单选题ABC Corp. is installing 11i Oracle Applications on two nodes A and B. On Node A, it hasinstalled the Forms server, Web server, and Administration server. On Node B, it has installed theConcurrent Processing server. By default, on which node would the Reports server be installed?()ANode ABNode BCneither of the nodesDboth Node A and Node B
单选题
ABC Corp. is installing 11i Oracle Applications on two nodes A and B. On Node A, it hasinstalled the Forms server, Web server, and Administration server. On Node B, it has installed theConcurrent Processing server. By default, on which node would the Reports server be installed?()
A
Node A
B
Node B
C
neither of the nodes
D
both Node A and Node B
参考解析
解析:
暂无解析
相关考题:
ABC Corp. is installing 11i Oracle Applications on two nodes A and B. On Node A, it hasinstalled the Forms server, Web server, and Administration server. On Node B, it has installed theConcurrent Processing server.By default, on which node would the Reports server be installed?()A.Node AB.Node BC.neither of the nodesD.both Node A and Node B
Paul wants to log in to 11i Oracle Applications. Identify the first server to which his requestwould go.() A.Web serverB.Reports serverC.Administration serverD.Concurrent Processing server
When installing the CRS software on two or more nodes in the same cluster, how do you know it is safe to start installing the next node? ()A、Wait until the node is completely installed to start installation on the next one. B、After you insert Disk 2. C、A dialog box, "It is now safe to start installing the next node," appears during the installation. D、After Windows OS is installed on the first node.
An administrator is planning a cluster running applications in 3 separate resource groups. RGA - Database 1 RGB - Web Server RGC - Database 2 Database 1 and Database 2 must be online before the Web Server. All resource groups have a Startup Policyof Online on Home Node Only. Which of the following will ensure that the resource groups are processed in the correct order?()A、Set the Serial Acquisition OrderB、Set the Parallel Acquisition OrderC、Configure Online on the Same Node DependencyD、Configure Online on Different Nodes Dependency
During cluster fallover testing,the administrator determines that additional work is required to stop existing test applications on the standby node,prior to starting the production applications on the surviving node. To manage this type of requirement,which step should be performed first?() A、 Create a custom pre/post event.B、 Add a custom user defined event.C、 Define custom error notification.D、 Modify the test application server.
An enterprise has three nodes: -Node ’A’ is a production database, -Node ’B’ is a production Application server, and -Node ’C’ is a test and development node. Node ’C’ is used by six programmers to develop and the production application as business critical and would like to make it highly available with HACMP. Application development and testing is not business critical. Which of the following describes the best solution?() A、 There is not an adequate solution because HACMP should not be configured in this environment without a dedicated standby node.B、 Nodes ’A’ and ’B’ should be configured in a cluster with mutual fallover of two cascading resource groups to provide both nodes will deliver acceptable response time with both resource groups.C、 Nodes ’A’ and ’C’ should be configured in one cluster, and Nodes ’B’ and ’C’ in another cluster to prevent both the database and application server from falling over to Node ’C’ at the same time.D、 Nodes ’A’, ’B’, and ’C’ should be configured in a cluster with Node ’C’ the hot standby for both the database and application server resource groups. Workload Manager (WLM) must be configured on database and application developers from over utilizing the CPU resources.
Company.com is migrating from a third party managed disk subsystem to an IBM TotalStorage Enterprise Storage Server. Connection of the new storage server is complete, and it has been tested on all of the nodes in the three node HACMP cluster. How does the customer migrate to the new storage server with minimum down time?()A、 Shut down one node at a time and let the other node serve the applicationB、 Stop HACMP with the forced option and perform migration of the disks on one node,then restart HACMPC、 Stop both nodes and perform the migration all at once using standard AIX commands in parallel, then restart the clusterD、 Use C-SPOC to add the new disks to the cluster and migrate the information off the existing disks, then remove the old disks with C-SPOC
An HACMP cluster has three nodes of unequal size. The largest node is Node ’A’. The primary application on Node ’A’ has two components. One component is memory intensive, the other is IO intensive. Nodes ’B’ and ’C’ are running web servers and databases that access information produced by applications on Node ’A’. The customer requires the most performance from the primary application and wants all nodes available for fallover processing. Which of the following is the best solution for meeting the customer requirements?() A、 Use nodes of equal size.B、 Create multiple resource groups and use loadlever.C、 Use dynamic node priority to manage resource groups.D、 Use an ordered list to manage resource group fallover.
