A pattern that at the crest the motion of each particle is forward and at the trough it is backward relative to the wave's motion is ______.A.a trochoidB.a spheroidC.a loxodromeD.a carene
A pattern that at the crest the motion of each particle is forward and at the trough it is backward relative to the wave's motion is ______.
A.a trochoid
B.a spheroid
C.a loxodrome
D.a carene
相关考题:
资源粒子组用于定义『____』到资源粒子的映射。(The resource particle group is used to define the mapping for『____』to resource particle.)
The fact that the mass of a particle is equivalent to a certain of energy means that the particle can no longer be seen as a static object, but has to be conceived as a dynamic pattern, a process involving the energy which manifest itself as the particle’s mass.
In moving forward, a ship imparts forward motion to the water at the stems, this is known as _____.A.the speed of the vesselB.the speed of the propellerC.the wakeD.the wake fraction
Based on the description of a lahar deposit, how do clasts and matrix particles differ in size?A.Any clast is larger than the largest matrix particle.B.Any clast is smaller than the smallest matrix particle.C.Some, but not all, clasts are smaller than the largest matrix particle.D.Some, but not all, matrix particles are larger than the smallest clast.
A semisubmersible rig under tow should be ballasted down if ______.A.motion begins to be excessiveB.water begins to break over the pontoonsC.period of roll exceeds 12 secondsD.forward progress is halted by head wind
Which tanker discharge pattern would be the safest and most efficient ________.A.Empty the forward tanks and start working aft,emptying each tank in sequenceB.Start discharging with most of the discharge coming from forward,but include some from midships and after tanksC.Start pumping from forward,midships,and aft with the discharge distributed equally among the tanksD.Start pumping from midships and then work forward and aft simultaneously as the midships tank is emptied
You are designing a DNS strategy to meet the business and technical requirements. Which two actions should you perform?()A、Create a dynamic reverse lookup zone for each subnet.B、Create a dynamic forward lookup for each domain.C、Install caching-only DNS servers in the branch offices.D、Enable the BIND secondaries option for each DNS server.
根据层的Transform动画,产生真实的运动模糊现象,下列哪种方法是正确的?()A、打开运动模糊开关B、应用Each特效C、应用Direction Blur特效D、应用Motion Blur特效
An IBM Tivoli Workload Scheduler administrator finds that most of the job streams are carried forward during each production day. Which action should the administrator take to ensure that only a few job streams need to be carried forward? ()A、 change start of dayB、 disable the Carry Forward optionC、 cancel all job streams before start of dayD、 Administrator does not have to take any action
A developer is designing the presentation tier for a web application which requires a centralized requesthandling to complete common processing required by each request. Which design pattern provides asolution to this problem?()A、Remote ProxyB、Front ControllerC、Service ActivatorD、Intercepting FilterE、Business Delegate
单选题The foreign seafarers said goodbye to us and looked forward to()each other soon.AseeBseeingCbe seenDbeing seen
单选题In some river mouths and estuaries the incoming high-tide wave crest overtakes the preceding low-tide trough. This results in a wall of water proceeding upstream,and is called a().AseicheBboreCboundary waveDsurge
单选题What is the distance from the bottom of a wave trough to the top of a wave crest?()AWave lengthBWave heightCWave breadthDwave depth
单选题使用粒子工具Particle Tool在网格平面上创建一个网格状分布的栅格粒子particle1,然后通过执行Ctrl+D复制一个粒子particle2,选择两个粒子,添加重力场Gravity,结果particle1下落,而particle2没有下落,原因是()。A重力场强度太小B同时选择两个粒子添加场只能有效地添加给一个粒子,另外一个不受影响C重力场方向对于particle2粒子来说不是向下的D复制出来的粒子particle2不能认识到时间的变化,所以不会下落
单选题An IBM Tivoli Workload Scheduler administrator finds that most of the job streams are carried forward during each production day. Which action should the administrator take to ensure that only a few job streams need to be carried forward? ()A change start of dayB disable the Carry Forward optionC cancel all job streams before start of dayD Administrator does not have to take any action
单选题As a ship moves through the water,it causes a wake,which is also moving forward relative to the sea. In addition to a fore and aft motion,this wake also has a(n)().Adownward and inward flowBdownward and outward flowCupward and inward flowDupward and outward flow
单选题The length of a wave is the length().Aof the wave's crestBof the wave's troughCmeasured from crest to troughDmeasured from crest to crest
单选题To ensure the best results during the Mediterranean moor,the chains should().Abe crossed around the bowBtend out at right angles to the bowCtend aft 60°from each bowDtend forward 30°on either bow
单选题A developer is designing the presentation tier for a web application which requires a centralized requesthandling to complete common processing required by each request. Which design pattern provides asolution to this problem?()ARemote ProxyBFront ControllerCService ActivatorDIntercepting FilterEBusiness Delegate
单选题A large navigational buoy (LNB) is painted().AredByellowCwith red and white vertical stripesDwith a distinct color and pattern unique to each buoy
单选题A mooring line that checks forward motion of a vessel at a pier is a().Abow lineBforward bow lineCstern lineDstern breast line
单选题根据层的Transform动画,产生真实的运动模糊现象,下列哪种方法是正确的?()A打开运动模糊开关B应用Each特效C应用Direction Blur特效D应用Motion Blur特效
单选题The distance that a ship moves forward with each revolutionof its propeller,if there is no slip,is called().AadvanceBhead reachCpitchDtransfer
单选题A towing vessel should be on the crest of a wave at the same time as its tow and in the trough at the same time. The term used to describe this is().Atow strainBcatenary lengthCbeing in stepDWilliamson's Tow