● The scope of a project can be expected to change if:A The project manager must provide cost estimates without having a design conceptB Oversimplification (underestimating) of the nature of the work occursC The project manager is assigned after the project is defined, and the cost and schedule are approvedD A clear objective is not providedE All of the above are possible based upon the situation

● The scope of a project can be expected to change if:

A The project manager must provide cost estimates without having a design concept

B Oversimplification (underestimating) of the nature of the work occurs

C The project manager is assigned after the project is defined, and the cost and schedule are approved

D A clear objective is not provided

E All of the above are possible based upon the situation


相关考题:

● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)A.riskB.problemC.resultD.data

Project ______is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.A.riskB.problemC.resultD.data

以下关于Openstack租户Project说法错误的是()。 A、一个Project资源集合可供多个用户使用B、Project是Openstack各个服务中的一些可以访问的资源集合C、网络云各Project采用硬件共享,逻辑隔离的方式D、租户是一个有身份验证信息的API实体

—_______ I return the book to the library this week?— No, you _______.You can keep it until the end of this month. A.Must; needn’tB.Can; can’tC.May; mustn’tD.Can; mustn’t

Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.A.riskB.problemC.resultD.data

中国青少年发展基金会在网上的主页地址是()。 A.http://project-hopE.cydF.gov.cnB.http://project-hopE.cydF.acC.http://project-hopE.cydF.edu.cnD.http://project-hopE.cydF.com.cn

---- Look! The man at the gate ________ be our headmaster. He is always standing there every morning.--- - No, it ________ be him. He is holding a meeting in the office now.A.must, can’t B.must, mustn’t C.can’t, can’t D.can’t, mustn’t

Project()is an uncertain event or condition that,if it occurs,has a positiveor a negative effect on at least one project objective,such as time,cost,scope, or quality.A.riskB.problemC.resultD.data

Project( )is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.A.riskB.problemC.resultD.data

以下选项中哪个选项是根路径的表达方法?A.D:/Program Files/.Net/Project1B./root/.Net/Project1C../home/.Net/Project1D.file://D:/Program Files/.Net/Project1