单选题Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()AConfigure a Shared Ethernet Adapter on the Virtual I/O Server.BUse the same virtual LAN ID on each LPAR.CSet up IP routing through an LPAR on each system.DSet up an IP firewall through an LPAR on each system.

单选题
Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()
A

Configure a Shared Ethernet Adapter on the Virtual I/O Server.

B

Use the same virtual LAN ID on each LPAR.

C

Set up IP routing through an LPAR on each system.

D

Set up an IP firewall through an LPAR on each system.


参考解析

解析: 暂无解析

相关考题:

You are the administrator of three SQL Server 2000 computers at Five Lakes Publishing. One server, FLPSQL01, stores order data. You want to be able to use the other two servers, FLPSQL02 and FLPSQL03, to answer queries and run report. The planned network configuration is shown in the exhibit.You want to use the database Maintenance Plan wizard to configure log shipping from FLPSQL01 to FLPSQL02 and FLPSQL03. You do not want users to add any new data on FLPSQL02 and FLPSQL03, but they must be able to run queries and reports.Which two actions should you take? (Each correct answer presents part of the solution. Choose two)A.Set the database load state for each destination server to No recovery mode.B.Set the database load state for each destination server to standby mode.C.Enable the allow database to assume primary role option for both destination servers.D.Enable the allow database to assume primary role option for one destination server and then disable this option for other destination server.E.Disable the allow database to assume primary role option for both destination servers.

Your company has two data centers.  Each data center contains a perimeter network.  Your network contains an Exchange Server 2010 organization.  You plan to deploy Exchange Server 2010 Edge Transport servers in the perimeter networks.  You need to recommend a solution for the Edge Transport servers that meets the following requirements:.Distribute inbound e-mail messages across all Edge Transport servers  .Ensure that users receive inbound e-mail messages if an Edge Transport server fails  .Ensure that users receive inbound e-mail messages if a single data center network becomes unavailable .Minimize costs  What should you recommend?()A、In each perimeter network, deploy one Edge Transport server. Implement failover clustering.B、In each perimeter network, deploy two Edge Transport servers. Implement failover clustering.C、In each perimeter network, deploy one Edge Transport server. Configure a mail exchange (MX) record for each server.D、In each perimeter network, deploy two Edge Transport servers. Configure a mail exchange (MX) record for each server.

Which feature of the IBM p5 servers enables customers to be confident that data within two distinct partitions on the server will be isolated?()A、POWER HypervisorB、Virtual LANC、POWER5 processorD、Redundant Power and Cooling

A small organization is purchasing a POWER5 to consolidate four applications. Currently, each application has two Host Bus Adapters (HBA) connected to an Enterprise Storage Server (ESS). The customer is concerned about the cost of purchasing eight new HBAs. Which feature of virtualization will be most beneficial to this organization?()A、Virtual EthernetB、Micro-PartitioningC、Virtual I/O ServerD、Capped and uncapped partitions

Company.com wants to build two Dynamic Logical Partitions (DLPAR) on a p5-520. They have a requirement for communication between the two DLPARs. Which feature of virtualization will satisfy this requirement?()A、VLANB、Virtual EthernetC、Virtual I/O Server SupportD、Capped and Uncapped Partitions

A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()A、Ensure Director Agent is installed on the new servers.B、Ensure a DHCP Sever is installed and configured in the environment.C、Ensure Server Plus Pack option has been installed and configured.D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()A、Configure a Shared Ethernet Adapter on the Virtual I/O Server.B、Use the same virtual LAN ID on each LPAR.C、Set up IP routing through an LPAR on each system.D、Set up an IP firewall through an LPAR on each system.

Which of the following best describes Simultaneous Multi-threading (SMT)?()A、A POWER5 microprocessor feature that allocates two processors to each applicationB、A Workload Manager feature that allows two processing threads to be executing on a single processorC、An AIX v5.2 feature that allows two processing threads to be executing on a single processor concurrentlyD、A POWER5 microprocessor feature that allows two processing threads to be executing on a single processor concurrently

Your network contains a Web-based application that runs on Windows Server 2003. You plan to  migrate the Web-based application to Windows Server 2008 R2. You need to recommend a server  configuration to support the Web-based application. The server configuration must meet the following  requirements:   èEnsure that the application is available to all users if a single server?fails èSupport the installation of .NET applications èMinimize software costs  What should you recommend?() A、Install the Server Core installation of Windows Server 2008 R2 Standard on two servers. Configure the servers in a Network Load Balancing cluster.B、Install the full installation of Windows Server 2008 R2 Web on two servers. Configure the servers in a Network Load Balancing cluster.C、Install the full installation of Windows Server 2008 R2 Enterprise on two servers. Configure the servers in a failover cluster.D、Install the full installation of Windows Server 2008 R2 Datacenter on two servers. Configure the servers in a failover cluster.

