单选题Consideration should be given in planning for the mooring orientation in a new location so that in adverse weather a crane is available to off-load the supply vessel on what side of the unit?()AWeather sideBLeeward sideCUpwind sideDCrosswind side

单选题
Consideration should be given in planning for the mooring orientation in a new location so that in adverse weather a crane is available to off-load the supply vessel on what side of the unit?()
A

Weather side

B

Leeward side

C

Upwind side

D

Crosswind side


参考解析

解析: 暂无解析

相关考题:

Lesson planning should be done at two levels: _____. A.macro planning and micro planningB.day by day and one week

(d) Explain to the management of Bailey’s why consideration should be given to resolving the problems through:(i) job rotation; (5 marks)

ideally, lesson planning should be done at two levels: _______________. A. before-class planning and after-class planningB. before-class preparation and after-class feedbackC. before-class planning and after-class reflectionD. macro planning and micro planning

Your speech given at the meeting, ______ everyone is taking into careful consideration, means much to us all.() A、 whereB、 whatC、 asD、 which

Mooring winch should be equipped with mechanical brakes capable of holding ______.A.half the breaking strength of the mooring lineB.the full breaking strength of the mooring lineC.the maximum expected tension of the mooring lineD.50% over the working tension of the mooring line

Mooring winch should be equipped with mechanical brakes which are capable of holding ______.A.half the breaking strength of the mooring lineB.the full breaking strength of the mooring lineC.the maximum expected tension of the mooring lineD.50% over the working tension of the mooring line

A storm is forecast for the area where your vessel is moored. For its safety you should put ______.A.more slack in the mooring linesB.a strain on the mooring linesC.chafing gear on the mooring linesD.grease on the mooring lines

If a mooring line should part while you are tying up at a dock,you should make a temporary eye by tying a ______.A.becket bendB.clove hitchC.bowlineD.square knot

When planning the loading or discharging of a VLCC(100,000 DWT+)what is the most important consideration ________.A.Draft and trimB.Limits of the bending momentsC.Rate of dischargingD.Rate of loading

Given the same water depth and line tension, the holding power of a 19 pound / foot wire rope mooring system in comparison to the holding power of a 90 pound / foot chain mooring system will be ______.A.weakerB.equalC.greaterD.Indeterminable

他们应该照看系泊缆绳。()A、They should take care of the mooring lines.B、They should take care of the gangway.C、They should take care of anchors.D、They should take care of anchor chains.

他们应该注意装卸货情况。()A、They should pay attention to the safety of the ship.B、They should pay attention to the rise and fall of tide.C、They should pay attention to the conditions of loading and unloading.D、They should pay attention to take care of the mooring lines.

单选题If a mooring line should part while you are tying up at a dock,you should make a temporary eye by tying a().Abecket bendBclove hitchCbowlineDsquare knot

单选题他们应该照看系泊缆绳。()AThey should take care of the mooring lines.BThey should take care of the gangway.CThey should take care of anchors.DThey should take care of anchor chains.

单选题In the design of hydraulic piping and equipment consideration is given to minimize turbulence in the hydraulic fluid, as this will cause()Amolecular fluid vibrationBenergy lossesCwide pressure variationsDmechanical damage to control valves

填空题What should you take into consideration when choosing a life insurance policy?Both your needs and the ____.

单选题After repair, the voyage trial of the M-E should be done ()Aafter the mooring trial has passedBbefore the mooring trialCunder the surveyors supervisionDafter repair

单选题If you are given the job of adding hydraulic fluid to a mooring winch, and are not certain as to the type of fluid to use, you should ().Aadd fluid that is the same color as the fluid in the reservoirBadd turbine oil because it is always a good substituteCadd any oil that has the same viscosity as the hydraulic fluidDcheck the winch manufacturers instruction book

单选题You should ()the mooring lines at the same time when the wind is big.AfastenBslackCfastDslacken

单选题When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()ADraft and trimBLimits of the bending momentsCRate of dischargingDRate of loading

单选题You should adjust the mooring lines according to the changes of()(吃水).AwaterBdraftCtideDsea

单选题An anchor winch should be equipped with mechanical brakes capable of holding().Ahalf the breaking strength of the mooring lineBthe full breaking strength of the mooring lineCthe maximum expected tension of the mooring lineD50% over the working tension of the mooring line

单选题In selecting a tug for moving a vessel,consideration should be given to its().Aindicated horsepower,bollard pull,and displacementBindicated horsepower,maneuverability,and displacementCindicated horsepower,bollard pull,and maneuverabilityDbollard pull,displacement,and maneuverability

单选题You are mooring to a buoy.You should approach the buoy with the current from().AaheadBbroad on the bowCabeamDastern

单选题When the order given by bridge may have bad results, the duty engineer should()Ainform the captain for a further consideration, then perform itBinform the captain, and not perform itCstop the M/E immediately, and then inform the chief engineerDstop the M/E immediately, and then inform the captain

单选题A storm is forecast for the area where your vessel is moored. For its safety you should put ().Amore slack in the mooring linesBa strain on the mooring linesCchafing gear on the mooring linesDgrease on the mooring lines

单选题Given the same water depth and line tension,the holding power of a 19 pound/foot wire rope mooring system in comparison to the holding power of a 90 pound/foot chain mooring system will be().AweakerBequalCgreaterDindeterminable