DRP(distribution requirement planning)是()A、分配需求计划B、配置管理计划C、配送需求计划D、配送管理计划

DRP(distribution requirement planning)是()

  • A、分配需求计划
  • B、配置管理计划
  • C、配送需求计划
  • D、配送管理计划

相关考题:

What is the reserve requirement?A.The requirement for cash reserves.B.The requirement for deposits in cash.C.The percentage of a bank's deposits in the form. of cash reserves.D.The requirement of a bank to deposit a percentage of money.

What is the reserve requirement?A.The requirement of a bank to deposit a percentage of moneyB.The requirement for deposits in cashC.The percentage of a bank's deposits in the form. of cash reservesD.The requirement for cash reserves

人们把( )的原理应用到流通领域,发展出营销渠道需求计划(Distribution Requirement Planning,简称为DRP)。 A.MRPB.EDIC.POSD.ATM

与DRP不同的是,DRPⅡ具有( )的特点。A.标准性B.闭环性C.创新性D.及时性

Which two of these are correct regarding the recommended practice for distribution layer design based on the following configuration?() A. use a Layer 2 link between distribution switchesB. use a Layer 3 link between distribution switchesC. use a redundant link to the coreD. use a Layer 3 link between distribution switches with route summarization

与分销需求计划(DRP)相比,DRPⅡ增加的内容有()。A:车辆管理B:仓储管理C:物流能力计划D:安全生产管理E:成本核算系统

当审计师进行DRP审计时,下列哪项是一个信息系统审计师最应该关心的?()A、DRP尚未经过测试B、新的团队成员都没有看到过DRPC、经理负责对DRP的最近的推出D、DRP的手册不是定时更新

DRP输出文件包括哪些?

DRP输入文件包括哪些?

配送需求计划(DRP)

什么是DRP和DRPⅡ?

进行DRP测试的主要目的是()。A、评估DRP计划的高效性B、验证DRP计划的有效性C、确定恢复实践目标(RTO)D、确定恢复点目标(RPO)

分销需求计划DRP的功能包含有()。A、分销网络维护B、运输C、DRP的展开D、分销订单E、库存配置

英译中:Distribution resource planning(DRP)

DRP处理的是生产过程的物料流问题,DRP处理的是流通领域的物料流。()

制造企业安全库存、销售企业安全库存分别由( )设定。A、生产周期、销售周期B、消耗量、提前期C、DRP,MRPD、MRP,DRP

论述配送需求计划(DRP)的好处。

简述DRP?

What is PDM?()A、Production distribution managementB、Physical distribution managementC、Processing distribution managementD、Pallets distribution management

()is the management system to control the material consumed, reduce inventory in the manufacture company.A、DRP (Distribution Resource Planning)B、LRP (Logistics Resource Planning)C、MRP (Material Requirements Planning)D、ERP (Enterprise Resource Planning)

You have an Exchange Server 2010 organization.You create a distribution group for all users in your company.You need to ensure that new users can add their mailboxes to the distribution group.What should you do?()A、Modify the group scope of the distribution group.B、Modify the approval mode of the distribution group.C、Modify the security settings of the distribution group.D、Modify the authentication settings of the ECP virtual directory.

判断题DRP处理的是生产过程的物料流问题,DRP处理的是流通领域的物料流。()A对B错

名词解释题英译中:Distribution resource planning(DRP)

单选题DRP(distribution requirement planning)是()A分配需求计划B配置管理计划C配送需求计划D配送管理计划

问答题什么是DRP和DRPⅡ?

问答题DRP(配送需求计划)DRP技术的输入

单选题进行DRP测试的主要目的是()。A评估DRP计划的高效性B验证DRP计划的有效性C确定恢复实践目标(RTO)D确定恢复点目标(RPO)