A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a ______.A.temporary guide baseB.permanent guide baseC.guide frameD.foundation template

A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a ______.

A.temporary guide base

B.permanent guide base

C.guide frame

D.foundation template


相关考题:

Which command is used to restore a Junos device to its default state?() A. load factory-defaultB. load override factory-defaultC. load replace defaultD. load set default

将格式化输出命令的输出送打印机的正确命令是______。A.SET PRINT ONB.SET PRINT OFFC.SET DEVICE TO PRINTERD.SET DEVICE TO SCREEN

A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a ______.A.heavy-walled drill pipeB.tool jointC.down hole toolD.drill collar

A sea anchor is ______.A.a heavy anchor with an extra long line used to anchor in deep waterB.a cone shaped bag used to slow down the wind drift effectC.a pad eye to which the sea painter is made fastD.made of wood if it is of an approved type

______ means the seabed and ocean floor and subsoil thereof,beyond the limits of national jurisdiction.A.AREAB.PLACEC.SEA ROOMD.WATER

In nautical terminology a dog is a ______.A.Crow barB.Device to force a water tight door against the frameC.Heavy steel beamD.Wedge

______should be used during the poor visibility if the rader’s screen shows heavy sea returns.A.Gain ControlB.Brilliant ControlC.Anti-clutter Sea ControlD.Sweep Intercept

It is required that______should be used during the poor visibility if the radar’s screen shows heavy sea returns.A.Gain ControlB.Brilliant ControlC.Anti-clutter Sea ControlD.Sweep Intercept

重吊杆用于吊大的重件。()A、Heavy derrick is used for lifting large heavy cargo.B、Derrick is used for lifting large heavy cargo.C、Heavy derrick is used for lifting dry bulk cargo.D、Derrick is used for lifting dry bulk cargo.

Which service component if detailed design development includes completing the Cisco Unified Communications station review template and ensuring that user groups have the right set of features, functions, dialing capabilities, and applications()A、Device-Level DesignB、System Design WorkshopC、Feature and Functionality Design WorkshopD、Physical Design Workshop

Which of the following tools are used to apply a Security Template in Windows Server 2012 R2?()A、Integration ServicesB、Security Configuration and AnalysisC、Resultant Set of PolicyD、TS ManagerE、Resource meteringF、Active Directory Domains and Trusts

单选题To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()ASpeed limiting governorBOver-speed governorCOver-speed tripDOver-speed relay

单选题A sea anchor is().Aa heavy anchor with an extra long line used to anchor in deep waterBa cone shaped bag used to slow down the wind drift effectCa padeye to which the sea painter is made fastDmade of wood if it is of an approved type

单选题Most drill ships and barges have a walled opening below the derrick,open to the water’s surface and through which various drilling tools can pass down to the sea floor called a ().Amoon poolBspider deck openingCpontoonDkeyway

单选题A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a().Atemporary guide baseBpermanent guide baseCguide frameDfoundation template

单选题A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a().Aheavy-walled drill pipeBtool jointCdown hole toolDdrill collar

单选题A sea anchor is().Aa heavy anchor with an extra long line used to anchor in deep waterBa cone shaped bag used to slow down the wind drift effectCa pad eye to which the sea painter is made fastDmade of wood if it is of an approved type

单选题Which of the following tools are used to apply a Security Template in Windows Server 2012 R2?()AIntegration ServicesBSecurity Configuration and AnalysisCResultant Set of PolicyDTS ManagerEResource meteringFActive Directory Domains and Trusts

单选题重吊杆用于吊大的重件。()AHeavy derrick is used for lifting large heavy cargo.BDerrick is used for lifting large heavy cargo.CHeavy derrick is used for lifting dry bulk cargo.DDerrick is used for lifting dry bulk cargo.

单选题To determine the number of Able Seamen required on a mobile offshore drilling unit,you should check the().Aload line certificateBOperations ManualCSafety of Life at Sea CertificateDCertificate of Inspection

单选题A fid is a().Amallet used when splicing wire ropeBsharp pointed crow bar used to unlay wire ropeCtapered steel pin used to separate wire ropeDtapered wooden pin used when splicing heavy rope

单选题Chain slings are suitable for heavy slender articles,such as().Atimber or steel railsBlocomotives or boilersCrailway passenger coachesDmotor vehicles

单选题You have built your own light-weight templating mechanism. Your servlets, which handle each request,dispatch the request to one of a small set of template JSP pages. Each template JSP controls the layout ofthe view by inserting the header, body, and footer elements into specific locations within the template page.The URLs for these three elements are stored in request scoped variables called, headerURL, bodyURL,and footerURL, respectively. These attribute names are never used for other purposes. Which JSP codesnippet should be used in the template JSP to insert the JSP content for the body of the page?()Ajsp:insert page=’${bodyURL}’ /Bjsp:insert file=’${bodyURL}’ /Cjsp:include page=’${bodyURL}’ /Djsp:include file=’${bodyURL}’ /Ejsp:insert page=’%= bodyURL %’ /

单选题Which command is used to restore a Junos device to its default state?()Aload factory-defaultBload override factory-defaultCload replace defaultDload set default

单选题()should be used during the poor visibility if the radar’s screen shows heavy sea returns.AGain ControlBBrilliant ControlCAnti-clutter Sea ControlDSweep Intercept

单选题Each drilling unit equipped with helicopter fuel storage tanks must have the tanks installed as far as practicable from the().Alanding area and sources of vapor ignitionBmain deckCengine roomDdrill floor

单选题Which tensioning device is used with chain to secure heavy vehicles aboard Ro-Ro vessels().AChain leverBBuckle tensionerCAdjust-a-matic tensionerDRatchet tensioner