单选题You must sign to accept the terms and conditions as the application will only be processed with the applicant’s signature.A您必须先阅读有关条款才能签名,因为申请表必须经过申请人签名才能办理。B您必须签名以示接受这些条款,因为申请表必须附有申请人的签名方可受理。C您必须在收到所列条款之后才能签名,因为申请表只有经申请人签署才生效。

单选题
You must sign to accept the terms and conditions as the application will only be processed with the applicant’s signature.
A

您必须先阅读有关条款才能签名,因为申请表必须经过申请人签名才能办理。

B

您必须签名以示接受这些条款,因为申请表必须附有申请人的签名方可受理。

C

您必须在收到所列条款之后才能签名,因为申请表只有经申请人签署才生效。


参考解析

解析:
A项把sign to accept理解成了前后相继的关系;将accept误译为“阅读”。C项也将sign to accept这两个动作的关系理解成了前后相继的关系;将accept误译为“收到”;还将be processed“受理”误译为“生效”。

相关考题:

I just received a proposal________ A.that you have finalized the delivery dates.B.to be more flexible over terms of payment.C.that is made with certain conditions.D.that could benefit both of us.

The seller was trying to sign a substantial order________ A.that is made with certain conditions.B.that you have finalized the delivery dates.C.then he could get a large discount.D.to be more flexible over terms of payment.

We confirm our sale of the following commodities()terms and conditions()set forth below. A、in⋯thatB、on⋯whichC、for⋯asD、on⋯as

You are requested to send us ______ to authenticate the cable L/C issued by your bank in the future.A.your specimen signatures bookB.your telegraphic test keyC.your tariffsD.your terms and conditions

You receive a remote assistance request. It expires before you are able to accept it. You need to increase the amount of time you have to accept remote assistance requests.What should you do?() A.AB.BC.CD.D

management includes negotiating the terms and conditions in contracts and ensuring compliance with the terms and conditions,as well as documenting and agreeing on any changes or amendments that may arise during its implementation or executionA.ContractB.DocumentC.CommunicationD.Risk

A vessel loads 5000 tons of manganese ore. The railroad cars that brought the ore to the vessel were previously loaded with iron ore so the ore is contaminated. The agent requests the Master to sign a Clean Bill of Lading and in return the shipper willA.Sign a Clean Bill of Lading and accept the Letter of IndemnityB.Refuse to sign a Clean Bill of LadingC.Sign the Clean Bill of Lading and have the agent countersign itD.Sign a Clean Bill of lading under protest

You are making tow.A loaded,open-hopper barge with independent tanks has placards,with alternating red and white quadrants,located at each side and end.You inspect the barge and find slight traces of water in the wing voids due to condensation.What should you do?A.Refuse to accept the barge until all wing voids are dryB.Accept the barge and when weather conditions permit run with the wing voids open to ventilate the spacesC.Accept the barge and periodically check the wing voidsD.Return the barge to the fleet and depart without the barge

( ) management includes negotiating the terms and conditions in contracts and ensuring compliance with. the terms and conditions, as well as documenting and agreeing on any changes or amendments that may arise during its implementation or execution. A.Contract B.Document C.CommunicationD.Risk

Suppose you are invited by Professor Williams to give a presentation about Chinese culture to a group of international students.Write a reply to Accept the invitation,and Introduce the key points of your presentation.You should write neatly on the ANWSER SHEET.Do not sign you own name at the end of the letter,use"Li Ming”instead.Do not write the address.

Under the terms of the contract,you must give 3 months' notice before you leave.A: subjectsB: expressionsC: wordsD: rules

The Client has requested that once Terms and Conditions (Ts Cs) are attached to another record, the Ts Cs should be unchangeable. How is this appropriately accomplished?()A、 In the Contracts application, delete the Ts Cs from the record and enter a new row.B、 In the application using the specific Ts Cs, rename the Ts Cs and approve the record.C、 In the Terms and Conditions Application, uncheck the Editable box on the newly created term.D、 In the Terms and Conditions Application, change the status of the newly created term to Approved.

The buyer himself must sign the Purchase Confirmation on the spot—(翻译)()。

We have made()that we would accept D/P terms for your present order.A、clearB、it is clearC、that clearD、it clear

We will consider()your terms of payment.A、acceptedB、to acceptC、acceptingD、accept

We regret()to accept your terms of payment and therefore have to return the order to you.A、cannotB、being unableC、not ableD、not be able

Please be aware that if you do not accept these terms you will not be allowed to take thisCompTIA exam and you will forfeit the fee paid.()A、RETURN TO EXAMB、EXIT EXAM

There are multiple network interfaces on a server. Which parameters must you set in smb.conf to limit on which interfaces Samba will accept connections? ()A、 listen interfaces  B、 bind interfaces only  C、 interfaces  D、 listen address

单选题We regret()to accept your terms of payment and therefore have to return the order to you.AcannotBbeing unableCnot ableDnot be able

单选题When you adjust a thermostatic expansion valve, ().Arefrigerant must be bled off the sensing line before adjustments are madeBall refrigerant must be pumped into the receiver before adjustments are madeCtime must be allowed for conditions to stabilize in the evaporator before further adjustments are madeDall refrigerant must be routed through the dehydrator while changing the superheat setting

单选题You completed your Java procedure for your external Java function activity, and you now want todeploy this to your server. What would you do to deploy the Java procedure?()Atake the Java sources (.java) files and include them in your $APPL_TOPBtake the Java sources (.java) files and include them in your CLASSPATHCtake the Java classes (.class) files and include them in your $APPL_TOPDtake the Java classes (.class) files and include them in your CLASSPATH

多选题There are multiple network interfaces on a server. Which parameters must you set in smb.conf to limit on which interfaces Samba will accept connections? ()Alisten interfacesBbind interfaces onlyCinterfacesDlisten address

单选题Please be aware that if you do not accept these terms you will not be allowed to take thisCompTIA exam and you will forfeit the fee paid.()ARETURN TO EXAMBEXIT EXAM

问答题Directions:  You are planning to study abroad. Write a letter of inquiry to  (1) give your brief personal information;  (2) ask for the terms of admission into that university;  (3) ask for the possibility of getting a scholarship.  You should write about 100 words. Do not sign your own name at the end of the letter. Use Li Ming instead. You don't need to write the address.

单选题Delivery man: I have a package here for Beverly Beaver. Beverly: That is me. ______ Delivery man: Yes, please sign here on the line. Beverly: Thank you. These must be the new drapes I ordered.AWhere is the receipt?BDo you have the sender’s address?CDo you take a credit card?DDo I have to sign for it?

单选题At the places where you see Sign 1, ______.Ayou are already out of a townByou still have thirty kilometers to goCthere must be many houses and buildings not far awayDthere must be a town thirty k8ilometers away

单选题The maneuvering information required to be posted in the wheelhouse must be based on certain conditions.Which of the following is NOT one of these conditions()AThe hull must be cleanBThere must be calm weather – wind 10 knots or less and a calm seaCThere must be no currentsDThe depth of the water must be at least one and one-half times the draft

单选题You must sign to accept the terms and conditions as the application will only be processed with the applicant’s signature.A您必须先阅读有关条款才能签名,因为申请表必须经过申请人签名才能办理。B您必须签名以示接受这些条款,因为申请表必须附有申请人的签名方可受理。C您必须在收到所列条款之后才能签名,因为申请表只有经申请人签署才生效。