单选题Boilers and cylinders are().Araw metallic productsBfinished metallic productsCconsumable productsDManufactured goods of large Size

单选题
Boilers and cylinders are().
A

raw metallic products

B

finished metallic products

C

consumable products

D

Manufactured goods of large Size


参考解析

解析: 暂无解析

相关考题:

●The smallest physical units on a hard disk are called (72) .(72) A.TracksB.ClustersC.SectorsD.Cylinders

The smallest physical units on a hard disk are called(69)A.TracksB.ClustersC.SectorsD.Cylinders

With reference to a two-ram actuating mechanism, which one of the following statement is FALSE?A.The rams work inside cylinders.B.The cylinders have glands sealing their open ends.C.The rams are connected to a cross-headD.The cross-head is mounted on the rudder stock

单选题Vee-type engines have the connecting rods from two cylinders connected to each () of the crankshaft.AthrowBwebCmain bearingDdeflection

单选题CO2 cylinders equipped with pressure actuated discharge heads will discharge automatically when().Athe discharge valve is openBthe control box glass is brokenCpressure from the control cylinders is detectedDthe control cylinders have been completely discharged

单选题The air supplied to the cylinders by a turbocharger is often reduced in volume by a/an ()Aair compressorBdiffuserCafter-coolerDventilator

单选题Which of the following statements concerning fire-tube boilers is correct?()ACombustion gases flow through the tubesBFlames impinge on the tubesCCombustion occurs in the tubesDWater flows through the tubes

单选题Cylinders of marine diesel engines are normally cooled by ().Asea waterBfine mineral oilCsanitary waterDfresh water

单选题It is often necessary to put an engine into () service with one or more cylinders cut out, or with a turbocharger secured.AadditionalBpermanentCtemporaryDlong

单选题You are loading a cargo that includes cylinders of acetylene aboard your break bulk vessel. Which statement is true? ()AThe cylinders must be stowed at least 10 horizontal feet from corrosive materials in the same spaceBStowage in the upper deck-deck is considered to be the equivalent of on deck stowage for this cargoCThe cylinders must have a red label for flammability and a green label for compressed gasDThe cylinders may be protected from the radiant heat of the Sun by laying a tarp on them

单选题The procedures recommended for auxiliary boilers having high salinity include ().Atreating with oxygen scavengersBsecuring the boiler and giving it a blowing downCincreasing the pHDreducing the phosphate level

单选题Diesel engines are started by supplying () into the cylinders in the appropriate sequence for the required direction.Acooling waterBcompressing airCcompressed airDcylinder oil

单选题Auxiliary boilers can be classified as()Awater-tube natural circulation boilersBfire-tube boilersCwater-tube forced circulation boilersDall of the above

单选题Cracks in the cylinders and cylinder covers may () unequal heating.Aresult fromBresult inCgive outDgiven from

单选题Who is in charge of the auxiliary boilers?()AThe chief engineerBThe second engineerCThe third engineerDThe fourth engineer

单选题Some diesel engines are fitted with a thermometer in the cooling water outlet from each cylinderIf the cooling water temperature from all cylinders begins to rise above normal, you should suspect ()Aincrease blow-by in all cylindersBincomplete combustion in all cylinderCoverloading in all cylindersDinsufficient fuel delivery to all cylinders