributed call control model in VoIP networks?()A、The gateway voice-capable device is configured to support call control directly performing call setup, call maintenance, and call teardownB、The gateway voice-capable device has a local call routing table configured through a routing protocol.C、The gateway voice-capable device relies on a call agent to support call control.D、The gateway voice-capable device relies on a gatekeeper to support call setup, call maintenance, and call teardown.
单选题紧急呼叫与MOC的不同之处在于()。ARRC CONNECTION REQUEST消息的原因不同B初始直传消息中CM SERVICE REQUEST消息的业务类型不同C呼叫建立(call setup)中的建立消息不同D没有随机接入的过程
单选题Which statement is true about the distributed call control in a VoIP network?()Athe VoIP endpoints have the intelligence to set up and control callsBCall setup and control functionality is centralized in one call agent or clusterCCall setup and control resides in call agents that are distributed throughout the networkDEach VoIP device has separate call control, voice packetization, and transport mechanisms
单选题Which setup procedure begins on the Cisco CRS server immediately after Cisco CRS 4.5 is completely installed?()ACisco Unified CallManager cluster setup BSQL 2K server setup CCisco CRS server setup DCisco CRS cluster setup
单选题诺基亚BTS参数中,“newEstabCausesSupport”是属于下列哪个组群的()。ABCCH TRX Channel AllocationBCall ControlCAveragingDFACCH call setup optional
单选题Which statement describes the distributed call control model in VoIP networks?()AThe gateway voice-capable device is configured to support call control directly performing call setup, call maintenance, and call teardownBThe gateway voice-capable device has a local call routing table configured through a routing protocol.CThe gateway voice-capable device relies on a call agent to support call control.DThe gateway voice-capable device relies on a gatekeeper to support call setup, call maintenance, and call teardown.
多选题Which two statements are true about CAC?()ACAC is implemented in the call setup phase to allocate bandwidth resourcesBCAC is implemented in the call maintenance phase to allocate bandwidth resourcesCCAC is utilized during the call teardown phase to ensure that all resources have been releasedDCAC uses the Cisco RSVP (Resource Reservation Protocol) Agent to integrate call-processing capabilities with the underlying network infrastructureECAC is implemented in the call setup phase to determine the destination of the call
多选题In a VoIP network, which three call signaling protocols are supported by the Cisco CallManager for call setup, call maintenance, and call teardown?()AH323BUDPCRTPDTCPEMedia Gateway Control Protocol (MGCP)Fsession initiation protocol (SIP)