When cabling a rack, which of the following is BEST practice?()A、Use rack specific cabling hardwareB、Let cables hang loosely behind the serversC、Channel all power cables down the sides, and all network cables down the centerD、Keep cables close to the front of the rack for better access
When cabling a rack, which of the following is BEST practice?()
- A、Use rack specific cabling hardware
- B、Let cables hang loosely behind the servers
- C、Channel all power cables down the sides, and all network cables down the center
- D、Keep cables close to the front of the rack for better access
相关考题:
When does the school have dance classes ?A. On 13th and 27thB. On 27th and 29thC. On 10th and 27thD. On 10th and 15th
When adding another server to an existing rack mount system, which of the following should the administrator consider FIRST?() A. Load on UPSB. Rack temperatureC. Room temperatureD. Ease of access
Which of the following is the MOST important physical consideration when deploying a new server?() A. Humidity monitors, Biometrics, and fire suppressionB. Cooling, rack space, and power requirementsC. Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD. Biometrics, fire suppression, and power requirements
Which of the following disaster recovery sites requires power and cabling to be run before it can be used?() A.HotsiteB.ColdsiteC.WarmsiteD.Failoversite
Which three are benefits of A virtualized data center solution over A typical implementation?()A、more efficient power consumptionB、fewer applications per serverC、less rack spaceD、more efficient routingE、more control over each serverF、simplified cabling
There are two cabling schemes to choose from when implementing a Cisco CRS-1 multishelf system:single-module cabling and multimodule cabling. What is the maximum capacity of the LCCs that aresupported in multimodule cabling?()A、9 LCCsB、7 LCCsC、10 LCCsD、6 LCCsE、8 LCCs
On which of the following hard drive types must Bob, a technician, change the jumper setting to match the motherboard/cabling combination?()A、SATAB、eSATAC、Solid stateD、PATA
When installing a server in a rack, which of the following locations describes where in the rack a server should be installed?()A、On the very bottom U of the rack, with the UPS above the serverB、In the middle of the rack to help balance the rackC、Closest to the bottom of the rack, above heavier equipmentD、On the very top U of the rack, with the UPS directly below it
When cabling a rack, which of the following is BEST practice?()A、 Use rack specific cabling hardwareB、 Let cables hang loosely behind the serversC、 Channel all power cables down the sides, and all network cables down the centerD、 Keep cables close to the front of the rack for better access
Which of the following is the MOST space efficient server chassis type within a server rack?()A、 Tower serverB、 Bare metal serverC、 Blade serverD、 Rack server
When adding another server to an existing rack mount system, which of the following should the administrator consider FIRST?()A、Load on UPSB、Rack temperatureC、Room temperatureD、Ease of access
Which of the following server chassis types allows for the HIGHEST server density in a rack?()A、Blade serverB、Tower converted to rack serverC、Tower serverD、Rack server
Which of the following describes what the number two represents in l00Base2 cabling?()A、FiberB、Coaxial cableC、UTPD、Twisted pair
Which of the following is the MOST important physical consideration when deploying a new server?()A、 Humidity monitors, Biometrics, and fire suppressionB、 Cooling, rack space, and power requirements冷C、 Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD、 Biometrics, fire suppression, and power requirements
Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()A、HotsiteB、ColdsiteC、WarmsiteD、Failoversite
When selling against competition, which of the following focus on the iDataPlex value proposition? ()A、Superior chip density B、Balance performance, cost, and power+cooling efficiency C、Flexible configurations ready for integration and testing at the customers data center D、Standard rack mounting
Which is the packaging strategy of iDataPlex of the following?()A、Fourteen servers per rack likeBladeCenterB、Two servers per rack for optimal cooling costC、One server per rack for optimal cooling and energy efficiencyD、Four servers per rack (twoexach half high) for optimal cooling
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()A、Redundant power supplies on the serversB、Redundant PDUs in the rackC、edundant power supplies in the servers and redundant PDUs in the rackD、Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)
When selling against competition, which focus on the iDataPlex value proposition of the following?()A、Superior chip densityB、Balance performance, cost, and power and cooling efficiencyC、Flexible configurations ready for integration and testing at the customer locationD、Standard rack mounting
单选题When cabling a rack, which of the following is BEST practice?()A Use rack specific cabling hardwareB Let cables hang loosely behind the serversC Channel all power cables down the sides, and all network cables down the centerD Keep cables close to the front of the rack for better access
单选题When installing a server in a rack, which of the following locations describes where in the rack a server should be installed?()AOn the very bottom U of the rack, with the UPS above the serverBIn the middle of the rack to help balance the rackCClosest to the bottom of the rack, above heavier equipmentDOn the very top U of the rack, with the UPS directly below it
单选题When adding another server to an existing rack mount system, which of the following should the administrator consider FIRST?()ALoad on UPSBRack temperatureCRoom temperatureDEase of access
单选题When adding another server to an existing rack mount system, which of the following should the administrator consider FIRST? ()A Load on UPSB Rack temperatureC Room temperatureD Ease of access
单选题Which of the following is the MOST important physical consideration when deploying a new server?()A Humidity monitors, Biometrics, and fire suppressionB Cooling, rack space, and power requirements冷C Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD Biometrics, fire suppression, and power requirements
单选题If a diesel engine rotates slowly when cranked, but does not fire, the()Afuel control rack had admitted excessive fuelBengine speed does not match the fuel rack settingCengine has failed to reach its firing speedDstarter pinion and ring gear contact is not correct
单选题There are two cabling schemes to choose from when implementing a Cisco CRS-1 multishelf system:single-module cabling and multimodule cabling. What is the maximum capacity of the LCCs that aresupported in multimodule cabling?()A9 LCCsB7 LCCsC10 LCCsD6 LCCsE8 LCCs
多选题Which three are benefits of A virtualized data center solution over A typical implementation?()Amore efficient power consumptionBfewer applications per serverCless rack spaceDmore efficient routingEmore control over each serverFsimplified cabling
单选题Which of the following is the MOST space efficient server chassis type within a server rack?()A Tower serverB Bare metal serverC Blade serverD Rack server