单选题Before beginning a telecommuting arrangement,the management should _____.Aappoint a new HR specialistBprovide the facilities and conditionsCimprove the company’s productivity firstDdecide whether it is suitable for the company
单选题
Before beginning a telecommuting arrangement,the management should _____.
A
appoint a new HR specialist
B
provide the facilities and conditions
C
improve the company’s productivity first
D
decide whether it is suitable for the company
参考解析
解析:
细节题。由文章倒数第二段“there are decisions to make and actions to take before you begin a telecommuting arrangement”可知,在采用远程办公之前,领导应该做一些决定采取一些行动来看看自己的公司是否适合采用这种方式。本段开头也指出“But is it for you?”,说明并不是所有的公司都适合这种方式的。D是对这句话的同义转述,为正确答案。A项偷换概念,文中是提到了人力资源,但是一直是存在的而不是新任命的。B项无中生有,没有根据。C项偷换概念,提高生产力只是远程办公的结果而不是之前的决策依据。
细节题。由文章倒数第二段“there are decisions to make and actions to take before you begin a telecommuting arrangement”可知,在采用远程办公之前,领导应该做一些决定采取一些行动来看看自己的公司是否适合采用这种方式。本段开头也指出“But is it for you?”,说明并不是所有的公司都适合这种方式的。D是对这句话的同义转述,为正确答案。A项偷换概念,文中是提到了人力资源,但是一直是存在的而不是新任命的。B项无中生有,没有根据。C项偷换概念,提高生产力只是远程办公的结果而不是之前的决策依据。
相关考题:
●In C program,all variables must be (70) before use,usually at the beginning of the function before any (71) statements.(70) A.statedB.writedC.illustratedD.declared(71) A.operateB.activeC.executableD.processing
Project management has been proven to be successful because employees get to see the entire effort, from beginning to end, rather than just small pieces. This could be considered an example of:A Behavioral modificationB Linking performance to payC Positive job reinforcementD Job enrichmentE All of the above
137 Project management has been proven to be successful because employees get to see the entire effort, from beginning to end, rather than just small pieces. This could be considered an example of: A. Behavioral modificationB. Linking performance to payC. Positive job reinforcementD. Job enrichmentE. All of the above
Which two statements about workload capture and replay operations are true?() A. The clients must be created manually on the test machines to perform more realistic testing.B. Restart the database in RESTRICTED mode before beginning workload replay to enable a clean state for workload replay.C. Restart the database in RESTRICTED mode before beginning workload capture to enable a clean state for capturing the workload.D. The application state of the capture system must be identical to the application state of the replay system when the workload replay begins.
Which are the two prerequisites before setting up Flashback Data Archive? ()(Choose two.) A. Flash recovery area must be definedB. Undo retention guarantee must be enabled.C. Database must be running in archivelog mode.D. Automatic undo management must be enabled.E. The tablespace in which the Flashback Data Archive is created must have automatic segment space Management (ASSM).
In C program, all variables must be(70)before use, usually at the beginning of the function before any(71)statements.A.statedB.writedC.illustratedD.declared
The carrier shall be bound before and at the beginning of the voyage to exercise due diligence to ______.A.make the ship seaworthyB.prepare the cargo properly for the carriageC.clean the holds before discharging the goods and/or after loading the goodsD.train crew members in accordance with all regulations concerned
All removals to be reassembled in order ______ of repairs.A.upon commencementB.on completionC.before endingD.after beginning
The vacuum tube,invented near the beginning of our century,gave us the use of radio waves,an energy source never before( ),and later opened the road for television.A.was capturedB.capturedC.capturingD.has been captured
What should management do before accepting outside funding?A.Conduct an in-depth review of the proposalB.Grant seats on the board to the investorC.Discuss the deal with customersD.Consider the reputation of the investor
A project is a[temporary](请作答此空)of unique,complex,and connected activities having one goal or purpose and that must be completed by a specific time,within budget,and according to( ).Project management is the process of scoping,planning,staffing,organizing,directing,and controlling the development of a(n)( )system at a minimum cost within a specified time frame.For any systems development project,effective project management is necessary to ensure that the project meets the( ),is developed within an acceptable budget,and fulfills customer expectations and specifications,Project management is a process that starts at the beginning of a project,extends through a project,and doesn't culminate until the project is completed.The prerequisite for good project management is a well-defined system development process.Process management is an ongoing activity that documents,manages the use of,and improves an organization s chosen methodology(the“process”)for system development,Process management is concerned with the activities,deliverables,and quality standards to be applied to( )project(s).A.taskB.workC.sequenceD.activity
What are two characteristics of "store and forward" switching?()A、Latency fluctuates regardless of frame size.B、The switch receives the complete frame before beginning to forward it.C、Latency through the switch varies with frame length.D、The switch checks the destination address upon receipt of headers.
