The oil transfer procedures aboard a tanker transferring oil are NOT required to contain ______.A.The name of each person designated as the person in charge of transferB.A line diagram of the vessel's oil transfer pipingC.Special procedures for topping off tanksD.A description of the deck discharge containment system

The oil transfer procedures aboard a tanker transferring oil are NOT required to contain ______.

A.The name of each person designated as the person in charge of transfer

B.A line diagram of the vessel's oil transfer piping

C.Special procedures for topping off tanks

D.A description of the deck discharge containment system


相关考题:

Have you ever served the auxiliary engine to combustion heavy oil? What should be borne in mind when transferring oil; from heavy oil to light oil?

A shipboard oil pollution emergency plan is required of ______.A.all vessels, regardless of size and commercial applicationB.any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardC.an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveD.an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above

The transfer procedures for oil products are required to be posted ______.A.in the pilothouseB.in the officer's loungeC.in the upper pumproom flatD.where they can be easily seen or readily available

The complete details of a crude oil washing system aboard your vessel,including the operating sequences and procedures,design characteristics,a description of the system,and required personnel will be found in the ______.A.Oil Transfer Procedures ManualB.Crude Oil Washing Operations and Equipment ManualC.Code of Federal RegulationsD.Crude Oil Washing addendum to the Certificate of Inspection

Oil slick caused by spillage of oil from tanker ship is ______.A.a drop of oilB.the emulsion of oil at sea surfaceC.the weathered oilD.the oil floating on the surface of the sea water

Unless such oil tanker carries crude oil which is not suitable for crude oil washing,the oil tanker shall ______ the system in accordance with the requirements of that Regulation.A.operateB.checkC.installD.overhaul

The transfer procedures required to be followed on tankers shall contain ______.A.A list of each port of dischargeB.A line diagram of the vessel's transfer pipingC.A current crew listD.The duties by name of each person in charge required for each transfer operation

What is NOT required to be contained in the oil transfer procedures ________.A.A line diagram of the vessel's oil transfer pipingB.The number of persons on duty during oil transfer operationsC.Any special procedures for topping off tanksD.The location and capacity of all fuel and cargo tanks on the vessel

材料:Every new crude oil tanker of 20000 tons deadweight and above shall be fitted with a cargo tank cleaning system using crude oil washing.The Administration shall undertake to ensure that the system fully complies with the requirements of MARPOL within one year after the tanker was first engaged in the trade of carrying crude oil or by the end of the third voyage carrying crude oil suitable for crude oil washing,whichever occurs later.Unless such oil tanker carries crude oil which is not suitable for crude oil washing,the oil tanker shall operate the system in accordance with the requirements of that Regulation.Every existing crude oil tanker of 40000 tons deadweight and above shall be provided with segregated ballast tanks.Existing crude oil tankers may,in lieu of being provided with segregated ballast tanks,operate with a cargo tank cleaning procedure using crude oil washing unless the crude oil tanker is intended to carry crude oil which is not suitable for crude oil washing.Existing crude oil tankers may,in lieu of being provided with segregated ballast tanks or operating with a cargo tank cleaning procedure using crude oil washing,operate with dedicated clean ballast tanks in accordance with the provision of Regulation 13A of this Annex for the following period:for crude oil tankers of 70 000 tons deadweight and above,until two years after the date of entry into force of the present Convention;and for crude oil tankers of 40000 tons deadweight and above but below 70 000 tons deadweight,until four years after the date of entry into force of the present Convention.问题:A new crude oil tanker of 30000 tons deadweight shall ________.A.be fitted with crude oil washing systemB.operate dedicated clean ballast tanksC.be fitted with segregated ballast tanksD.be fitted with washing system other than crude oil washing systemExcept________,the existing crude oil tankers may operate with any of the following installations.A.segregated ballast tanksB.cargo tank cleaning procedure using crude oil washingC.operate with dedicated clean ballast tanksD.protection positionThe latest date for an existing crude oil tanker of 60000 tons deadweight to install dedicated clean ballast tanks is ________.A.until two years after the date of entry into force of the present ConventionB.until four years after the date of entry into force of the present ConventionC.within one year after the tanker was first engaged in the trade of carrying crude oilD.by the end of the third voyage carrying crude oilIt is inferred that ________.A.all oil tankers,both the newly built and existing ones,shall be fitted with a cargo tank cleaning system using crude oil washingB.a new crude oil tanker of 20 000 tons deadweight and above may,in lieu of being provided with crude oil washing system,operate with segregated ballast tanksC.a new crude oil tanker of 20 000 tons deadweight and above may,in lieu of being provided with crude oil washing system,operate with dedicated clean ballast tanksD.a new crude oil tanker of 20 000 tons deadweight and above shall not be fitted with a cargo tank cleaning system using crude oil washing immediately after her entry in the trade of carrying crude oil请帮忙给出每个问题的正确答案和分析,谢谢!

