单选题In the voyage, when carrying out abandon ship drill () should be test every time.Athe emergency lighting system for muster and abandon shipBair oil emergency shut-downCME emergency operationDmain auxiliary steering gear changing

单选题
In the voyage, when carrying out abandon ship drill () should be test every time.
A

the emergency lighting system for muster and abandon ship

B

air oil emergency shut-down

C

ME emergency operation

D

main auxiliary steering gear changing


参考解析

解析: 暂无解析

相关考题:

______, where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.A.Voyage repairsB.Routine dockingC.Damage repairsD.Conversion

The term of Landfall means ________ .A.Land first sighted when vessel approaching from seawardB.Land last sighted when vessel leaving from a portC.in sight of one another when vessel underwayD.in sight of an island during a ship on her voyage

If passengers are on board when an abandon ship drill is carried out,they should ______.A.take partB.watchC.go to their quartersD.stay out of the way and do what they want

Fire drill is ()(执行)once a month.A、carry outB、carried outC、carrying outD、carry on

Topside paint is applied to the area of the ship’s ()which is out of water when the ship is loaded.A、hullB、cabinC、cargo holdD、deck

We are going to carry out an/a ()(应急演习).A、fire drillB、emergency drillC、boat drillD、abandon ship drill

When the charterer uses more time than time stipulated in a voyage C/P to load his cargo, the ship-owner is entitled to()A、overtimeB、dispatchC、demurrageD、deadfreight

单选题The tallying of cargo refers to such kind of work that the amount and condition of all cargo should be checked().Aafter its arrival at the destinationBduring the ship's voyage at seaCbefore they come to the dockDduring the time when the loading or diacharging is going on

单选题In the voyage, when carrying out abandon ship drill, should be test every time().Athe emergency lighting system for muster and abandon shipBair/oil emergency shut-downCM-Eemergency operationDmain/auxiliary steering gear changing

单选题The main function of the drawworks on a ship is to().Atransport tubulars from the pipe racks to the derrick floorBmaintain constant tension on the marine riserCstore and secure the excess drill lineDlower and hoist the drill string into and out of the drilled hole

单选题If the PSCO has clear grounds for carrying out a more detailed inspection, ()should be immediately informed of these grounds.Athe masterBthe chief engineerCthe owner of the shipDthe manager who assumes the responsibility for operation of the ship

单选题Progressive flooding on a ship is controlled by securing watertight boundaries and().Atransferring drill waterBdumping bulk materialsCpumping out flooded compartmentsDevacuating the unit

单选题()is applied to the area of the ship’s hull which is out of water when the ship is loaded.ABoottopping paintBTopside paintCBottom paintDPrimer

单选题Lifesaving regulations require that a fire drill include().Astarting the fire pumpsBchecking the operation of watertight doorsCchecking arrangements for abandon shipDAll of the above

单选题When the general alarm is sounded continuously, the engine room personnel should ().Aproceed to their man overboard stationsBstart the fire pumpCput on lifejackets and go to their abandon ship stationsDsecure the propulsion diesel engines and evacuate the engine room

单选题Ships carrying 15 or more seafarers and engaged in a voyage of more than three day’s duration shall provide separate hospital accommodation to be used().Afor other purposesBexclusively for medical purposesCfor a common ship‟s officeDby deck and engine departments

单选题The officer in charge of the navigational watch shall not hand over the watch to the relieving officer if().Athere is reason to believe that the latter is not capable of carrying out the watchkeeping duties effectivelyBthe ship is fitted with automatic steeringCthere is daylight or darknessDat no time shall the bridge be left unattended

单选题The essence of an abandon ship drill is that the survival crafts are manned and operated by the crew members assigned to them on the()Atire control planBfire drillCmuster listDAll of the above

单选题When carrying out mooring trial, if the M√Ecan’t start normally, you should ()Atake a further inspection in the voyageBcheck and repair, then retrialCdo as the surveyor’s requirementDretrial

单选题When carrying out mooring trial, the () trial of the MEis not necessary.AstartingBtorsion vibrationCdirection changingDrunning

单选题When carrying out the voyage trial, the M-E is not necessary to take()trial.AstartingBrunningCrunning-inDdirection changing

单选题If passengers are on board when an abandon ship drill is carried out,they should().Atake partBwatchCgo to their quartersDstay out of the way and do what they want

单选题During the required periodic abandon ship drill aboard a ship,each person not assigned duties in the muster list is().Ainstructed in the use of portable fire extinguishersBshown a video demonstrating lifeboat launchingCinstructed in the use of life jacketsDnot required to attend the boat drill

单选题The term of landfall means().Aland first sighted when vessel approaching from seawardBland last sighted when vessel leaving from a portCin sight of one another when vessel underwayDin sight of an island during a ship on her voyage

单选题准备弃船。()APrepare to abandon ship.BPrepare for abandon ship.CPrepare abandon ship.DPrepare for ship.

单选题We are going to carry out an/a ()(应急演习).Afire drillBemergency drillCboat drillDabandon ship drill

单选题The object of the both-to-blame collision clause is().Ato free the carrying ship from liabilityBto free the non-carrying ship from liabilityCto free the ship in the wrong from liabilityDto free the ship not to blame from liability