135 Increasing resources on the critical path activities may not always shorten the length of the project because:A. Certain activities are time-dependent rather than resource-dependent (i.e., using three ovens rather than one to bake a cake).B. Safety, OSHA and EPA may have placed restrictions on the number of people used on certain activities or in the physical location of the project.C. The skill level of the added resources might not be appropriate for the activities to be performed. D. Adding more resources may create additional work and produce inefficiencies (i.e., additional people may need training and supervision.)E. All of the above

135 Increasing resources on the critical path activities may not always shorten the length of the project because:

A. Certain activities are time-dependent rather than resource-dependent (i.e., using three ovens rather than one to bake a cake).

B. Safety, OSHA and EPA may have placed restrictions on the number of people used on certain activities or in the physical location of the project.

C. The skill level of the added resources might not be appropriate for the activities to be performed. D. Adding more resources may create additional work and produce inefficiencies (i.e., additional people may need training and supervision.)

E. All of the above


相关考题:

The basic terminology for networks includes:A.Activities, events, manpower, skill levels and slack.B.Activities, documentation, events, manpower and skill levels.C.Slack, activities, events, and time estimates.D.Time estimates, slack, sponsorship involvement, and activities.E.Time estimates, slack time, report writing, life cycle phases, and crashing times.

113 The basic terminology for networks includes:A. Activities, events, manpower, skill levels and slack.B. Activities, documentation, events, manpower and skill levels.C. Slack, activities, events, and time estimates.D. Time estimates, slack, sponsorship involvement, and activities.E. Time estimates, slack time, report writing, life cycle phases, and crashing times

195 The basic terminology for networks includes:A. Activities, events, manpower, skill levels and slack.B. Activities, documentation, events, manpower and skill levels.C. Slack, activities, events, and time estimates.D. Time estimates, slack, sponsorship involvement, and activities.E. Time estimates, slack time, report writing, life cycle phases, and crashing times

You must________your cabe from 6 shackles to 3 shackles.A.cutB.pay outC.slackD.shorten

根据以下内容,回答235-239题。What is the last day to apply for the WHC position? (  )A.May 1B.May 10C.May 17D.May 27

In?project?net work?diagram,the?number?of?critical?path?is()。A.noneB.only?oneC.only?twoD.one?or?more

下面英文日期写法错误的是____?A.May 1, 2015B.1 May,2015C.1 May 2015D.May 1st, 2015

关于os.path子库,以下选项中用来计算相对路径的函数是:A.os.path.abspath(path)B.os.path.relpath(path)C.os.path.normpath(path)D.os.path.basename(path)

关于os.path子库,以下选项中用来计算相对路径的函数是:‪‬‪‬‪‬‪‬‪‬‮‬‪‬‮‬‪‬‪‬‪‬‪‬‪‬‮‬‫‬‮‬‪‬‪‬‪‬‪‬‪‬‮‬‭‬‫‬‪‬‪‬‪‬‪‬‪‬‮‬‪‬‮‬‪‬‪‬‪‬‪‬‪‬‮‬‫‬‮‬‪‬‪‬‪‬‪‬‪‬‮‬‪‬‭A.os.path.normpath(path)B.os.path.basename(path)C.os.path.abspath(path)D.os.path.relpath(path)

3、下列哪一个表述是正确:A.always@(posedge CLK or RST)B.always@(posedge CLK or negedge RST or A)C.always@(posedge CLK or D or Q)D.always@(posedge CLK or negedge RST)