单选题Before welding is permitted on a fuel tank, it must be certified or declared ()Asafe for becoming roundedBsafe for hot workCnot safe for personnelDnot safe for hot work

单选题
Before welding is permitted on a fuel tank, it must be certified or declared ()
A

safe for becoming rounded

B

safe for hot work

C

not safe for personnel

D

not safe for hot work


参考解析

解析: 暂无解析

相关考题:

Before entering a fuel tank that has been cleaned, it should be checked with an oxygen indicator and a/an ____.A.Orsat apparatusB.flame safety lampC.Halide torchD.combustible gas indicator

Before welding can be done in a tank that has previously carried petroleum products,a certificate must be obtained from ________ .A.the customsB.the Register Bureau of shippingC.the shipyard fire departmentD.a certified gas chemist

Prior to burning or welding on a fuel tank on a ship,regulations require that an inspection be made. An entry in the unofficial logbook is required if this inspection is made by ______.A.a marine chemistB.the Officer in Charge,Marine InspectionC.the Master or person in charge of the shipD.the National Fire Protection Association

Before welding can be done in a tank that has carried petroleum products,a certificate must be obtained from ______.A.the customsB.the Register Bureau of shippingC.the shipyard fire departmentD.a certified gas chemist

Before welding in a tank that has carried petroleum products,the tank must be certified by ______.A.the Coast GuardB.the ABSC.the shipyard fire departmentD.a certified marine chemist

Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure?A.Tearing through the member is more likely in this type connectionB.The weld may be broken by the stresses caused by rivetingC.The weld increases the tensile stress on the rivet headsD.The welding must be completed before the riveting commences

You are carrying triethylamine,methyl methacrylate and isoprene in your multiple-product tanker. Which of the following statements is true?A.Isoprene may be carried in a cargo tank adjacent to either of the other two cargoesB.Methyl methacrylate may not be carried in a tank adjacent to a pump roomC.Methyl methacrylate must usually be heated to maintain its stabilityD.Portable thermometers are not permitted to be used to take the cargo temperature of triethylamine

By regulation,cargo tank atmosphere must be inert before and during which operation ________.A.StrippingB.LoadingC.CleaningD.All of the above

What is NOT a requirement for the preparation of used,gasoline-propelled cars if they are to be carried as ordinary cargo and not as hazardous cargo ________.A.The engine must be run until it dies from lack of fuelB.The fuel tank must be inerted with CO2C.The ignition key may not be in the ignitionD.The vehicle must be inspected for fuel leaks

Which statement about entering into a tank which has been sealed for a long time is TRUE ________.A.The tank should be tested only once to ensure the oxygen content is at least 14% before entryB.The tank must be tested at frequent intervals to ensure that hazardous gasses have not regeneratedC.The tank need not be tested for oxygen content if it is ventilated for more than 24 hoursD.If the oxygen content tests at less than 12% you should wear an approved gas mask

Gasoline fuel tank vents should terminate ______.A.In the engine compartmentB.In the fuel tank spaceC.Above or outside the hullD.At the most convenient location

You are planning to use the crude oil washing system on your tanker.What is required to prevent electrostatic buildup in the tanks ________.A.The portable machines should be set at the proper drop for the first wash before the fixed machines are usedB.The tank used as the source for the tank cleaning machines should be debottomed for at least one meterC.The inert gas system must reduce the oxygen content in the tank to at least 18%D.The fixed machines must be operated simultaneously with the portable machines to equalize the electrostatic potential

Fuel tank capacity油箱容积

单选题If the overflow tank high-level alarm sounds while the fuel oil tanks are being topped off, the engineer should ().Aclose the static leg filling valveBclose the overflow tank falling valveCreduce the fuel oil pumping rateDstop the fuel oil pumping operation

单选题Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()ATearing through the member is more likely in this type connectionBThe weld may be broken by the stresses caused by rivetingCThe weld increases the tensile stress on the rivet headsDThe welding must be completed before the riveting commences

单选题Before being used the fuel service tank should be drained of ().Asoda solutionBmechanical impuritiesCballastDwater and residuals

单选题How must each storage tank for helicopter fuel on a ship be marked?()ADANGER - KEEP AWAYBDANGER - EXPLOSIVE VAPORSCDANGER - NO SMOKINGDDANGER - FLAMMABLE LIQUID

单选题Your vessel has run aground and upon taking fuel oil tank soundings, you find that a fuel tank level has increasedYou therefore should suspect ().Acondensation in the fuel tankBa crack in the hull portion of the fuel tankCa load of bad fuelDcontamination from the saltwater flushing system

单选题You are carrying triethylamine,methyl methacrylate and isoprene in your multiple-product tanker. Which of the following statements is true? ()AIsoprene may be carried in a cargo tank adjacent to either of the other two cargoesBMethyl methacrylate may not be carried in a tank adjacent to a pump roomCMethyl methacrylate must usually be heated to maintain its stabilityDPortable thermometers are not permitted to be used to take the cargo temperature of triethylamine

单选题Before welding is permitted on a fuel tank, it must be certified or declared ()Asafe for becoming roundedBsafe for hot workCnot safe for personnelDnot safe for hot work

单选题Before a tank is to be crude oil washed,the oxygen content in the tank must be measured at a position().Aimmediately above the level of the oilBat the top of the tankCin the vent riserDone meter from the deck

单选题The fuel from the bunker tanks must be treated by before entering the service tanks(), from where the fuel enters()Acentrifugal separators; the engine cylinderBoily water separators; the engine cylinderCoily water separators; the fuel supply systemDcentrifuges; the fuel supply system

单选题By regulation,cargo tank atmosphere must be inert before and during which operation?()AStrippingBLoadingCCleaningDAll of the above

单选题What action must be taken when an individual cargo tank is closed off from the inert gas system by the tank isolation valve?()AThe tank must be gas freedBThe tank must be ballastedCThe tank must be vented to the atmosphereDThe bypass valve must also be closed

单选题If emergency welding repairs must be made to the upper area of a fuel tank, the tank and/or adjacent compartments may need to be ()Agas freedBinertedCfilled with waterDall of the above as necessary

单选题Before entering a fuel tank that has been cleaned, it should be checked with an oxygen indicator and a/an().AOrsat apparatusBflame safety lampCHalide torchDcombustible gas indicator

单选题Following a grounding, you can best determine that a SLACK fuel oil tank has been holed by ().Asounding the tankBwaiting for the vessel to listCexamining tank boundariesDchecking fuel oil strainers

单选题Gasoline fuel tank vents should terminate().Ain the engine compartmentBin the fuel tank spaceCabove or outside the hullDat the most convenient location