You are employed as the enterprise exchange administrator at TestKing.com. The TestKing.com networkconsits of a single Active Directory site. TestKing.com makes use of Microsoft Exchange Servermessaging solution. You are in the process of planning the deployment of Exchange Server 2010. The CIO provides you withthe set criteria needed to deploy the Exchange Server 2010 servers. TestKing.com wants you to ensurethat: * The Mailbox servers belong to the database availability group (DAG). * The users are able to send and receive e-mail in the event of a single server failure. * The minimization of the amount of servers deployed. * The load balancing of MAPI connections form Outlook Clients using hardware load balancer.You need to plan the deployment to the Exchange Server 2010 servers to meet the above criteria. What should you do?()A、Your plan should include deploying four servers.The Mailbox server role as well as the Hub Transport server role should be configured on two serversand the Client Access server role on the remaining two.Therafter a Client Access server array should be configured.B、Your plan should include deploying two servers.The Mailbox server role, the Client Access server role as well as the Hub Transport server role shouldbe configured on the two servers there after a Client Access server array should be configured.C、Your plan should include deploying four servers.The Mailbox server role should be deployed on two servers and the Client Access server role and theHub Transport server role on the remaining two.Therafter Outlook Anywhere should be enabled on both Client  Accessservers.D、Your plan should include deploying two servers.The Mailbox serve role, the Client Access server role as well as the Hub Transport server role shouldbe deployed on the two servers.Thereafter Outlook Anywhere should be enabled on both Client Access Servers.

Your network consists of a single Active Directory site that includes two network segments. Thenetwork segments connect by using a router that is RFC 1542 compliant. You plan to use Windows Deployment Services (WDS) to deploy Windows Server 2008 R2 servers. All new servers support Pre-Boot Execution Environment (PXE).  You need to design a deployment strategy to meet the following requirements: èSupport Windows Server?2008 R2   èDeploy the servers by using WDS in both network segments èMinimize the number of servers used to support WDS What should you include in your design?() A、Deploy one server. Install WDS and DHCP on the server. Configure the IP Helper tables on therouterbetween the network segments.B、Deploy two servers. Install WDS and DHCP on both servers. Place one server on each of the network segments. Configure both servers to support DHCP option 60.C、Deploy two servers. Install WDS and DHCP on both servers. Place one server on each of the network segments. Configure both servers to support DHCP option 252.D、Deploy two servers. Install WDS and DHCP on one server. Install DHCP on the other server. Place one server on each of the network segments. Configure both servers to support DHCP option60.

You need to recommend a Windows Server 2008 R2 server configuration that meets the following  requirements:   èSupports the installation of Microsoft SQL Server 2008   èProvides redundancy for SQL services if a single server fails What should you recommend?() A、Install a Server Core installation of Windows Server 2008 R2 Enterprise on two servers. Configure the servers in a failover cluster.B、Install a full installation of Windows Server 2008 R2 Standard on two servers. Configure Network Load Balancing on the two servers.C、Install a full installation of Windows Server 2008 R2 Enterprise on two servers. Configure Network Load Balancing on the two servers.D、Install a full installation of Windows Server 2008 R2 Enterprise on two servers. Configure the servers in a failover cluster.

You are designing the placement of the global catalog servers. You want to use the minimum number of global catalog servers that are required. Which design should you use?()A、One global catalog server in New York.B、Two global catalog servers in New York.C、One global catalog server in Chicago and one global catalog server in New York.D、Two global catalog servers in Chicago and two global catalog servers in New York.E、One global catalog server in Chicago, one global catalog server in New York, and one global catalog server in Boston.

Your network consists of a single Active Directory site. You plan to deploy Exchange Server 2010.  You need to plan the deployment of Exchange Server 2010 servers to meet the following requirements:.All Mailbox servers must belong to a database availability group (DAG) .MAPI connections from Outlook clients must be load balanced by using a hardware load balancer .If a single server fails, users must continue to send and receive e-mail .The plan must minimize the number of servers deployed  What should you include in the plan?()A、Deploy two servers. On the two servers,deploy the Mailbox server role,the Client Access server role,and the HubTransport server role. Configure a Client Access server array.B、Deploy two servers. On the two servers, deploy the Mailbox server role,the Client Access Server role,and the HubTransport server role. Enable Outlook Anywhere on both Client Access servers.C、Deploy four servers. On two of the servers,deploy the Mailbox server role and the Hub Transport server role. On the other two servers,deploy the Client Access server role. Configure a Client Access server array.D、Deploy four servers. On two of the servers,deploy the Mailbox server role. On the other two servers,deploy the Client Access server role and the Hub Transport server role. Enable Outlook Anywhere on both Client Access servers.

