单选题During routine maintenance, it became necessary to shutdown G1/0/1 on DS1 and DS2. All other interface were up. During this time, DS1 became the active device for Vlan104’s HSRP group. As related to Vlan104’s HSRP group.  What can be done to make the group function properly ? ()A On DS1, disable preemptB On DS2, decrease the priority value to a value less than 150C On DS1, increase the decrement value in the track command to a value greater than 6D On DS1, disable track command.

单选题
During routine maintenance, it became necessary to shutdown G1/0/1 on DS1 and DS2. All other interface were up. During this time, DS1 became the active device for Vlan104’s HSRP group. As related to Vlan104’s HSRP group.  What can be done to make the group function properly ? ()
A

 On DS1, disable preempt

B

 On DS2, decrease the priority value to a value less than 150

C

 On DS1, increase the decrement value in the track command to a value greater than 6

D

 On DS1, disable track command.


参考解析

解析: 暂无解析

相关考题:

● Software maintenance is to do necessary modification,supplenemt,and completeness during software life circle.Among the following vary kinds of maintenance,which one has the maximum workload in a general way? (73) .(73) A.relevance maintenanceB.completeness maintenanceC.correctness naintenanceD.other kinds of maintenance

Which command should an administrator use to put a system in maintenance mode without rebooting?() A.init 0B.telinit mC.shutdown -FMD.sh /etc/rc.maint

Software maintenance is to do necessary modification, supplenemt, and completeness during software life circle. Among the following vary kinds of maintenance, which one has the maximum workload in a general way?(73).A.relevance maintenanceB.completeness maintenanceC.correctness naintenanceD.other kinds of maintenance

During the voyage he encountered boisterous winds and heavy weather during which time the vessel________ heavily and to such an extent that at times it was necessary to change course.A.movedB.laboredC.drivedD.went

Photojournalist Margaret became famous for her( )of significant events during the Second World War.A.collageB.usageC.camouflageD.coverage

During routine maintenance, G1/0/1 on DS1 was shutdown. All other interface were up. DS2 became the active HSRP device for Vlan101 as desired. However, after G1/0/1 on DS1 was reactivated. DS1 did not become the active HSRP device as desired.  What need to be done to make the group for Vlan101 function properly ? ()A、 Enable preempt on DS1’s Vlan101 HSRP groupB、 Disable preempt on DS1’s Vlan101 HSRP groupC、 Decrease DS1’s priority value for Vlan101 HSRP group to a value that is less than priority value configured on DS2’s HSRP group for Vlan101D、 Decrease the decrement in the track command for DS1’s Vlan 101 HSRP group to a value less than the value in the track command for DS2’s Vlan 101 HSRP group.

During routine maintenance, it became necessary to shutdown G1/0/1 on DS1 and DS2. All other interface were up. During this time, DS1 became the active device for Vlan104’s HSRP group. As related to Vlan104’s HSRP group.  What can be done to make the group function properly ? ()A、 On DS1, disable preemptB、 On DS2, decrease the priority value to a value less than 150C、 On DS1, increase the decrement value in the track command to a value greater than 6D、 On DS1, disable track command.

To troubleshoot interface problems, you can use both the disable command and the deactivate command. Which two statements are correct?()A、If the interface is disabled, the logical unit will administratively shutdown.B、If the interface is deactivated, the physical interface will administratively shutdown.C、If the interface is deactivated, the interface configuration is ignored during commit.D、If the interface is disabled, the logical unit configuration is ignored during commit.

维修冷停堆 maintenance cold shutdown

Which command should an administrator use to put a system in maintenance mode without rebooting?()  A、init 0B、telinit mC、shutdown -FMD、sh /etc/rc.maint

Which tasks are necessary to perform a data migration using DFSMS?()A、Microcode review and data classificationB、Initialization and data classificationC、Microcode review, ACS routine, and back up of dataD、Data classification, ACS routine, and back up of data

单选题During which condition should the operator of a pedestal crane shutdown operations?()ALightning in the vicinityBAn approaching squall lineCA fire on the pierDAll of the above

单选题During which condition should the operator of a pedestal crane shutdown operations?()ALightningBHigh windsCFire aboardDAll of the above

单选题During which condition should the operator of a pedestal crane shutdown operations?()ABunkeringBHigh windsCPotable water spill on deck

单选题During a routine maintenance visit to a client, an administrator noticed that the last full backup did not complete. Which of the following should the administrator do FIRST?()ASchedule and perform an incremental backup as soon as possible.BInspect backup report logs.CSchedule and perform a full backup as soon as possible.DInspect alert notification settings.

单选题What is an advantage of diesel over steam turbine propulsion? ()ALess fuel consumption per SHPBDiesel fuel costs less than bunker C or its equivalentCLess routine maintenance requiredDLess weight per SHP

单选题I hereby request permission to()the ship hull for routine maintenance.AoperateBrepairCoilDpaint

多选题To troubleshoot interface problems, you can use both the disable command and the deactivate command. Which two statements are correct?()AIf the interface is disabled, the logical unit will administratively shutdown.BIf the interface is deactivated, the physical interface will administratively shutdown.CIf the interface is deactivated, the interface configuration is ignored during commit.DIf the interface is disabled, the logical unit configuration is ignored during commit.

单选题Air compressors are equipped with unloading systems for the purpose of().Aremoving all but the frictional load during startingBrelieving intercoolers of high temperature buildupsCproviding high starting torque in the drive motorDseating valve plates during compressor shutdown

单选题I hereby request permission to()the ship hull for routine maintenance.Aput paint onBapply paint ontoCoilDpaint

单选题Routine maintenance of lead acid batteries should include ().Akeeping the terminals cleanBcoating cable connections with petroleum jellyCmaintaining a trickle chargeDAll of the above

单选题During the voyage he encountered boisterous winds and heavy weather during which time the vessel()heavily and to such an extent that at times it was necessary to change course.AmovedBlaboredCdroveDwent

单选题I()having your approval for the routine maintenance at your earliest convenience.Ahope toBwant toClook forward toDexpect to

单选题I hereby request permission()the ship’s main engine for routine maintenance.AimmobilizeBto immobilizeCimmobilizationDimmobilizing

单选题Routine maintenance on a Central Control Room hermetically sealed air conditioning unit should include ()Achanging the air filterBrecharging the systemCchanging compressor lubricantDrenewing container vacuum

单选题Which of the following actions should be taken if during a routine maintenance inspection of a centrifugal pump, localized scoring on a pump shaft sleeve is detected?()ACorrect the cause of the scoring and repair the sleeve or replace with a new oneBReassemble the unit and provide more water leak off for proper lubricationCCheck for parallel alignment of the sleeve radial faces to the sleeve boresDReassemble the unit and adjust the governor to obtain a slower speed

单选题Which of the routine maintenance procedure listed is required for starting air receivers?()AFrequent draining of accumulated moistureBFrequent testing of relief valvesCA close watch on temperature to prevent fluctuations in pressureDFrequent cleaning to re move oil and foreign matter

单选题Which of the routine maintenance procedures listed is required for starting air receivers?()Aover-speedingBoverloadClow exhaust temperatureDhigh crankcase pressure