单选题A customer is unsure how POWER7 processors can outperform POWER6 processors when the clock speeds are slower. What contributes to the improved performance?()AAdded Turbo memory switchingBRemoved internal OLTP limitsCMoved L3 cache onto the chipDIncreased DDR2 memory speeds
单选题
A customer is unsure how POWER7 processors can outperform POWER6 processors when the clock speeds are slower. What contributes to the improved performance?()
A
Added Turbo memory switching
B
Removed internal OLTP limits
C
Moved L3 cache onto the chip
D
Increased DDR2 memory speeds
参考解析
解析:
暂无解析
相关考题:
Customer, This suit looks nice. _________?Assistant: Yes, of course. The fitting room is over there.A. How much is itB. Can I Try itC. How can I buy itD. Can I Try it on
Waiter: Hello, sir. ?Customer: Could you give us a second, please?Waiter: Sure.A. Are you ready to orderB. How can I help youC. Ready to take my orderD. Can I do you a favor
A customer is currently using EMC disk. They are having an issue with the time it takes to complete a backup. What IBM tool can be used to show how much improvement can occur in the time it takes to backup the disk?()A. TCOnow!B. Disk MagicC. Batch MagicD. Capacity Magic
Companycom is converting an application over to a p5 595 server with LPARs and has underestimated the processor requirements. The system has COD processors, but the customer does not know how to size the workload. What course of action would help identify the processor requirement?()A、Activate the Trial COD for the processors and run a test to verify outcomeB、Activate the On/Off COD for the processors and run a test to verify outcomeC、Use rmss to simulate the processor workload and run a test to verify outcomeD、Use rmps to simulate the processor workload and run a test to verify outcome
How can virtual processors be differentiated from dedicated processors from a physical processor viewpoint?()A、Dedicated processors are fractions of whole processors that are dedicated to a single partition. B、Virtual processors are the whole number of concurrent operations that the operating system can use. C、Virtual processors and not dedicated processors are processors used in Virtual IO Server partitions. D、Virtual processors and dedicated processors are interchangeable concepts, both are whole physical processors used in virtual and dedicated LPARs.
A System p customer is planning to implement virtualization and is concerned about how to respond to an increased workload and what limitations there are for very small workloads. Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()A、Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.B、Smallest partition 10% of a processor, as small 1% of a processor may be transferred.C、Smallest partition one processor, as small 1% of a processor may be transferred.D、Smallest partition one core, as small 10% of a processor may be transferred.
A commercial customer will soon send out a Request For Pricing (RFP) for a new large database server. Why would a pSeries technical specialist try to influence the customer to base the requirements on performance (TPC-C, Ideas International Relativity, Oracle Applications Standard Benchmark, etc.) rather than on numbers of processors?()A、IBM processor performance does not scale well over 16 ways.B、Competitors do not pay for TPC-C certification so results are not available.C、IBM servers consistently outperform some other servers on a "per CPU" basis.D、IBM prices are lower than competition when like numbers of processors are proposed.
A customer needs a new Microsoft Windows 2003 Server. They are running an application that requires substantial memory. They would like a rack mountable system, which will support four Xeon processors with 2MB of L3 cache. Which of the following is the minimum configuration to satisfy the customer’s requirements?()A、x445 with four Xeon MP processors and 8GB of memoryB、x445 with four Xeon MP processors and 16GB of memory in a single SMP moduleC、x445 with four Xeon DP processors and 16GB of memory in a single SMP moduleD、x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory
A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()A、IBM i EditionB、Express EditionC、Standard EditionD、Enterprise Edition
A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions. How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()A、Create a 32-core shared processor pool for the DB2 partitions.B、Limit the number of virtual processors on each DB2 partition to 32.C、Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.D、Set the ‘Desired Processing Units’ in each DB2 partition profile so that the sum of all partitions equals 32.
A customer has an IBM System Storage DS5000 and needs to add more disk drives to the unit.There is no record of the configuration for this machine. How can the configuration be retrieved soan upgrade can be configured?()A、use Storage Manager to export the system profileB、create a configuration ineConfig and provide proof of purchaseC、use the IBM Standalone Systems Configuration Tool (SSCT) to recreate the configurationD、have the customer contact the IBM AAS coordinator to retrieve a copy of the originalconfiguration
A customer needs a 2-way Xeon system today but plans on expanding to a 4-way early next year. The customer is looking to limit the initial costs as much as possible but may not be as budget constrained next year. Which of the following is the best solution to all the customer’s needs?()A、An x445 with 2 Xeon DP processors. Plan on adding 2 more Xeon DP processors next year.B、An x445 with 2 Xeon MP processors. Plan on adding 2 more Xeon MP processors next year.C、An x366 with 2 Xeon MP processors. Plan on adding 2 more Xeon MP processors next year.D、An x366 with 2 Xeon DP processors. Plan on adding 2 more Xeon DP processors next year.