材料:The crude oil washing installation and associated equipment and arrangements shall comply with the requirements established by the Administration.Such requirements shall contain at least all the provisions of Specifications for the Design,Operation and Control of Crude Oil Washing Systems adopted by the International Conference on Tanker Safety and Pollution Prevention,1978,in Resolution 15 and as may be revised by the Organization.An inert gas system shall be provided in every cargo tank and slop tank in accordance with the appropriate Resolutions of Chapter II-2 of SOLAS.With respect to the ballasting of cargo tanks,sufficient cargo tanks shall be crude oil washed prior to each ballast voyage in order that,taking into account the tankers trading pattern and expected weather conditions,ballast water is put only into cargo tanks which have been crude oil washed. Every oil tanker operating with crude oil washing systems shall be provided with an Operations and Equipment Manual detailing the system and equipment and specifying operational procedures.Such a Manual shall be to the satisfaction of the Administration and shall contain all the information set out in the Specifications referred to in this Regulation.If an alteration affecting the crude oil washing system is made,the Operations and Equipment Manual shall be revised accordingly.问题:According to this passage,with respect to the ballasting of cargo tanks,ballast water is put only into ________.A.slop tanks which have been cleaned with waterB.gas freed cargo tanksC.inertized cargo tanksD.cargo tanks which have been crude oil washed________ shall be approved by the Administration.A.Specifications for the Design,Operation and Control of Crude Oil Washing SystemsB.Appropriate Resolutions of Chapter II-2 of SOLASC.An Operations and Equipment Manual detailing the crude oil washing system and equipment and specifying operational proceduresD.International Conference on Tanker Safety and Pollution Prevention,1978This paragraph is most likely extracted from________.A.MARPOL 73/78B.SOLASC.IBCD.IGCIt can be concluded that ________.A.it is not necessary to do crude oil washing prior to ballast voyageB.taking into account the tanker's trading pattern and expected weather conditions,it is sometimes necessary to do crude oil washing after each ballast voyageC.if it is possible ballast water shall always be put into cargo tanks prior to commencing their crude oil washing operationsD.sufficient cargo tanks shall be crude oil washed prior to each ballast voyage in order that the tanker could be kept properly ballasted without breaking any regulations in connection with ballasting of cargo tanks请帮忙给出每个问题的正确答案和分析,谢谢!