()is a collection of components managed by Fusion Middleware Control. It can contain Oracle WebLogic Server domains, one Administration Server, one or more Managed Servers, clusters, and the Oracle Fusion Middleware components that are installed, configured, and running in the domainA、 farmB、 beanC、 unitD、 node
Paul wants to log in to 11i Oracle Applications. Identify the first server to which his requestwould go.()A、Web serverB、Reports serverC、Administration serverD、Concurrent Processing server
ABC Corp. is installing 11i Oracle Applications on two nodes A and B. On Node A, it hasinstalled the Forms server, Web server, and Administration server. On Node B, it has installed theConcurrent Processing server. By default, on which node would the Reports server be installed?()A、Node AB、Node BC、neither of the nodesD、both Node A and Node B
You are a network administrator for your company. The network contains four Windows Server 2003 computers configured as a four-node server cluster. Each cluster node is the preferred owner of a clustered instance of Microsoft SQL Server 2000, and each cluster node is configured as a possible owner of all other instances of SQL Server. All nodes have identically configured hardware. All four nodes operate at a sustained 70 percent CPU average. You add a server that has identically configured hardware to the cluster as a fifth node. You want each SQL Server instance to continue operating at the same level of performance in the event of a single node failure. What should you do? ()A、 Clear the Affect group check box in the cluster resource properties for each SQL Server instance.B、 Configure the fifth node as the only possible owner other than the existing preferred owner of the cluster resources that are associated with each SQL Server instance.C、 Configure the fifth node as the preferred owner of each cluster group that contains an SQL Server instance.D、 Enable failback on each group that contains an SQL Server instance.
You have a server that runs Windows Server 2008 Enterprise Edition. The server has the FailoverClustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3. The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster hasa dedicated cluster group named Group1 that includes the MSDTC resource. You discover that Group1 isunable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functionswithout errors. You need to configure Group1 to support the failover between all cluster nodes. What should you do?()A、Remove the MSDTC resource from Group1B、Select NODE3 as a preferred owner for Group1C、Remove NODE3 as a possible owner from all cluster resources in Group1D、Onfigure NODE3 as a possible owner for all cluster resources in Group1
You have a server that runs Windows Server 2008 Enterprise Edition. The server has the Failover Clustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3. The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster has a dedicated cluster group named Group1 that includes the MSDTC resource. You discover that Group1 is unable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functions without errors. You need to configure Group1 to support the failover between all cluster nodes. What should you do?()A、Remove the MSDTC resource from Group1.B、Select NODE3 as a preferred owner for Group1.C、Remove NODE3 as a possible owner from all cluster resources in Group1.D、Configure NODE3 as a possible owner for all cluster resources in Group1.
You are configuring a failover cluster for a database server. You are assigning four nodes to the cluster. Allnodes have access to a SAN,and adequate storage is available. Which of the following options should youchoose for your quorum configuration?()A、Node MajorityB、Node And Disk MajorityC、Node And File Share MajorityD、No Majority: Disk Only
单选题An administrator is planning a cluster running applications in 3 separate resource groups. RGA - Database 1 RGB - Web Server RGC - Database 2 Database 1 and Database 2 must be online before the Web Server. All resource groups have a Startup Policyof Online on Home Node Only. Which of the following will ensure that the resource groups are processed in the correct order?()ASet the Serial Acquisition OrderBSet the Parallel Acquisition OrderCConfigure Online on the Same Node DependencyDConfigure Online on Different Nodes Dependency
单选题An HACMP cluster has three nodes of unequal size. The largest node is Node ’A’. The primary application on Node ’A’ has two components. One component is memory intensive, the other is IO intensive. Nodes ’B’ and ’C’ are running web servers and databases that access information produced by applications on Node ’A’. The customer requires the most performance from the primary application and wants all nodes available for fallover processing. Which of the following is the best solution for meeting the customer requirements?()A Use nodes of equal size.B Create multiple resource groups and use loadlever.C Use dynamic node priority to manage resource groups.D Use an ordered list to manage resource group fallover.
