多选题A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()AEnsure Director Agent is installed on the new servers.BEnsure a DHCP Sever is installed and configured in the environment.CEnsure Server Plus Pack option has been installed and configured.DEnsure Software Distribution has been installed on the IBM Director Server and an image has been created.EEnsure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.
多选题
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()
A
Ensure Director Agent is installed on the new servers.
B
Ensure a DHCP Sever is installed and configured in the environment.
C
Ensure Server Plus Pack option has been installed and configured.
D
Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.
E
Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.
参考解析
解析:
暂无解析
相关考题:
A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()A、 PowerVM Lx86B、 PowerVM Express EditionC、 PowerVM Standard EditionD、 PowerVM Enterprise Edition
A current Sun Solaris customer has just purchased their first p5 590. During the Solution Assurance, the backup requirements were discussed. Which of the following should be recommended to the customer with regards to restoring rootvg?()A、mksysbB、restvgC、AIX install CDsD、Veritas NetBackup
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()A、Ensure Director Agent is installed on the new servers.B、Ensure a DHCP Sever is installed and configured in the environment.C、Ensure Server Plus Pack option has been installed and configured.D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.
A Dell customer decided to use IBM Director and xSeries to manage their servers. They purchased 10 IBM x336 servers and they already have 75 various Dell servers. Which TWO steps need to be verified to be able to manage the mixed environment with IBM Director?()A、Verify that the Dell systems have TCP/IP enabledB、Verify that the systems are running the IBM Director AgentC、Verify that the managed systems are SMBIOS 2.1 and WfM 2.0 compliantD、Verify that the Dell systems have at least a 1GB of memory installedE、Install an SNMP agent on the Dell systems as IBM Director cannot manage Industry Standard non-IBM servers
A customer needs to deploy ten dual processor Xeon servers. Six servers will be running Linux and Apache, and the other four will be Citrix presentation servers. The customer’s main concerns are the rack space and the option to have SATA drives. The maximum memory required is 8GB. Which of the following options will provide the best price and performance?()A、Ten x306’s with internal SATA drivesB、Five x346’s with internal SATA drives and VMWare ESX ServerC、Five x366’s partitioned into two VMs each with VMWare ESX ServerD、Ten x336’s with internal SATA drives
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A、The EMC storage specialist has not participated in the TDA meetingB、The FC HBAs are 4 Gbps technologyC、The Technical and Delivery Assessment review actions were not executedD、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
A customer’s small heterogeneous enterprise has grown over time to more than 500 client systems, and the administrator cannot add new servers to the management database. Which of the following is the most likely source of the problem?()A、The management server has reached its size limitation.B、Additional agent licenses must be purchased.C、The CPU and Memory requirements need to be upgraded.D、The default JET database has reached its size limitation.
A customer has purchased an IBM BladeCenter H chassis and needs the following servers: --Two HS21 blade servers each with 8GB memory and 2 drives --Two HS21 blade servers each with 24GB memory and 2 drives --Two LS21 blade servers each with 2GB memory and 2 Hot-Swap SCSI drives How many total server bays will be required for this configuration?()A、6B、8C、10D、12
A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A、A DCE domainB、A Kerberos domainC、A PPP tunnel between the serversD、An IPSEC tunnel between the servers
A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the seventh LPAR boot device?()A、An additional 7311-D10 drawerB、An adapter to boot off a SAN deviceC、An additional disk to the media bayD、Two disks to the internal configuration
A customer has four 2-way 2U front-end web servers that are currently running at 15% CPU utilization. These servers provide points of access for users worldwide, and volume is expected to triple in the next six months and aggressively grow thereafter. They want to upgrade these systems to newer technology and stay within the 8U of rack space that they are replacing. Which solution would fit the customer’s requirements?()A、Three x366 4-ways running VMWare ESX Server.B、An x445 8-way Xeon MP attached to a DS4300 and running VMWare ESX Server.C、An x445 16-way Xeon MP attached to an EXP400 and running VMWare ESX Server.D、Four x346 2-ways running VMWare ESX Server.
A customer has a large HP Intel infrastructure and is actively managing these servers with Insight Manager. They recently purchased an IBM x346 server for a remote office database project. They do not want to run additional systems management software but require to be notified of PFA and hardware alerting on critical hardware components. Which of the following solutions would accomplish this?()A、Install an RSA II Slimline card on the IBM server and configure to send email alertsB、Enable the IBM management option in Insight ManagerC、Install and configure a Director agent on the IBM serverD、Configure the systems management processor on the IBM server
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A、The customer used their IBM Customer NumberB、The customer has activated their base warrantyC、The customer purchased Remote Technical Support ServicepacD、The customer escalated the issue to the Duty Manager
A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()A、Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modulesB、Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modulesC、Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modulesD、Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path. From the following options, which is the preferred migration path?()A、Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.B、Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.C、Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.D、Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.
