Which phase includes the activity of assisting the customer to monitor their Cisco Unified Communications system performance and to respond to trouble reports()A、MaintainB、DeployC、OperateD、Optimize
Which phase includes the activity of assisting the customer to monitor their Cisco Unified Communications system performance and to respond to trouble reports()
- A、Maintain
- B、Deploy
- C、Operate
- D、Optimize
相关考题:
Which of the following are included in the Acquisition phase(s) of the project life cycle.A . concept and developmentB . development and planningC . execution and phase-outD . planning and implementationE . concept and planning
Feasibility studies occur in which life cycle phase (s)?A.ConceptualB.Conceptual or DevelopmentC.ExecutionD.Preliminary planningE.any life cycle phase
Typically, during which phase in a project life cycle are most of the project expenses incurred.A . Concept phaseB . Development of design phaseC . Execution phase.D . Termination phase.E . None of the above
141 Feasibility studies occur in which life cycle phase (s)?A. ConceptualB. Conceptual or DevelopmentC. ExecutionD. Preliminary planningE. any life cycle phase
6 Typically, during which phase in a project life cycle are most of the project expenses incurred. A. Concept phaseB Development of design phaseC. Execution phase.D. Termination phase.E. None of the above
88 Typically, during which phase in a project life cycle are most of the project expenses incurred. A. Concept phaseB. Development of design phaseC. Execution phase.D. Termination phase.E. None of the above
82 Which of the following are included in the Acquisition phase(s) of the project life cycle.A. concept and developmentB. development and planningC. execution and phase-outD. planning and implementationE. concept and planning
● Feasibility studies occur in which life cycle phase (s)?A ConceptualB Conceptual or DevelopmentC ExecutionD Preliminary planningE any life cycle phase
●In which phase of the software engineering process is the Software Requirements Specification developed? (68) .(68) A.development phaseB.engineering phaseC.maintenance phaseD.Definition phase
In which phase of the software engineering process is the Software Requirements Specification developed?A. definition phaseB.engineeringC.maintenanceD.development phase
Which phase of the software development requires the most development time?A.the design phaseB.the testing phaseC.the maintenance phaseD.the development phase
Besides the __请作答该选项_ for process and data of current system, the deliverable from this phase also includes the ____ for the proposed system.A.logical models B.physical modelsC.design modelsD.implementation models
The deliverable from this phase also includes the ( ) for the proposed system. A.hardware and software specification B.system performance specification C.formal requirements definition D.general problem statement
Which of the following options lists the steps in PPP session establishment in the correct order?()A、Optional authentication phase, link establishment phase, network layer protocol phase.B、Network layer protocol phase, link establishment phase, optional authentication phase.C、Network layer protocol phase, optional authentication phase, link establishment phase.D、Link establishment phase, network layer protocol phase, optional authentication phase.E、Link establishment phase, optional authentication phase, network layer protocol phase.F、Optional authentication phase, network layer protocol phase, link establishment phase.
Which design phase service component includes the development and documentation of the test case or cases used to verify that a deployed infrastructure meets operational, functional, and interface requirements? Select exactly 1 answer(s) from the following:()。A、Implementation PlanB、Business PlanC、Staging PlanD、Detailed Design DevelopmentE、Systems Acceptance Test Plan Development
During which phase of the boot process is the rootvg volume group varied on and the root file system (hd4) checked?() A、Boot phase 1B、Boot phase 2C、Boot phase 3D、Boot phase 4
A customer has recently acquired an XIV system which is up and running. The next phase of theirdata center refresh is to do a non-disruptive data migration off older EMC equipment and beginmanaging their entire environment which also includes HP and HDS storage subsystems. Whatsolution should the storage specialist propose?()A、 SAN Volume Controller B、 IBM Systems Director C、 Additional XIV system D、 Tivoli Storage Manager
单选题Which of the following statements in INCORRECT?AThe British constitution includes the Magna Carta of 1215.BThe British constitution includes Parliamentary acts.CThe British constitution includes decisions made by courts of law.DThe British constitution includes one single written constitution.
单选题Which phase includes testing operational processes and procedures in accordance with the Cisco Unified Communications operations plan()AOperateBDesignCDeployDImplement
单选题Which of the following options lists the steps in PPP session establishment in the correct order?()AOptional authentication phase, link establishment phase, network layer protocol phase.BNetwork layer protocol phase, link establishment phase, optional authentication phase.CNetwork layer protocol phase, optional authentication phase, link establishment phase.DLink establishment phase, network layer protocol phase, optional authentication phase.ELink establishment phase, optional authentication phase, network layer protocol phase.FOptional authentication phase, network layer protocol phase, link establishment phase.
单选题Which phase includes the activity of assisting the customer to monitor their Cisco Unified Communications system performance and to respond to trouble reports()AMaintainBDeployCOperateDOptimize
单选题In which phase is a systems acceptance test plan developed and documented?()AImplementBDesignCPrepareDOperate
单选题Which phase includes conducting Cisco Unified Communications network traffic analysis and capacity planning in order to ensure high availability()ADesignBPrepareCMaintainDOptimize
单选题Which phase and service component includes comparing the solution requirements with the bill of materials and high-level design in order to finalize the detailed business and technology requirements for the Cisco Unified Communications solution()APlan - Application Readiness ValidationBPrepare - Proof of ConceptCPrepare - Technology Strategy DevelopmentDPlan - Systems Requirements Validation
单选题Select the wireless service component in the implement phase in which operations responsibilities are defined and transferred to the operate phase team.()AOngoing Support Handoff MeetingBStaff TrainingCDetailed Design DevelopmentDStaging and System Migration
单选题During which phase is a proposal developed and delivered?()APrepareBPlanCDesignDOperate