The administrator of an AIX system needs to be more proactive and predictive at identifying and resolving problems before they affect the system. Which of the following options should the pSeries Sales Representative propose to address this management issue?()A、HACMPB、PM/AIXC、SmoothStartD、Business Continuity Services
Because of a power outage, instance failure has occurred. From what point in the redo log does recovery begin and where does it end?()A、current redo log and inactive redo logB、checkpoint position to end of redo logC、beginning of redo log to end of redo logD、all redo logs before the point of last commitE、beginning of redo log to checkpoint position
单选题Which of the following statements is TRUE of telecommuting?AIt is up to the employees to accept it or not.BIt is getting popular in different companies.CIt is a new untested way of working.DIt is a traditional work arrangement.
单选题When the renewal verification is completed more than three months before the expiry date of the existing Document of Compliance or Safety Management Certificate, the new Document of Compliance or the new Safety Management Certificate should be valid from the date of () for a period not exceeding five years.AbeginningoftherenewalverificationBcompletionoftherenewalverificationCbeginningofscheduleddrydockingDcompletionofscheduleddrydocking
多选题Which of these recommendations should be followed before capturing a workload?()AMake sure your replay database has the same structure as the capture database, except without data.BMake sure the replay and capture databases are similar in data content.CPerform a clean shutdown and restart of the capture database before beginning a workload capture.DStart the capture database in UNRESTRICTED mode, then start the capture.EDefine inclusion and exclusion filters.
单选题Which of the following statements represents the FIRST precaution to be taken prior to working on any installed electrical component ()AWear rubber gloves and bootsBUse only approved non-conducting toolsCGround the case of the machine before beginning any repairsDOpen the supply circuits and tag the switches
单选题The carrier has,before and at the beginning of the voyage,to()due diligence to make the ship seaworthy.ApayBexportCimportDexercise
多选题Which are the two prerequisites before setting up Flashback Data Archive? ()(Choose two.)AFlash recovery area must be definedBUndo retention guarantee must be enabled.CDatabase must be running in archivelog mode.DAutomatic undo management must be enabled.EThe tablespace in which the Flashback Data Archive is created must have automatic segment space Management (ASSM).
单选题A network technician arrives to work and discovers users are having a problem connecting the company server. The server operator was working on upgrades the night before. Which of the following documents should the technician use to attempt to discover the problem?()ANetwork mapsBChange managementCBaselinesDCable management
多选题Which two statements about workload capture and replay operations are true?()AThe clients must be created manually on the test machines to perform more realistic testing.BRestart the database in RESTRICTED mode before beginning workload replay to enable a clean state for workload replay.CRestart the database in RESTRICTED mode before beginning workload capture to enable a clean state for capturing the workload.DThe application state of the capture system must be identical to the application state of the replay system when the workload replay begins.
多选题What are two characteristics of "store and forward" switching?()ALatency fluctuates regardless of frame size.BThe switch receives the complete frame before beginning to forward it.CLatency through the switch varies with frame length.DThe switch checks the destination address upon receipt of headers.
问答题Telecommuting workers soon learn that it is almost impossible to concentrate on work and care for a young child at the same time.