A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()A、Two additional power suppliesB、Fibre Channel (FC) switches and SAN storageC、A Nortel 1/10 GB ESMD、SSD for the HX5
A customer has six Windows 2003 servers, three RedHat Linux servers, and three Netware servers. The current environment is direct attached storage. The customer needs a 2Gb Fibre solution that can scale up to 64 partitions over the next three years and provide connectivity to all three platforms. The customer also needs a fibre attached backup solution. Which of the following solutions has the best combination of price and performance?()A、A DS4300 Turbo with Fibre Attached Tape LibraryB、A DS4500 with EXP700’s and Fibre Attached Tape LibraryC、A DS4500 with EXP710’s and Fibre Attached Tape LibraryD、A DS4300 with Additional EXP710’s and a SCSI Attached Tape Library
单选题An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()AThe EMC storage specialist has not participated in the TDA meetingBThe FC HBAs are 4 Gbps technologyCThe Technical and Delivery Assessment review actions were not executedDThe customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
单选题A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the seventh LPAR boot device?()AAn additional 7311-D10 drawerBAn adapter to boot off a SAN deviceCAn additional disk to the media bayDTwo disks to the internal configuration
单选题A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()AA DCE domainBA Kerberos domainCA PPP tunnel between the serversDAn IPSEC tunnel between the servers
单选题A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()AContact the IBM FTSS to replace the driveBContact the IBM CSR or SSR to replace the driveCOrder a replacement driveDContact IBM Service
单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()AExplain to the customer that they need an additional HMC for the POWER5 system.BObtain a PO from the customer to purchase additional serial connections to the HMC.CObtain a PO from the customer to purchase additional Ethernet connections to the HMC.DExplain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
单选题A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()AThe customer used their IBM Customer NumberBThe customer has activated their base warrantyCThe customer purchased Remote Technical Support ServicepacDThe customer escalated the issue to the Duty Manager
单选题Your end user customer has not requested a ServicePac to cover the base unit and options they have purchased. What is a compelling reason to offer service? ()AIBM ServicePacs remove a liability from you the reseller in the event of fireBIBM ServicePacs remove a liability from you the reseller in the event of floodingCIBM ServicePacs provide improved warranty coverageDService just adds a layer of cost you do not needEall of the above
单选题A customer has four 2-way 2U front-end web servers that are currently running at 15% CPU utilization. These servers provide points of access for users worldwide, and volume is expected to triple in the next six months and aggressively grow thereafter. They want to upgrade these systems to newer technology and stay within the 8U of rack space that they are replacing. Which solution would fit the customer’s requirements?()AThree x366 4-ways running VMWare ESX Server.BAn x445 8-way Xeon MP attached to a DS4300 and running VMWare ESX Server.CAn x445 16-way Xeon MP attached to an EXP400 and running VMWare ESX Server.DFour x346 2-ways running VMWare ESX Server.
单选题A customer wants to hold all enterprise data on their DS4000 system. Several servers were added after they purchased another company. The servers that have to be run are: (1)An Oracle database running on a HP-UX server (2)Several virtual machines running on VMWare ESX server (3)A Microsoft cluster running Exchange 2000 server Which of these new servers can be integrated with the DS4000?()ADS4000 storage does not support HP-UX, so the HP-UX server cannot be integrated.All other new servers can be used.BAn Exchange cluster needs local disks, so the DS4000 cannot be used for this.All other new servers can be used.CWhen equipped with proper HBA’s and subsystem device drivers, all new servers can operate with the DS4000 storage device.DVMWare ESX can use the DS4000 storage; however, the virtual machines running in it will not have access to this storage other than via a virtual disk.All other new servers can be used.
单选题A customer has six Windows 2003 servers, three RedHat Linux servers, and three Netware servers. The current environment is direct attached storage. The customer needs a 2Gb Fibre solution that can scale up to 64 partitions over the next three years and provide connectivity to all three platforms. The customer also needs a fibre attached backup solution. Which of the following solutions has the best combination of price and performance?()AA DS4300 Turbo with Fibre Attached Tape LibraryBA DS4500 with EXP700’s and Fibre Attached Tape LibraryCA DS4500 with EXP710’s and Fibre Attached Tape LibraryDA DS4300 with Additional EXP710’s and a SCSI Attached Tape Library
单选题A customer has recently purchased some IBM x445 servers running Red Hat Enterprise AS 3 and wants to connect them to their existing EMC Clarion SAN controller. Which of the following steps must be taken in order to validate the solution?()ADownload the latest drivers from EMC for Red Hat Advanced Server.BEnsure that the EMC storage server is configured properly and has the latest firmware levels.CVerify the equipment is on the ServerProven list and complete a Solution Assurance Review (SAR).DEnsure that the systems are connected to the EMC SAN controller.