You have a Microsoft Internet Security and Accelerator (ISA) 2006 server that provides all Internet accessfor your company.  You have two Mailbox servers configured in a database availability group (DAG), two Client Accessservers, and two Hub Transport servers.  You need to recommend changes to the environment to ensure that users can access Outlook Web App(OWA) from the Internet if any single server fails.  What should you recommend?()A、Configure a Client Access server array.B、Deploy a second ISA server and create an ISA server array.C、Implement Windows Network Load Balancing for the Client Access servers.D、Deploy two Edge Transport servers that are configured to use EdgeSync synchronization.

Your network contains two Active Directory sites. The sites connect to each other by using a WAN link.  You plan to deploy two Exchange Server 2010 Mailbox servers and two Client Access servers in eachsite.  Each site will contain a Client Access array.  You need to recommend a solution to deploy Hub Transport servers. The solution must meet the following requirements:.Continue to deliver e-mail messages to users in other sites if a single Hub Transport server fails .Support the planned Client Access array deployment.Minimize the number of Exchange servers What are two possible ways to achieve this goal?()A、Add the Hub Transport server role to each Mailbox server.B、Add the Hub Transport server role to each Client Access server.C、Deploy two Hub Transport servers on two new servers in each site.D、Deploy one Hub Transport server on a new server, and then install the SMTP service on each Client Access server.

单选题You are designing the placement of the global catalog servers. You want to use the minimum number of global catalog servers that are required.  Which design should you use?()A One global catalog server in New York.B Two global catalog servers in New York.C One global catalog server in Chicago and one global catalog server in New York.D Two global catalog servers in Chicago and two global catalog servers in New York.E One global catalog server in Chicago, one global catalog server in New York, and one global catalog server in Boston.

单选题A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems. What performance metric is recommended when evaluating the replacement system?()AIBM CPWBIBM rPerfCSPECint_rate2006DIDEAS International RPE2

单选题Two Exchange Servers 2010 has Mailbox Servers.You create a DAG.You need to install all of Failover Clustering Components on Mailbox Servers. What should you do?()AAdd both Servers to DAGBInstall Application Server Role on both ServersCRun Setup /Roles:MB /NewCMS on both serversDRun Start -clusteredMailboxServer cmdlet on both servers

单选题Which of the following best describes Simultaneous Multi-threading (SMT)?()AA POWER5 microprocessor feature that allocates two processors to each applicationBA Workload Manager feature that allows two processing threads to be executing on a single processorCAn AIX v5.2 feature that allows two processing threads to be executing on a single processor concurrentlyDA POWER5 microprocessor feature that allows two processing threads to be executing on a single processor concurrently

单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()AOrder a POWER5 HMCBConnect to the existing HMCCInstall an 8-port asynchronous card in the managed server to connect to the existing HMCDInstall an additional network card to the existing HMC and connect to the POWER5 service processor

单选题You need to design a configuration for the mailbox servers. What should you do?()ACreate two Exchange Server 2003 computers. Place the mailboxes for main office users on one server, and place the mailboxes for remote users on the other serverBCreate a Network Load Balancing cluster that contains two Exchange Server 2003 computers. Place half of the user mailboxes on one server, and place half of the user mailboxes on the other serverCCreate a Microsoft Cluster Server cluster that contains two Exchange Server 2003 computers. Place all of the user mailboxes on one server and configure the other server as a failover nodeDCreate a Microsoft Cluster Server cluster that contains two Exchange Server 2003 computers. Place half of the user mailboxes on one server, and place half of the user mailboxes on the other server

单选题A company needs to connect seven of their Windows-based servers to a DS4000 storage server.   The DS4000 only has two host-side connections, and each server has two HBAs.  Which of the following is the lowest cost solution to provide no single points of failure?()AImplement two 8-port switches design with ISLsBImplement two 16-port switches design with ISLsCImplement two 8-port switches design without ISLsDImplement two 16-port switches design without ISLs

单选题Companycom is about to purchase a POWER5 Enterprise server which requires two Ethernet ports and two disks for each of the four LPARs. It has been configured and validated using the IBM eConfig tool. Which of the following is very important to verify in addition to the eConfig validation?()ATotal number of SCSI adaptersBTotal number of Ethernet adaptersCTotal number of Ethernet adapters and number of SCSI paths per LPARDTotal number of SCSI paths available and total number of SCSI adapters