单选题Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner?().ATwo to four feet by the bowBSlightly by the bowCNo trim should be permittedDSlightly by the stern

单选题
Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner?().
A

Two to four feet by the bow

B

Slightly by the bow

C

No trim should be permitted

D

Slightly by the stern


参考解析

解析: 暂无解析

相关考题:

When the tail-shaft is drawn from a vessel in dry-dock, which of the following inspections is required to be carried out?A.The propeller hub taper and shaft keyway should be inspected for cracks or corrosionB.The stern bearing alignment with the stern frame should be checkedC.The interior of the stern tube should be inspected for leaksD.The shaft liner should be removed and inspected for cracks

A fire has broken out on the stern of your vessel. You should maneuver your vessel so the wind ______.A.comes over the bowB.blows the fire back toward the vesselC.comes over the sternD.comes over either beam

Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel?A.Lower the stern ramp,raise/open the stern door,turn on ventilation for cargo holdsB.Turn on ventilation for cargo holds,raise/open the stern door,lower the stern rampC.Turn on ventilation for cargo holds,lower the stern ramp,raise/open the stern doorD.Raise/open the stern door,lower the stern ramp,turn on ventilation for cargo holds

A vessel towing a barge astern would show,at the stern ______.A.only a stern lightB.a towing light above the stern lightC.two towing lights in a vertical lineD.two white lights in a vertical line

A vessel trimmed by the stern has a ______.A.ListB.DragC.SetD.Sheer

Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner ________.A.Two to four feet by the bowB.Slightly by the bowC.No trim should be permittedD.Slightly by the stern

A fire has broken out the stern of your vessel. You should maneuver your vessel so the windA.blow the fire back toward the vesselB.comes over the bowC.comes over the sternD.comes over either beam

单选题The ship should have a slightly deeper draft().Aon port sideBon starboard sideCat the port quarterDat the stern

单选题A vessel trimmed by the stern has a().AlistBdragCsetDsheer

单选题For operations in pack ice,a vessel should().Abe on an even keelBbe trimmed slightly by the headChave a drag of not more than 60 - 90 centimetersDbe ballasted so the forefoot is near the surface

单选题You are on a vessel that cannot comply with the spacing requirement for masthead lights.What is required in this situation().AThe vessel must carry only the lights that comply with the rules; the others may be omittedBThe vessel's lights must comply as closely as possible,as determined by her governmentCThe vessel must be altered to permit full compliance with the rulesDAn all-round light should be substituted for the after masthead light and the stern light

单选题Your vessel is damaged with no list,but down by the stern. There is progressive flooding and trim by the stern is increasing. What is the effect on transverse stability after the deck edge at the stern is submerged?()AKB increases,increasing BM and therefore GMBKG increases due to the weight of the added water on deckCBM decreases from loss of water plane and greater volumeDThere is no effect on transverse stability

单选题How should you try to right a capsized small sailing vessel?()APosition all personnel at the stern and rock the vessel uprightBPosition all personnel around the mast and lift the vessel uprightCLock the centerboard in the down position,stand on the centerboard,and pull on a shroud or a halyardDPut the centerboard in the up position and have all personnel haul in on the line attached to the mast

单选题In astern towing,a tow span,also called the tow bar or towing arch,is used to().Ainsure that the hawser leads directly aft as it passes over the stern of the towing vesselBincrease the stability of the towing vessel by raising the hawser off the deckCreduce chafing of the towing hawserDprevent fouling of the hawser on deck gear located on the stern of the towing vessel

单选题When the tail-shaft is drawn from a vessel in dry-dock, which of the following inspections is required to be carried out?()AThe propeller hub taper and shaft keyway should be inspected for cracks or corrosionBThe stern bearing alignment with the stern frame should be checkedCThe interior of the stern tube should be inspected for leaksDThe shaft liner should be removed and inspected

单选题Two barges are being pushed ahead by a tugboat.Which statement is TRUE concerning lights on the barges().AEach vessel should show sidelightsBEach vessel should show at least one white lightCThe barges should be lighted as separate unitsDThe barges should be lighted as one vessel

单选题A fire has broken out on the stern of your vessel. You should maneuver your vessel so the wind().Ablows the fire back toward the vesselBcomes over the bowCcomes over the sternDcomes over either beam

单选题There is a fire aft aboard your vessel. To help fight the fire,you should().Aput the wind off either beamBhead the bow into the wind and decrease speedCput the stern into the wind and increase speedDput the stern into the wind and decrease speed

单选题What is NOT a problem area when loading barges on a LASH type vessel? ()AFrequent stability calculations requiredBThorough pre-planning requiredCLimiting depths alongside berths restrict barge draftsDMinimum trim and 0°list are required for optimum operations

单选题A situation has occurred in which your vessel must be towed. When the towing vessel passes the towing line to you,you should secure the line().Ato the base of the foremastBto the forward-most bittsCto the forward part of the deckhouseDat the stern

单选题A vessel loads edible oil in a deep tank through a manhole at the midlength of the tank. In order to fill the tank to maximum capacity,what trim should the vessel have?()ADown by the bowBDown by the sternCDown by either the bow or sternDIn level trim

单选题Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel? ()ALower the stern ramp,raise/open the stern door,turn on ventilation for cargo holdsBTurn on ventilation for cargo holds,raise/open the stern door,lower the stern rampCTurn on ventilation for cargo holds,lower the stern ramp,raise/open the stern doorDRaise/open the stern door,lower the stern ramp,turn on ventilation for cargo holds

单选题While your vessel is docked port side to a wharf,a sudden gale force wind causes the vessel’s stern lines to part. The stern begins to fall away from the dock,and no tugs are immediately available. Which measure(s) should you take FIRST?()ANotify the engineroom of the need for propulsionBShut down any cargo transfer that's in progressCLet go the port anchor and veer to a short scope of chainDObtain assistance from the terminal to put new stern lines out

单选题When evacuating a seaman by helicopter lift,which statement is TRUE?()AEvacuation should be from an area forward of the bridgeBThe vessel should be slowed to bare steeragewayCIf the hoist is at the stern,booms extending aft at the stern should be cradled with the topping lifts hove tautDThe litter should not be touched until it has been grounded

单选题If your vessel is dragging her anchor in a strong wind,you should().Ashorten the scope of anchor cableBincrease the scope of anchor cableCput over the sea anchorDput over a stern anchor

单选题A vessel has been equipped with an oil lubricated stern bearing and is undergoing a routine dry-dock.Which of the following inspection should be made when the tail-shaft has been drawn?()AThe overall condition of the bearing surface should be examinedBThe shaft liner should be inspected for cracks and tested to insure a tight fitCThe stern tube should be tested for cracks with dye penetrantDall of above

单选题What is MTI?().AThe fioot/tons needed to trim the vessel by 1 inchBThe foot/tons needed to trim the vessel by 1 footCThe moments needed to trim the vessel by 1 centimeterDThe amount of vessel will trim when loading 100 tons 100 feet from the tipping center