单选题When ordering a new IBM Power Systems server, a customer is given the option of two types of Hardware Management Console:7042-CR4 and 7042-C06. Which main difference between the options would influence the customer's decision?()AThe 7042-CR4 is a rack mounted model, compared to the 7042-C06, which is adesktop.BThe 7042-CR4 is limited to 16 managed systems, compared to a limit of 32 for the 7042-C06.CThe 7042-C06 has faster CPUs and twice the RAM compared to the 7042-CR4,which is suited to large enterprise deployments.DThe 7042-C06 can manage POWER5-based hardware, in addition to POWER6, while the 7042-CR4 can only manage POWER6-based hardware.

单选题
When ordering a new IBM Power Systems server, a customer is given the option of two types of Hardware Management Console:7042-CR4 and 7042-C06. Which main difference between the options would influence the customer's decision?()
A

The 7042-CR4 is a rack mounted model, compared to the 7042-C06, which is adesktop.

B

The 7042-CR4 is limited to 16 managed systems, compared to a limit of 32 for the 7042-C06.

C

The 7042-C06 has faster CPUs and twice the RAM compared to the 7042-CR4,which is suited to large enterprise deployments.

D

The 7042-C06 can manage POWER5-based hardware, in addition to POWER6, while the 7042-CR4 can only manage POWER6-based hardware.


参考解析

解析: 暂无解析

相关考题:

What IBM resource helps to easily identify a business application that has been validated on IBM Systems?() NOTE:// Solutions that are in this resource represent applications that enable IBM Systems and verify, through customer experience, installing and running in a customer location.A、IBM Standalone Solutions Configuration Tool (SSCT)B、IBM Server ProvenC、IBM System x Reference Sheets (xREF)D、IBM Sizing Guides

A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems. What performance metric is recommended when evaluating the replacement system?()A、IBM CPWB、IBM rPerfC、SPECint_rate2006D、IDEAS International RPE2

During a review of environmental requirements before ordering an IBM System z9 server and IBM System Storage DS8700, the customer states that the available power is 220 volts AC.  Which feature should be included with the DS8700 order()  A、Low VoltageB、High VoltageC、Remote System z Power ControlD、Battery Assembly

A customer has a Linux server farm and wants to use IBM Director to manage all of their systems.  Which of the following is the preferred installation of IBM Director to fully manage the Linux systems?()A、Install Director Server on a Windows 2000 Server and install the Director agents on the Linux systems.B、Install IBM Director Agent on a Linux server and install the Director Server on the Linux systems.C、Install the Director Server on a Linux server and manage the systems via Linux native SNMP support.D、Install Director Server on a Linux server and install the Director Linux agent on the Linux systems.

Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()A、AIXB、IBM iC、LinuxD、VIO Server

A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines.  The pSeries technical specialist should make the customer aware of which IBM offering?()A、IBM Grid ToolboxB、IBM Capacity on DemandC、IBM Cluster Systems ManagementD、IBM Global Solutions Directory

A customer is looking for a new file and print server and is considering a 2-socket Intel server with redundant power and hard disk that must fit in the current server rack. With 2U available in the rack, the customer is looking for the best price performance ratio.  Which IBM server will fit the best for this customer?()A、x3200B、x3455C、x3550D、x3650

A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()A、IBM i EditionB、Express EditionC、Standard EditionD、Enterprise Edition

A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A、 vmstat and iostat data from the older machines B、 The number of CPUs that were installed in the original machines C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) D、 Performance data that is collected from the new system after it has been put into production

A customer has 15 IBM x365 servers in a rack environment and is using IBM Director for systems management.  They require the ability to restart any server independent of the operating system.  Which of the following is the most cost-effective solution?()A、Interconnect the service processors and use the IBM Director AgentB、Install RSA II in each server and chain together the systems management processorsC、Install the RSA II in the top server and chain together the service processor interconnectD、Install the IBM Director Agent on each server and use the remote control function to restart the servers

Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()A、AIXB、IBMiC、LinuxD、VIO Server

