单选题To prevent loss of stability from free communication flooding you should().Aclose the cross-connection valve between the off-center tanksBcompletely flood high center tanksCballast double bottom wing tanksDclose any opening to the sea in an off-center tank

单选题
To prevent loss of stability from free communication flooding you should().
A

close the cross-connection valve between the off-center tanks

B

completely flood high center tanks

C

ballast double bottom wing tanks

D

close any opening to the sea in an off-center tank


参考解析

解析: 暂无解析

相关考题:

An informal communication network on a project and within an organization is called a(n):A free upward flowB free horizontal flowC unrestricted communication flowD grapevineE open network

4 An informal communication network on a project and within an organization is called a(n):A. free upward flowB. free horizontal flowC. unrestricted communication flowD. grapevineE. open network

What can we infer from the passage?A.The Basle Committee's core principles require the minimum capital adequacy requirements.B.The Basle Committee encourages banks to operate with capital of the minimum.C.The Basle Committee helps bank supervisors to reduce the risk of loss.D.The Basle Committee ensures banks to pursue the stability of the banking industry.

Serious loss of reserve buoyancy resulting from flooding any compartment of a ship will always ______.A.increase the trimB.change the free surface effectC.cause a serious listD.decrease ship stability

Before doing any work on a hydraulic system equipped with accumulators, you shouldA.drain the accumulators and purge with oxygenB.bleed off all stored energy from the accumulators completelyC.charge the accumulators to prevent system energy lossD.pump the hydraulic fluid into the accumulators to prevent fluid loss

The boom stops are installed on an offshore crane to ______.A.prevent the boom from being raised too highB.prevent the boom from swingingC.support the boom when not in useD.prevent the boom from being lowered

Free communication will adversely affect transverse stability only when the flooded space is ______.A.off-centerB.on the centerlineC.completely floodedD.open to the sea above and below the waterline

When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.A.Provide the proper trimB.Prevent negative stability from developingC.Prevent excessive longitudinal stressesD.Control list

What is the goal of QoS in a network? ()A、prevent packets from being droppedB、increase available bandwidthC、reduce hardware errorsD、provide predictable network serviceE、eliminate propagation delayF、eliminate jitter and packet loss

How is RPF used in multicast routing?()A、to prevent multicast packets from loopingB、to prevent PIM packets from loopingC、to instruct PIM where to send a (*, G) or (S, G) join messageD、to prevent multicast packets from looping and to instruct PIM where to send a (*, G) or (S, G) joinmessage

You have a server that runs Windows Server 2008. You need to prevent the server from establishing communication sessions to other computers by using TCP port 25. What should you do()A、 From Windows Firewall, add an exceptionB、 From windows Firewall enable the block all incoming connections optionC、 From the Windows Firewall with Advanced Security snap-in, create an inbound ruleD、 From the Windows Firewall with Advanced Security snap-in, create an outbound rule.

You have a server that runs windows server 2008. You need to prevent the server from establishing communication sessions to other computers by using TCP port 25. What should you do?()A、From windows firewall, add an exception.B、From windows firewall enable the block all incoming connections option.C、From the windows firewall with advanced security snap-in, create an inbound rule.D、From the windows firewall with advanced security snap-in, create an outbound rule.

单选题Your vessel was damaged and initially assumed a significant list and trim; however,further increase has been slow. Based on this data,what should you expect?()AThe slowing is only temporary and the vessel will probably suddenly capsize or plunge from loss of stability due to change in the waterplane areaBThe vessel can probably be saved if further flooding can be stoppedCThe vessel will continue to slowly list and/or trim due to the free surface effect and free communication effectDThe vessel will suddenly flop to the same or greater angle of list on the other side and may capsize

单选题Your vessel is damaged with no list,but down by the stern. There is progressive flooding and trim by the stern is increasing. What is the effect on transverse stability after the deck edge at the stern is submerged?()AKB increases,increasing BM and therefore GMBKG increases due to the weight of the added water on deckCBM decreases from loss of water plane and greater volumeDThere is no effect on transverse stability

单选题What is the stability term for the distance from the center of gravity (G) to the Metacenter (M),when small-angle stability applies? ()Ametacentric heightBmetacentric radiusCheight of the metacenterDrighting arm

单选题Before doing any work on a hydraulic system equipped with accumulators, you should()Adrain the accumulators and purge with oxygenBbleed off all stored energy from the accumulators completelyCcharge the accumulators to prevent system energy lossDpump the hydraulic fluid into the accumulators to prevent fluid loss

单选题In this passage, the author mainly tells us that _____.Aeveryone can be forgetful sometimes regardless of one’s ageBwe can prevent our sound mind from aging with certain methodsCbrain aging starts from the time when we are in our 20s and 30sDmemory loss is a sign that shows we are getting old

单选题Free communication will adversely affect transverse stability only when the flooded space is ().Aoff-centerBon the centerlineCcompletely floodedDopen to the sea above and below the waterline

单选题How does weighted random early detection (WRED) prevent packet loss?()Aincreases link capacityBincreases buffer space to accommodate bursts of traffic from delay-sensitive applicationsCprovides prioritized forwarding for drop-sensitive applicationsDdrop lower priority packets before congestion occursEseparates traffic into as many as 64 queues that can be uniquely prioritized

单选题You have a server that runs Windows Server 2008. You need to prevent the server from establishing communication sessions to other computers by using TCP port 25. What should you do()A From Windows Firewall, add an exceptionB From windows Firewall enable the block all incoming connections optionC From the Windows Firewall with Advanced Security snap-in, create an inbound ruleD From the Windows Firewall with Advanced Security snap-in, create an outbound rule.

单选题A wooden plug fitted tightly in the vent of a damaged tank may prevent the tank from().Afilling completelyBdeveloping free surfaceCdeveloping free surface momentDcollapsing

单选题What is the principal danger from the liquid in a half full tank onboard a vessel?()ACorrosion from the shifting liquidBRupturing of bulkheads from the shifting liquidCLoss of stability from free surface effectDHoling of the tank bottom from the weight of the shifting liquid

单选题The effects of free surface on initial stability depend upon the dimensions of the surface of the free liquids and the().Avolume of liquid in the tankBvolume of displacement of the vesselClocation of the tank in the vesselDheight of the center of gravity of the vessel

填空题One of the purposes of reforestation projects is to protect the habitat and prevent species loss.____

单选题The object of the both-to-blame collision clause is().Ato free the carrying ship from liabilityBto free the non-carrying ship from liabilityCto free the ship in the wrong from liabilityDto free the ship not to blame from liability

单选题A serious loss of reserve buoyancy resulting from flooding any compartment of a ship will always().Aincrease the trimBchange the free surface effectCcause a serious listDdecrea e ship stabilty

单选题A serious loss of reserve buoyancy resulting from flooding any compartment of a ship will always().Aincrease the trimBchange the free surface effectCcause a serious listDdecrease ship stability