Acceptance of deliverables to multiple locations requires which type of sign off?()A、Design AcceptanceB、Code AcceptanceC、Module AcceptanceD、Site Acceptance

Acceptance of deliverables to multiple locations requires which type of sign off?()

  • A、Design Acceptance
  • B、Code Acceptance
  • C、Module Acceptance
  • D、Site Acceptance

相关考题:

In acceptance sampling, if the sample size is kept the same but the acceptance number is increased, which of the following will be true:A . buyer's risk will decreaseB . vendor's risk will decreaseC . producer's risk will decreaseD . consumer's risk will increaseE . C and D only

is the process of obtaining the stakeholdrs'formal acceptance of the completed project scope. Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.A.WBS CreationB.Scope definitionC.Project acceptanceD.Scope verification

is the process of obtaining the stakeholders' formal acceptance of the completed project scope. Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.A.Project acceptanceB.Scope verificationC.Scope definitionD.WBS Creation

听力原文:A cheque is never accepted by the bank on which it is drawn. Hence, the rules relating to acceptance of bills do not apply to cheques.(9)A.A cheque can be accepted by the bank on which it is drawn.B.A bill can not be accepted by the bank on which it is drawn.C.The rules relating to acceptance of bills are not applicable to cheques.D.The rules relating to acceptance of bills are applicable to cheques.

()is the process of formalizing acceptance of the completed project deliverables. The key benefit of this process is that it brings objectivity to the acceptance process and increases the probability of final product, service,or result acceptance by validating each deliverable。A、Validate scopeB、Define scopeC、Control scopeD、Collect requirement

the () is primarily concerned with acceptance of the deliverables.while quality control is primarily concerned with correctness of the deliverables and meeting the quality requirements specified for the deliverablesA.verify scopeB.define scopeC.quality assuranceD.validate scope

( )must be between on-line deployment and final acceptance.A.Detailed design B.Test runC.Internal testing D.Contract signing

As each application module is completed, it undergoes ()to ensure that it operates correctly and reliably.A.unit testingB.integration testingC.system testingD.acceptance testing

() is the process of obtaining the stakeholders\' formal acceptance of thecompleted project scope. Verifying the scope includes reviewing deliverables and work results toensure that all were completed satisfactorily. A.Project acceptance B.Scope verification C.Scope definition D.WBS Creation

The()process differs from the()process in that the former is primarily concerned with acceptance of the deliverables,while the latter is primarily concerned with acceptance of the deliverables,while the latter is primarily concerned with correctness of the deliverables.A.perform Quality AssuranceB.Validate ScopeC.Control QualityD.Define Scope

the ( ) is primarily concerned with acceptance of the deliverables.while quality control is primarily concerned with correctness of the deliverables and meeting the quality requirements specified for the deliverables. A.verify scope B.define scope C.quality assurance D.validate scope

In which phase is a systems acceptance test plan developed and documented? ()A、ImplementB、DesignC、PrepareD、Operate

In which of these phases is a set of acceptance tests developed and documented?()A、implementB、designC、prepareD、operate

Which two service components are performed during the wireless implement phase?()A、project planningB、configuration managementC、wireless readiness assessmentD、systems acceptance testingE、site readiness specification

The project()is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements,thresholds, and acceptance criteria.A、work performance informationB、scope statementC、changerequestsD、process analysis

() is the process of obtaining the stakeholders' formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.A、projectacceptanceB、scopeverificationC、scopedefinitionD、WBS Creation

Which design phase service component includes the development and documentation of the test case or cases used to verify that a deployed infrastructure meets operational, functional, and interface requirements? Select exactly 1 answer(s) from the following:()。A、Implementation PlanB、Business PlanC、Staging PlanD、Detailed Design DevelopmentE、Systems Acceptance Test Plan Development

Which design phase service component consists of developing a detailed, site-specific plan for implementing a new technology system or solution? Select exactly 1 answer(s) from the following:()。A、Detailed Design DevelopmentB、Systems Acceptance Test Plan DevelopmentC、Staging PlanD、Implementation Plan DevelopmentE、Project Kick-off

Which three of these service components are in the design phase?()A、Account Qualification and PlanningB、Detailed Design DevelopmentC、Staff TrainingD、Systems Acceptance Test Plan DevelopmentE、Staging Plan DevelopmentF、Site Readiness Assessment

Which service component in the design phase describes developing a detailed, site-specific plan for implementing the new technology system or solution()A、Implementation Plan DevelopmentB、Detailed Design DevelopmentC、Systems Acceptance Test Plan DevelopmentD、Staging Plan Development

Which of these is an accurate list of Cisco Lifecycle Services phases? Select exactly 1 answer(s) from the following:()。A、initiation planning analysis design development implementation operations and maintenanceB、project planning, site assessment risk assessment solution selection and acquisition, testing, and operationsC、prepare, plan, design, implement operate, and optimizeD、analysis, design, deployment testing, implementation, and productionE、presales, project planning, development implementation, operations testing, and operations sign- off

()is the process of obtaining the stakeholders’ formal acceptance of the completed project scope.Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.A、Project acceptanceB、Scope verificationC、Scope definitionD、WBS Creation

单选题Acceptance of deliverables to multiple locations requires which type of sign off?()ADesign AcceptanceBCode AcceptanceCModule AcceptanceDSite Acceptance

多选题Which three of these service components are in the design phase?()AAccount Qualification and PlanningBDetailed Design DevelopmentCStaff TrainingDSystems Acceptance Test Plan DevelopmentEStaging Plan DevelopmentFSite Readiness Assessment

单选题Which WAN connection requires a different interface than the standard interface provided in the Cisco Single-Site Secure Network Foundation deployment design?()AMetro EthernetBDSLCVPNDCableEFrame-Relay

单选题()is the process of obtaining the stakeholders’ formal acceptance of the completed project scope.Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.AProject acceptanceBScope verificationCScope definitionDWBS Creation

单选题Which of these is an accurate list of Cisco Lifecycle Services phases? Select exactly 1 answer(s) from the following:()。Ainitiation planning analysis design development implementation operations and maintenanceBproject planning, site assessment risk assessment solution selection and acquisition, testing, and operationsCprepare, plan, design, implement operate, and optimizeDanalysis, design, deployment testing, implementation, and productionEpresales, project planning, development implementation, operations testing, and operations sign- off