单选题When you are transferring fuel oil to the setting tanks, precautions to be observed should include ()Aplugging gooseneck tank vents to prevent accident overflowBmaintaining a high transfer rate until a slight trickle of oil is observed flowing from the overflow lineCsounding the tanks frequently and reducing the transfer rate as the level approaches maximum fillDmaintaining a supply of chemical dispersant to cleanup minor oil spills adjacent to the ship

单选题Every oil tanker operating with dedicated clean ballast tanks shall be()with a Dedicated Clean Ballast Tank Operation Manual detailing the system and specifying operational procedures.AcompliedBrepliedCdividedDprovided

单选题Which of the following operations aboard a tanker must be recorded in the Oil Record Book ()AAny internal transfer of oil cargo during a voyageBThe discharge overboard in port or at sea of any bilge water accumulated in machinery spacesCThe loading or unloading of any or all oil cargoDAll of the above

单选题Ballast water can only be()in cargo tanks in exceptional cases where the particular character of the operation of an oil tanker renders it necessary to carry ballast water in excess of the quantity required,provided that such operation of the oil tanker falls under the category of exceptional cases as established by the Organization.AcarriedBcontainedCfilledDstuffed

单选题A shipboard oil pollution emergency plan is required of ().Aall vessels, regardless of size and commercial applicationBany barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardCan oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveDan oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above

单选题A shipboard Oil Pollution Emergency Plan is required of().Aall vessels,regardless of size and commercial applicationBany barge or ship constructed or operated in such a manner that no oil in any form can be carried aboardCan oil tanker of 150 gross tons and above,or other ship of 400 gross tons and aboveDan oil tanker of 400 gross tons and above,or other ships of 150 gross tons and above

单选题The pollution prevention regulations do not apply to the transfer or discharge of ()Abunker fuel for use aboard shipBlubricating oil for use aboard shipCcoconut oil carried in tank vesselsDoily water from a ships bilges

单选题Any oil tanker which is not required to be provided with segregated ballast tanks in accordance with this paragraph may,however,be qualified as a segregated ballast tanker ()it complies with the other requirements of paragraphs of this Convention.Aprovided thatBon the part ofCneverthelessDnotwithstanding

单选题Which of the following fuel oil characteristics establishes the danger point when transferring, pumping, and firing procedures are concerned?()AFire pointBFlash pointCSpecific gravityDviscosity

单选题What would you consult to determine the number of persons required on duty while loading a cargo of leaded gasoline on your tanker? ()Athe Matitime Code of ChinaBCertificate of InspectionCOil Transfer Procedures ManualDIOPP Certificate

单选题The complete details of a crude oil washing system aboard your vessel,including the operating sequences and procedures,design characteristics,a description of the system,and required personnel will be found in the().AOil Transfer Procedures ManualBCrude Oil Washing Operations and Equipment ManualCCode of Federal RegulationsDCrude Oil Washing addendum to the Certificate of Inspection

单选题The transfer procedures for oil products are required to be posted ().Ain the pilothouseBin the officer's loungeCin the upper pumproom flatDwhere they can be easily seen or readily available

单选题During oil transfer operations,who is responsible for ensuring that the posted transfer procedures are followed?().AThe designated person in chargeBThe tankermanCThe senior able seamanDThe oiler

单选题Cargo transfer operations on a tanker need NOT be stopped when().Aa tug comes alongside while the tanker is loading grade D and E cargoesBa large,fresh oil spill is discovered immediately adjacent to the side of the tankerCthere is an electrical storm in the vicinityDthere is a fire on the dock or on a nearby vessel

单选题During oil transfer operations, who would be responsible to guarantee that the posted transfer procedures are being followed?()AThe designated person in chargeBThe tanker manCThe senior able seamanDThe oiler

单选题Fuel oil transfer systems used onboard diesel propelled vessels are required to have ().Atwo fuel oil transfer pumps provided where one is to be independent of the main engineBtwo fuel oil transfer pumps, with a combined capacity exceeding the maximum consumption of the main engineCengine driven transfer pumps and only used in constant speed applicationsDthe capacity of the engine driven pump exceed the consumption rate of the engine to which it is attached

单选题Every()shall be fitted with a cargo tank cleaning system using crude oil washing.Aexisting crude oil tanker of 20000 tons deadweight and underBnew crude oil tanker of 20000 tons deadweight and underCexisting crude oil tanker of 20000 tons deadweight and aboveDnew crude oil tanker of 20000 tons deadweight and above