A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()A、The Blades must use the same CIOv and CFFh expansion adapter types.B、Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86 Blades.C、The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades are in bays 1-7 and the x86 Blades are in slots 8-14.D、The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).
A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()
- A、The Blades must use the same CIOv and CFFh expansion adapter types.
- B、Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86 Blades.
- C、The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades are in bays 1-7 and the x86 Blades are in slots 8-14.
- D、The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).
相关考题:
Which two factors determine the recommended maximum number of virtual interfaces on a Cisco UCSsystem?()A、the number of computer blades in the systemB、the number of interfaces sharing the uplinksC、the driver version on the OS running on the computer bladeD、the number of uplinks between I/O Module and Fabric Interconnect
A customer is concerned about rising power costs, and the limited space they have left in the computer room. They have been doing some research into virtualization and would like to know if they should pursue this solution. Which of the following architectural features should be discussed with them?()A、x3650 M3 servers and racksB、x3550 M3 servers, VMware and racksC、BladeCenter, blades and VMwareD、x3620 M3 servers and VMware
A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration: (1)two Brocade 20-Port SAN Switch Modules (2)two Nortel Networks 1/10 GB Uplink ESM (3)a redundant AMM What is the minimum number of power supplies needed for this configuration to have full redundancy?()A、4B、3C、2D、8
A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum amount of rack space required to implement the solution of the following?()A、32UB、21UC、25UD、22U
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()A、6B、8C、10D、12
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()A、12 B、10 C、8 D、6
A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()A、iDataPlex with vSphereB、Four x3550 M3 servers,vSphere and racksC、BladeCenter, HX5 blades and vSphereD、One x3950 X5 servers andvSphere
A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()A、A p650 running AIX v5.3B、A p5-550 running AIX v5.3C、A p5-570 running Advanced POWER VirtualizationD、Multiple rack-mounted p615s running dynamic LPAR
Which of the following solutions provides maximum core density per rack?()A、Power 730B、PS700 BladesC、PS702 BladesD、PS703 Blades
An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()A、POWER7 servers running AIX 5.3 operate in POWER5+ mode.B、POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.C、POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.D、POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()A、PowerVM Standard EditionB、VMControl Standard EditionC、Hardware Management ConsoleD、IBM Systems Director Standard Edition
A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()A、One 50 GB SATA 1.8 inch SSDB、Two 73GB 10K SAS HDD SFFC、Two 31 GB SATA 2.5 inch SSDD、Two 50GB SATA 1.8 inch SSD
A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()A、32U B、25U C、22U D、21U
A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()A、Two additional power suppliesB、Fibre Channel (FC) switches and SAN storageC、A Nortel 1/10 GB ESMD、SSD for the HX5
Which of the following lists of items all require an HMC to function with POWER5?()A、Running AIX 5.3 Implementing HACMP Implementing Static LPARB、Implementing Advanced POWER Virtualization Running Linux Attaching RIO drawersC、Implementing VIO Server Implementing Dynamic LPAR Running with SMT turned "On"D、Running AIX and Linux on the same system Implementing CoD Implementing Micro-Partitioning
A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()A、SAN Switch modulesB、BlowersC、Power suppliesD、Battery backup units
A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()A、A power module has failed and there is not enough power to see video on all blades.B、MUX 3 on theBladeCenter backplane has failed.C、A firmware update is required on the AMM.D、A second AMM is required to view video on blades 9-14.
单选题A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()AThe Blades must use the same CIOv and CFFh expansion adapter types.BTwo physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86 Blades.CThe x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades are in bays 1-7 and the x86 Blades are in slots 8-14.DThe x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).
单选题A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()APowerVM Standard EditionBVMControl Standard EditionCHardware Management ConsoleDIBM Systems Director Standard Edition
单选题A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()AA p650 running AIX v5.3BA p5-550 running AIX v5.3CA p5-570 running Advanced POWER VirtualizationDMultiple rack-mounted p615s running dynamic LPAR
单选题A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()ATwo additional power suppliesBFibre Channel (FC) switches and SAN storageCA Nortel 1/10 GB ESMDSSD for the HX5
单选题A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()AThe Blades must use the same CIOv and CFFh expansion adapter types.BTwo physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86 Blades.CThe x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades are in bays 1-7 and the x86 Blades are in slots 8-14.DThe x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).
单选题An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()APOWER7 servers running AIX 5.3 operate in POWER5+ mode.BPOWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.CPOWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.DPOWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.
单选题A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()A12 B10 C8 D6
多选题Which two factors determine the recommended maximum number of virtual interfaces on a Cisco UCSsystem?()Athe number of computer blades in the systemBthe number of interfaces sharing the uplinksCthe driver version on the OS running on the computer bladeDthe number of uplinks between I/O Module and Fabric Interconnect
单选题A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()AOne 50 GB SATA 1.8 inch SSDBTwo 73GB 10K SAS HDD SFFCTwo 31 GB SATA 2.5 inch SSDDTwo 50GB SATA 1.8 inch SSD
单选题A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()ASAN Switch modulesBBlowersCPower suppliesDBattery backup units