单选题ABC Corp. is installing 11i Oracle Applications on two nodes A and B. On Node A, it hasinstalled the Forms server, Web server, and Administration server. On Node B, it has installed theConcurrent Processing server. By default, on which node would the Reports server be installed?()ANode ABNode BCneither of the nodesDboth Node A and Node B
单选题An administrator is planning a cluster running applications in 3 separate resource groups. RGA - Database 1 RGB - Web Server RGC - Database 2 Database 1 and Database 2 must be online before the Web Server. All resource groups have a Startup Policyof Online on Home Node Only. Which of the following will ensure that the resource groups are processed in the correct order?()ASet the Serial Acquisition OrderBSet the Parallel Acquisition OrderCConfigure Online on the Same Node DependencyDConfigure Online on Different Nodes Dependency
单选题An enterprise has three nodes: -Node ’A’ is a production database, -Node ’B’ is a production Application server, and -Node ’C’ is a test and development node. Node ’C’ is used by six programmers to develop and the production application as business critical and would like to make it highly available with HACMP. Application development and testing is not business critical. Which of the following describes the best solution?()A There is not an adequate solution because HACMP should not be configured in this environment without a dedicated standby node.B Nodes ’A’ and ’B’ should be configured in a cluster with mutual fallover of two cascading resource groups to provide both nodes will deliver acceptable response time with both resource groups.C Nodes ’A’ and ’C’ should be configured in one cluster, and Nodes ’B’ and ’C’ in another cluster to prevent both the database and application server from falling over to Node ’C’ at the same time.D Nodes ’A’, ’B’, and ’C’ should be configured in a cluster with Node ’C’ the hot standby for both the database and application server resource groups. Workload Manager (WLM) must be configured on database and application developers from over utilizing the CPU resources.
单选题You have a server that runs Windows Server 2008 Enterprise Edition. The server has the Failover Clustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3. The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster has a dedicated cluster group named Group1 that includes the MSDTC resource. You discover that Group1 is unable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functions without errors. You need to configure Group1 to support the failover between all cluster nodes. What should you do?()ARemove the MSDTC resource from Group1.BSelect NODE3 as a preferred owner for Group1.CRemove NODE3 as a possible owner from all cluster resources in Group1.DConfigure NODE3 as a possible owner for all cluster resources in Group1.
单选题During cluster fallover testing,the administrator determines that additional work is required to stop existing test applications on the standby node,prior to starting the production applications on the surviving node. To manage this type of requirement,which step should be performed first?()A Create a custom pre/post event.B Add a custom user defined event.C Define custom error notification.D Modify the test application server.
单选题()is a collection of components managed by Fusion Middleware Control. It can contain Oracle WebLogic Server domains, one Administration Server, one or more Managed Servers, clusters, and the Oracle Fusion Middleware components that are installed, configured, and running in the domainA farmB beanC unitD node
单选题You are a network administrator for your company. The network contains four Windows Server 2003 computers configured as a four-node server cluster. Each cluster node is the preferred owner of a clustered instance of Microsoft SQL Server 2000, and each cluster node is configured as a possible owner of all other instances of SQL Server. All nodes have identically configured hardware. All four nodes operate at a sustained 70 percent CPU average. You add a server that has identically configured hardware to the cluster as a fifth node. You want each SQL Server instance to continue operating at the same level of performance in the event of a single node failure. What should you do? ()A Clear the Affect group check box in the cluster resource properties for each SQL Server instance.B Configure the fifth node as the only possible owner other than the existing preferred owner of the cluster resources that are associated with each SQL Server instance.C Configure the fifth node as the preferred owner of each cluster group that contains an SQL Server instance.D Enable failback on each group that contains an SQL Server instance.
单选题You have a server that runs Windows Server 2008 Enterprise Edition. The server has the FailoverClustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3. The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster hasa dedicated cluster group named Group1 that includes the MSDTC resource. You discover that Group1 isunable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functionswithout errors. You need to configure Group1 to support the failover between all cluster nodes. What should you do?()ARemove the MSDTC resource from Group1BSelect NODE3 as a preferred owner for Group1CRemove NODE3 as a possible owner from all cluster resources in Group1DOnfigure NODE3 as a possible owner for all cluster resources in Group1
单选题When installing the CRS software on two or more nodes in the same cluster, how do you know it is safe to start installing the next node? ()AWait until the node is completely installed to start installation on the next one. BAfter you insert Disk 2. CA dialog box, It is now safe to start installing the next node, appears during the installation. DAfter Windows OS is installed on the first node.
单选题Company.com is migrating from a third party managed disk subsystem to an IBM TotalStorage Enterprise Storage Server. Connection of the new storage server is complete, and it has been tested on all of the nodes in the three node HACMP cluster. How does the customer migrate to the new storage server with minimum down time?()A Shut down one node at a time and let the other node serve the applicationB Stop HACMP with the forced option and perform migration of the disks on one node,then restart HACMPC Stop both nodes and perform the migration all at once using standard AIX commands in parallel, then restart the clusterD Use C-SPOC to add the new disks to the cluster and migrate the information off the existing disks, then remove the old disks with C-SPOC