A customer is currently using EMC disk. They are having an issue with the time it takes to complete a backup. What IBM tool can be used to show how much improvement can occur in the time it takes to backup the disk?()A、TCOnow!B、Disk MagicC、Batch MagicD、Capacity Magic
In the context of Advanced Power Virtualization, the shared pool refers to which of the following?()A、A pool of physical memory that can be used by any partitionB、A pool of physical processors that can be used by any virtual or dedicated partitionC、A pool of physical memory that can be used by multiple Micro-PartitionsD、A pool of physical processors that can be used by multiple Micro-Partitions
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()A、4B、8C、16D、32
The customer has agreed that the SAN proposal is the best solution for their budget. Howeverthey are still unsure of using such leading edge technology. Which item below would help themfeel more comfortable?()A、TCO study B、A demonstration at a BPIC C、IBM customer references D、IBM Redbooks
A customer is considering procuring HP servers with Virtual Server Environment (VSE) to consolidate servers and dynamically move resources between partitions. How can the technical sales representative position PowerVM as the solution to virtualize this server environment?()A、PowerVM supports shared servers compared to VSEB、PowerVM supports shared processors and memory compared to VSEC、PowerVM supports shared processors, memory and I/O compared to VSED、PowerVM supports DLPAR without a reboot and supports dedicated I/O compared to VSE
A customer is unsure how POWER7 processors can outperform POWER6 processors when the clock speeds are slower. What contributes to the improved performance?()A、Added Turbo memory switchingB、Removed internal OLTP limitsC、Moved L3 cache onto the chipD、Increased DDR2 memory speeds
Companycom tells the technical sales specialist that recent announcements state that virtual lan in the datacenter is the best option. The customer wants to use interpartition communication to save on adapters and increase performance. The systems are going to have shared and dedicated processor partitions. Some of the partitions will be running AIX 5.2 and some will be running AIX 5.3. The second p5 590 will be running a mixture of AIX 5.3 and Linux partitions with 2.6 kernel. What limitations of vlan/interpartition communication should be discussed with this customer?()A、Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet is supported on AIX 5L and Linux 2.5 and above. B、Virtual Ethernet can be used within groups of shared OR groups of dedicated processor partitions, but not both simultaneously. Virtual Ethernet comes with AIX 5L, and is supported in AIX 5.2 or AIX 5.3 partitions, but not Linux. C、Virtual Ethernet can be used in both shared and dedicated processor partitions. Virtual Ethernet can run in an AIX 5.3 or Linux 2.6 Kernel, but not AIX 5.2 partitions. Virtual Ethernet can only connect partitions within a single system. D、Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet can connect partitions between systems if the HMC is shared between systems.
A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()A、8 desired processing units and 8 desired virtual processorsB、2 desired processing units and 8 desired virtual processorsC、8 desired processing units and 32 desired virtual processorsD、2 desired processing units and 32 desired virtual processors
Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()A、4 processors 8GB of memoryB、5 processors 8GB of memoryC、4 processors 10GB of memoryD、5 processors 10GB of memory
单选题In the context of Advanced Power Virtualization, the shared pool refers to which of the following?()AA pool of physical memory that can be used by any partitionBA pool of physical processors that can be used by any virtual or dedicated partitionCA pool of physical memory that can be used by multiple Micro-PartitionsDA pool of physical processors that can be used by multiple Micro-Partitions
单选题The customer has agreed that the SAN proposal is the best solution for their budget. Howeverthey are still unsure of using such leading edge technology. Which item below would help themfeel more comfortable?()ATCO study BA demonstration at a BPIC CIBM customer references DIBM Redbooks
单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()AExplain to the customer that they need an additional HMC for the POWER5 system.BObtain a PO from the customer to purchase additional serial connections to the HMC.CObtain a PO from the customer to purchase additional Ethernet connections to the HMC.DExplain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
单选题How can dedicated processors be differentiated from virtual processors from a physical processor viewpoint?()ADedicated and never Virtual processors are used in Virtual IO Servers partitionsBDedicated processors are whole processors that are assigned to a single partitionCDedicated processors are fractions of whole processors that are dedicated to a single partitionDDedicated and Virtual processors are interchangeable concepts, both are whole physical processors used in virtual and dedicated LPARs
单选题A customer needs a 2-way Xeon system today but plans on expanding to a 4-way early next year. The customer is looking to limit the initial costs as much as possible but may not be as budget constrained next year. Which of the following is the best solution to all the customer’s needs?()AAn x445 with 2 Xeon DP processors. Plan on adding 2 more Xeon DP processors next year.BAn x445 with 2 Xeon MP processors. Plan on adding 2 more Xeon MP processors next year.CAn x366 with 2 Xeon MP processors. Plan on adding 2 more Xeon MP processors next year.DAn x366 with 2 Xeon DP processors. Plan on adding 2 more Xeon DP processors next year.
单选题A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()A4B8C16D32