单选题A customer plans to implement SVC as part of a solution and has concerns regarding the resilience of the SVC architecture. The correct response to this concern is that SVC().Ais stateless with global referencing of metadataBis based on cluster architecture with externally provided quorum disksCis based on cluster architecture, with quorum held internally on the first cluster nodeDis based on grid architecture, with each node holding a full mirror configuration for all other nodes

单选题
A customer plans to implement SVC as part of a solution and has concerns regarding the resilience of the SVC architecture. The correct response to this concern is that SVC().
A

is stateless with global referencing of metadata

B

is based on cluster architecture with externally provided quorum disks

C

is based on cluster architecture, with quorum held internally on the first cluster node

D

is based on grid architecture, with each node holding a full mirror configuration for all other nodes


参考解析

解析: 暂无解析

相关考题:

By default, who is responsible for firmware and software updates of an SVC solution? () A. the customerB. IBM customer engineerC. certified IBM Business PartnerD. IBM Maintenance and Technology Support organization

A customer plans to install ten Microsoft Windows servers, three Linux servers, and five AIX servers, with two Fibre Channel host bus adapters each as part of an IBM DS8700 implementation.What multipathing driver is required to build a redundant solution?()A.RDACB.MPIOC.SSPCD.SDDPCM

A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?() A.0B.1C.2D.4

Which service component in the implement phase is typically performed prior to the handover of a wireless solution to the customer’s operations organization?()A、systems integrationB、skill assessmentC、systems acceptance testingD、wireless check E、project close out

A bank has requested proposals for a storage solution to implement disaster recovery processes for their IBM System z configured with Linux, IBM System p configured with AIX, and Microsoft Windows environments. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, and FlashCopy. Floor space is limited. What hardware platform provides this native support?()A、IBM XIV Storage SystemB、IBM System Storage DS5300C、IBM System Storage DS8800D、IBM System Storage DS5020 with SVC

A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()A、0B、1C、2D、4

A customer plans to install ten Microsoft Windows servers, three Linux servers, and five AIX servers, with two Fibre Channel host bus adapters each as part of an IBM DS8700 implementation. What multipathing driver is required to build a redundant solution?()A、RDACB、MPIOC、SSPCD、SDDPCM

You are tasked with designing a security solution for your network.  What information should be gathered prior to designing the solution?()A、IP addressing design plans so that the network can be appropriately segmented to mitigate potential network threatsB、a list of the customer requirementsC、detailed security device specificationsD、results from pilot network testing

A customer is planning a combined solution of a 2 node SVC and DS8700 with 128x300 GB FC disks. During the TDA the reviewer compares the machine configuration with the customer’s expectations.  Which of the following customer requirements must be considered()A、the number of SAN ports required by the solutionB、thin provisioning is mandatoryC、the solution needs to support RAID 0D、the solution needs to be supported by the VMware Site Recovery Manager

By default, who is responsible for firmware and software updates of an SVC solution? ()A、the customerB、IBM customer engineerC、certified IBM Business PartnerD、IBM Maintenance and Technology Support organization

A customer is interested in obtaining an AIX solution from IBM.  They have two primary global requirements:   ? Availability (although HACMP is not required)   ? Low cost   Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()A、Design the least-cost solution to prevent the competition from winning the business.B、Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.C、Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.D、Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.

A customer recently acquired two Power servers and plans to implement AIX 6.1 and Live Application Mobility.  What other product is required to accomplish this objective? ()A、 HACMP for AIXB、 PowerVM Enterprise EditionC、 IBM Management Edition for AIXD、 Workload Partition Manager for AIX

A company wants a solution to consolidate their storage using the DS4000 series and implement a disaster recovery solution across two data centers linked by fibre to duplicate the production environment.The customer requires a solution with the least amount of system administration.  Which configuration would provide the best solution?()A、Implement one DS4400 at each location connected to the fibre link and use Remote Volume Mirror (RVM).B、Implement a DS4400 at each location using FlashCopy option and use host based replication to synchronize the sites.C、Implement a switched fabric using redundant SAN switches with a DS4300 using RVM option at each location.D、Implement a switched fabric using SAN switches connected via ISL with a DS4300 using RVM option at each location.

A customer plans to implement a new OLTP and data base application. The records are smalland access is random, with a lot of write activity. Which RAID level is the best solution for thisapplication?()A、RAID 1B、RAID 3C、RAID 5D、RAID 10

A customer plans to implement SVC as part of a solution and has concerns regarding the resilience of the SVC architecture. The correct response to this concern is that SVC().A、is stateless with global referencing of metadataB、is based on cluster architecture with externally provided quorum disksC、is based on cluster architecture, with quorum held internally on the first cluster nodeD、is based on grid architecture, with each node holding a full mirror configuration for all other nodes

A customer plans to implement a network of x3690 X5 servers. The customer has very limited funds. Which of the following tools would allow installation of firmware updates?()A、ToolsCenterB、VMware vSphere 4C、Tivoli Provisioning Manager (TPM)D、Tivoli Storage Manager (TSM)

A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()A、32U B、25U C、22U D、21U

A customer has two separate storage islands and is planning to implement an SVC to provide forFlashCopy between the two islands. What is the minimum number of inter-switch links (ISLs) thatare required?()A、0B、1C、2D、4

A customer wants to improve the utilization of the current capacity of their existing N series Tier 1production storage. What solution would the storage specialist discuss with the customer?()A、 compression with IBM Real-time Compression Appliances B、 deduplication with IBM ProtecTIER C、 virtualization with IBM SVC D、 file virtualization with SONAS

Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()A、The customer is looking for a fibre SAN solution to increase reliability and performance.B、The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.C、The customer is cost-conscious and is looking for a centralized storage solution.D、The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.

单选题By default, who is responsible for firmware and software updates of an SVC solution? ()Athe customerBIBM customer engineerCcertified IBM Business PartnerDIBM Maintenance and Technology Support organization

单选题A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()A0B1C2D4

单选题A customer has two separate storage islands and is planning to implement an SVC to provide forFlashCopy between the two islands. What is the minimum number of inter-switch links (ISLs) thatare required?()A0B1C2D4

单选题Which service component in the implement phase is typically performed prior to the handover of a wireless solution to the customer’s operations organization?()Asystems integrationBskill assessmentCsystems acceptance testingDwireless check Eproject close out

单选题A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum amount of rack space required to implement the solution of the following?()A32UB21UC25UD22U

单选题Which service component in the implement phase is typically performed prior to the handover of awireless solution to the customer’s operations organization?()ASystems IntegrationBSkill AssessmentCSystems Acceptance TestingDWireless CheckEProject Close Out

单选题Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()AThe customer is looking for a fibre SAN solution to increase reliability and performance.BThe customer wants to implement an energy-efficient solution to comply with their Go Green initiative.CThe customer is cost-conscious and is looking for a centralized storage solution.DThe customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.