单选题The shipboard oil pollution emergency plan will be invalid after ()Aone yearBtwo yearsCfour yearsDfive years
单选题
The shipboard oil pollution emergency plan will be invalid after ()
A
one year
B
two years
C
four years
D
five years
参考解析
解析:
暂无解析
相关考题:
People can help solve the problem of pollution by______.A. urging their governments to control litter and wasteB. cutting down the use of oil and other oil productsC. reducing unnecessary buying, over-consumption and careless disposal of wastesD. making anti-pollution advertisements
The approval period for a shipboard Oil Pollution Emergency Plan expires after ______.A.three yearsB.four yearsC.five yearsD.two years
Oil Pollution Regulations require any transfer or discharge of oil or oily mixtures to be recorded in theA.bridge logB.Master's logC.engine room logD.oil record
A shipboard oil pollution emergency plan is required of ______.A.all vessels, regardless of size and commercial applicationB.any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardC.an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveD.an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above
Bilges may be pumped______.A.on the outgoing tideB.overboard after darkC.overboard through an anti-pollution equipmentD.anytime in an emergency, i.e. main engine lube oil failure
Which substance is NOT considered to be Oil under the pollution prevention regulations?A.Petroleum and fuel oilB.SludgeC.Oil mixed with dredge spoilD.Oil refuse and oil mixed with wastes
Shipboard Oil Pollution Emergency Plan shall be carried on board by ______.A.Oil tanker of 150 gross tonnage and aboveB.Bulk carrierC.Container vesselD.Passenger ship
Which is a mandatory section of the shipboard Oil Pollution Emergency Plan ________.A.Reporting requirementsB.Removal equipment listC.Planned exercisesD.List of individuals required to respond
The international shore connection ______.A.Allows hook up of fire fighting water from shore facilitiesB.Satisfies pollution prevention requirementsC.Allows emergency use of the fire main for deballastingD.Permits discharge of waste oil to shore facilities
单选题The term "oil", as used in the Pollution Prevention Regulations, means ().Afuel oil onlyBcrude oil onlyCliquefied petroleum gasDpetroleum oil of any kind
单选题A ship that,at any time,operates seaward of the outermost boundary of the territorial sea is required to prepare,submit,and maintain a(n)().Asynthetic plastic discharge planBoil discharge planCshipboard oil pollution emergency planDvapor recovery procedures plan
单选题The term OIL as used in the Oil Pollution Regulations means().Afuel oilBsludgeCoil refuseDAll of the above
单选题What type of oil is not covered in the oil pollution law?()Amineral oilBmachinery oil being transferred for shipboard useCcrude oil unrefinedDnormal bilge oil and water
单选题A shipboard oil pollution emergency plan is required of ().Aall vessels, regardless of size and commercial applicationBany barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardCan oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveDan oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above
单选题A shipboard Oil Pollution Emergency Plan is required of().Aall vessels,regardless of size and commercial applicationBany barge or ship constructed or operated in such a manner that no oil in any form can be carried aboardCan oil tanker of 150 gross tons and above,or other ship of 400 gross tons and aboveDan oil tanker of 400 gross tons and above,or other ships of 150 gross tons and above
单选题The Pollution Prevention Regulations require that all oil spills in United States water be reported immediately to the ().Alocal port authorityBCorps of EngineersCUSCoast GuardDstate pollution board
单选题Shipboard Oil Pollution Emergency Plans must be reviewed().Aannually by the owner,with a letter submitted six months before expirationBonly once every five years,with a letter submitted six months before expirationCand the entire plan resubmitted for approval once every five years,six months before expirationDannually by the owner,with a letter submitted to the Coast Guard within one month of the anniversary date of the plan approval
单选题The approval period for a shipboard Oil Pollution Emergency Plan expires after().Atwo yearsBthree yearsCfour yearsDfive years
单选题Which is a mandatory section of the shipboard Oil Pollution Emergency Plan().AReporting requirementsBRemoval equipment listCPlanned exercisesDList of individuals required to respond
单选题If an emergency pump control is used as the emergency shutdown on a tank vessel,it must().Astop the flow of oil at the main deck manifoldBprevent the oil from leaving the shore facilityCprevent the oil from siphoning through the pumpDNone of the above
单选题Shipboard Emergency Drills must be carried out at least()on board cargo ship.AOnce every third yearBOnce a monthCOnce a yearDOnce a week
单选题Which list is NOT required to be provided as part of the appendices of the Shipboard Oil Pollution Emergency Plan?()AA list of agencies or officials of Coastal State Administrators responsible for receiving and processing incident reportsBA list of agencies or officials in regularly visited portsCA list specifying who will be responsible for informing the parties listed and the priority in which they must be notifiedDA list of personnel duty assignments
单选题After an occurrence of oil pollution,what shall be done first by a vessel in Chinese port? ().Ause oil dispersion agent and wait for investigationBtry to collect the oil on deck or in waterCreport to Harbor MasterDB and C
单选题If an emergency pump control is used as the emergency shutdown on a tanker,it must().Astop the flow of oil at the main deck manifoldBprevent the oil from leaving the shore facilityCprevent the oil from siphoning through the pumpDNone of the above
单选题When amendments are made to the Shipboard Oil Pollution Emergency Plan,the revisions must be submitted to the Coast Guard().Aone month before the anniversary date of the planBsix months before the end of the approval periodCand cannot be implemented without approvalDand can be implemented without immediate approval as long as final approval is received within six months of submission