单选题If a vessel takes a sudden severe list or trim from an unknown cause, you should first().Adetermine the cause before taking countermeasuresBassume the shift is due to off-center loadingCcounterflood on the side opposite the list or trimDassume the cause is environment forces

单选题
If a vessel takes a sudden severe list or trim from an unknown cause, you should first().
A

determine the cause before taking countermeasures

B

assume the shift is due to off-center loading

C

counterflood on the side opposite the list or trim

D

assume the cause is environment forces


参考解析

解析: 暂无解析

相关考题:

It can be inferred from Paragraph 5 that[A] data leakage is more severe in Europe.[B] FTC's decision is essential to data security.[C] California takes the lead in security legislation.[D] legal penalty is a major Solomon to data leakage.

In the absence of external forces,adding weight on one side of a floating vessel causes the vessel to ().A.heel until the angle of loll is reachedB.list until the center of buoyancy is aligned vertically with the center of gravityC.trim to the side opposite TCG until all moments are equalD.decrease draft at the center of flotation

A tow astern is veering from side to side on its towline.The best way of controlling the action is to ______.A.Trim the tow by the bowB.Trim the tow by the sternC.List the tow to windwardD.Adjust the length of the towing bridle

For a vessel with longitudinal inclination, an increase in GML causes ______.A.list to stabilize at an angle of lollB.trim to stabilize at an angle of lollC.trim to increaseD.trim to decrease

For a vessel with transverse inclination, an increase in GMT causes ______.A.list to stabilize at an angle of lollB.trim to decreaseC.list to increaseD.list to decrease

If a vessel takes a sudden severe list or trim from an unknown cause, you should FIRST____.A.determine the cause before taking countermeasuresB.assume the shift is due to off-center loadingC.counterflood on the side opposite the list or trimD.assume the cause is environmental forces

单选题Your vessel was damaged and initially assumed a significant list and trim; however,further increase has been slow. Based on this data,what should you expect?()AThe slowing is only temporary and the vessel will probably suddenly capsize or plunge from loss of stability due to change in the waterplane areaBThe vessel can probably be saved if further flooding can be stoppedCThe vessel will continue to slowly list and/or trim due to the free surface effect and free communication effectDThe vessel will suddenly flop to the same or greater angle of list on the other side and may capsize

单选题The change in trim of a vessel may be found by().Adividing the trim moments by MT1Bsubtracting the LCF from the LCBClooking at the Hydrostatic Properties Table for the draft of the vesselDdividing longitudinal moments by the displacement

单选题Which will most likely occur when entering shallow water? ()ARudder action will become more effectiveBThe vessel's list will changeCThe vessel's trim will changeDAn increase in speed will occur

单选题The TPC curve,one of the hydrostatic curves in a vessel’s plans,gives the number of tons().Anecessary to change the angle of list 1°at a given draftBnecessary to change trim 1 cm at a given draftCpressure per square cm on the vessel's hull at a given draftDnecessary to further immerse the vessel 1 cm at a given draft

单选题It can be inferred from paragraph 5 that ______.Adata leakage is more severe in EuropeBFTC’s decision is essential to data securityCCalifornia takes the lead in security legislationDlegal penalty is a major Solomon to data leakage

单选题Your vessel is damaged with no list,but down by the stern. There is progressive flooding and trim by the stern is increasing. What is the effect on transverse stability after the deck edge at the stern is submerged?()AKB increases,increasing BM and therefore GMBKG increases due to the weight of the added water on deckCBM decreases from loss of water plane and greater volumeDThere is no effect on transverse stability

单选题The pivoting point of a fully loaded vessel with normal trim proceeding ahead at sea speed is().Aright at the bowBone-third the length of the vessel from the bowCone-half the length of the vessel from the bowDtwo-thirds the length of the vessel from the bow

单选题If the cause of a sudden severe list or trim is negative initial stability,counter flooding into empty tanks may().Aincrease the righting momentBcause an increase in the righting armCbring the unit to an upright equilibrium positionDcause the unit to flop to a greater angle

单选题While loading cargo,a white trimming light on the starboard side comes on. This indicates that().Athe vessel has a list of about 1` to starboardBthe chutes should be directed to the starboard sideCthe chutes in No. 1 hold should be directed to the starboard sideDa severe list to starboard has developed and all loading should cease

单选题How do you determine the weight of the vessel that is supported by the ground when a vessel has run aground?()AThis requires extensive calculation and is usually performed only by a naval architect not by a ship's officerBDetermine the point where aground and the draft at that point,then calculate it using the grounding formulaCUse the hydrostatic tables and enter with the mean draft before grounding and the mean draft after groundingDUse the inclining experiment formula and substitute the change of trim for the angle of list

单选题When cargo is shifted from the main deck into the lower hold of a vessel,().AThe metacenter will move downwardBThe GM will increaseCThe center of buoyancy will move upwardDThe list of the vessel will become great

单选题() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.AThe domestic waterBBilge waterCOil transferDThe ballast

单选题What is NOT a problem area when loading barges on a LASH type vessel? ()AFrequent stability calculations requiredBThorough pre-planning requiredCLimiting depths alongside berths restrict barge draftsDMinimum trim and 0°list are required for optimum operations

单选题A vessel loads edible oil in a deep tank through a manhole at the midlength of the tank. In order to fill the tank to maximum capacity,what trim should the vessel have?()ADown by the bowBDown by the sternCDown by either the bow or sternDIn level trim

单选题What is MTI?().AThe foot/tons needed to trim the vessel by 1 inchBThe foot/tons needed to trim the vessel by 1 footCThe moments needed to trim the vessel by 1 centimeterDThe amount of vessel will trim when loading 100 tons 100 feet from the tipping Center

单选题If a vessel takes a sudden,severe list or trim from an unknown cause,you should FIRST().Adetermine the cause before taking countermeasuresBassume the shift is due to off-center loadingCcounterfloodDassume the cause is environmental forces

单选题During counterflooding to correct a severe list aggravated by an off-center load,your vessel suddenly takes a list or trim to the opposite side. You should().Acontinue counterflooding in the same directionBcontinue counterflooding,but in the opposite directionCimmediately stop counterfloodingDdeballast from the low side

单选题If the cause of severe list or trim is off-center ballast,counterflooding into empty tanks will().Aincrease the righting momentBincrease the righting armCincrease list or trimDdecrease list or trim

单选题During counterflooding to correct a severe list or trim aggravated by an off-center load,a ship suddenly takes a list or trim to the opposite side. You should().Acontinue counterflooding in the same directionBcontinue counterflooding,but in the opposite directionCimmediately stop counterfloodingDdeballast from the low side

单选题While your vessel is docked port side to a wharf,a sudden gale force wind causes the vessel’s stern lines to part. The stern begins to fall away from the dock,and no tugs are immediately available. Which measure(s) should you take FIRST?()ANotify the engineroom of the need for propulsionBShut down any cargo transfer that's in progressCLet go the port anchor and veer to a short scope of chainDObtain assistance from the terminal to put new stern lines out

单选题If the cause of a sudden severe list is negative initial stability,counterflooding into empty tanks may().Aincrease the righting momentBcause an increase in the righting armCbring the vessel to an upright equilibrium positionDcause the vessel to flop to a greater angle