A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A、The customer used their IBM Customer NumberB、The customer has activated their base warrantyC、The customer purchased Remote Technical Support ServicepacD、The customer escalated the issue to the Duty Manager

A customer wants to monitor energy consumption for all of their IBM systems. What part of the IBM Systems Director family supports this function?()A、Active Energy ManagerB、PowerVM Energy ManagerC、Power and Energy ManagerD、Thermal and Energy Manager

A customer is searching for a new, small business server. The customer is standardized on AMD and does not want to place the new server in a rack.  Which IBM server will best fit this customers requirement? ()A、x3105B、x3200C、x3400D、x3455

A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing.  This system does not require an HMC.

A customer is installing a new xSeries server into a Token-Ring environment.  Where would the customer find the latest supported Token-Ring PCI adaptors for that server?()A、IBM ServerProven hardware websiteB、IEEE Proven websiteC、IBM PartnerWorld websiteD、3Com Support website

A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()A、A desk, as it not rack mountableB、Ethernet connections to the POWER5 systemsC、Serial connections to the POWER5 systemsD、USB connections for the keyboard and mouse

A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()A、Have optional Fibre Channel and Ethernet switches been installed in the server?B、What is the available kVA value of the UPS?C、Are there sufficient empty socket outlets in the UPS?D、What is the impact on the power consumption of the data center cooling system?

单选题A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()AA desk, as it not rack mountableBEthernet connections to the POWER5 systemsCSerial connections to the POWER5 systemsDUSB connections for the keyboard and mouse

单选题What IBM resource helps to easily identify a business application that has been validated on IBM Systems?() NOTE:// Solutions that are in this resource represent applications that enable IBM Systems and verify, through customer experience, installing and running in a customer location.AIBM Standalone Solutions Configuration Tool (SSCT)BIBM Server ProvenCIBM System x Reference Sheets (xREF)DIBM Sizing Guides

单选题A customer wants to install a pSeries system into an OEM rack.  What critical information is provided in the Site and Hardware Planning Information manual?()ASystem dimensions and weight, system power and cooling requirements, and list of supported OEM racksBSystem dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racksCSystem performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racksDSystem dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks

单选题A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems. What performance metric is recommended when evaluating the replacement system?()AIBM CPWBIBM rPerfCSPECint_rate2006DIDEAS International RPE2

单选题A customer is searching for a new, small business server. The customer is standardized on AMD and does not want to place the new server in a rack.  Which IBM server will best fit this customers requirement? ()Ax3105Bx3200Cx3400Dx3455

单选题A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A vmstat and iostat data from the older machines B The number of CPUs that were installed in the original machines C Data from Workload Estimator (WLE) and IBM Performance Management (PM) D Performance data that is collected from the new system after it has been put into production

单选题A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()AThe customer used their IBM Customer NumberBThe customer has activated their base warrantyCThe customer purchased Remote Technical Support ServicepacDThe customer escalated the issue to the Duty Manager

单选题When ordering a new IBM Power Systems server, a customer is given the option of two types of Hardware Management Console:7042-CR4 and 7042-C06. Which main difference between the options would influence the customer's decision?()AThe 7042-CR4 is a rack mounted model, compared to the 7042-C06, which is adesktop.BThe 7042-CR4 is limited to 16 managed systems, compared to a limit of 32 for the 7042-C06.CThe 7042-C06 has faster CPUs and twice the RAM compared to the 7042-CR4,which is suited to large enterprise deployments.DThe 7042-C06 can manage POWER5-based hardware, in addition to POWER6, while the 7042-CR4 can only manage POWER6-based hardware.

单选题A customer is looking for a new file and print server and is considering a 2-socket Intel server with redundant power and hard disk that must fit in the current server rack. With 2U available in the rack, the customer is looking for the best price performance ratio.  Which IBM server will fit the best for this customer?()Ax3200Bx3455Cx3550Dx3650

单选题Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()AAIXBIBM iCLinuxDVIO Server