单选题Two mooring lines may be placed on the same bollard and either one cast off first if().Athe eye of the second line is dippedBthe mooring lines are doubledCthe bollard has two hornsDone of the lines is a breast line
单选题
Two mooring lines may be placed on the same bollard and either one cast off first if().
A
the eye of the second line is dipped
B
the mooring lines are doubled
C
the bollard has two horns
D
one of the lines is a breast line
参考解析
解析:
暂无解析
相关考题:
The best method for tying two lines of the same size together is by using a ______.A.becket bendB.two bowlinesC.single carrick bendD.square knot
A position that is obtained by using two or more intersecting lines of position taken at nearly the same time,is a(n) ______.A.fixB.running fixC.estimated positionD.dead-reckoning position
A storm is forecast for the area where your vessel is moored. For its safety you should put ______.A.more slack in the mooring linesB.a strain on the mooring linesC.chafing gear on the mooring linesD.grease on the mooring lines
Tensile stress is a result of two forces acting in ______.A.opposite directions on the same line,tending to pull the material apartB.opposite directions on the same line,tending to compress the objectC.opposite directions along parallel linesD.the same direction along parallel lines
If two mooring lines are to be placed on the same bollard,which method is BEST?______.A.Place the eye from the forward line on the bollard and then place the eye from the second line directly over the firstB.It makes no difference how the lines are placedC.Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollardD.Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch
Each line has a large eye splice at the end. The eye is placed over a ()(系缆桩) .A、bitB、guardC、quayD、bollard
You should (松)()the mooring lines at the same time when the wind is big.A、fastenB、slackC、fastD、slacken
The ()(系泊缆绳)consist of a head line ,two breast lines, two spring lines and a stern line.A、moor linesB、mooring linesC、unmoor linesD、unmooring lines
Each line has a large eye splice at the end. The eye is placed over a ().A、bitB、guardC、quayD、bollard
及时调整缆绳。()A、Adjust the mooring lines on time.B、Adjust the mooring lines in time.C、Adjust the mooring lines quickly.D、Adjust the mooring lines slowly.
单选题During storm conditions on a vessel,the mooring tensions should be adjusted so that().Aall mooring lines have a different tensionBthe leeward lines have higher tension than the windward linesCthe maximum tension of the most heavily loaded line does not exceed the safe working loadDall horizontal tension forces on the windward lines are no greater than the vertical tension forces
单选题Two mooring lines may be placed on the same bollard and either one cast off first if().Athe eye of the second line is dippedBthe mooring lines are doubledCthe bollard has two hornsDone of the lines is a breast line
单选题What is likely to occur when you are surging synthetic mooring lines on the gypsyhead during mooring operations?()AThe lines may jam and then jump off the gypsyheadBIf there is sudden strain on the line,the man tending the line may be pulled into the gypsyheadCThe lines' surging may cause the vessel to surgeDThe heat generated may cause the lines to temporarily fuse to the gypsyhead
单选题Tensile stress is a result of two forces acting in().Aopposite directions on the same line,tending to pull the material apartBopposite directions on the same line,tending to compress the objectCopposite directions along parallel linesDthe same direction along parallel lines
单选题A Chinese stopper (two lines) will hold best when you().Afasten the bitter ends to the mooring line with half hitchesBtwist the ends together and hold them in the direction of the pullCtwist the ends together and hold them in the direction opposite to the pullDtwist the ends together and hold them at right angles to the mooring line
单选题A position that is obtained by using two or more intersecting lines of position taken at nearly the same time,is a(n) ().AfixBrunning fixCestimated positionDdead-reckoning position
单选题You should slack the mooring lines ()when the wind is big.Aat the same timeBon timeCin timeDat times
单选题Get ready the mooring machinery, mooring lines and the gangway for ().Aloading cargoBarrival in portCdeparture from portDunloading cargo
单选题You should ()the mooring lines at the same time when the wind is big.AfastenBslackCfastDslacken
单选题If two mooring lines are to be placed on the same bollard,which method is BEST?().APlace the eye from the forward line on the bollard and then place the eye from the second line directly over the firstBIt makes no difference how the lines are placedCPlace the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollardDPlace both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch
单选题The best method for tying two lines of the same size together is by using a().Abecket bendBtwo bowlinesCsingle carrick bendDsquare knot
单选题A storm is forecast for the area where your vessel is moored. For its safety you should put ().Amore slack in the mooring linesBa strain on the mooring linesCchafing gear on the mooring linesDgrease on the mooring lines
单选题Mooring with two bow anchors has which major advantage over anchoring with one bow anchor? ().AThe vessel will not reverse direction in a tidal currentBThe radius of the vessel's swing will be shortenedCA mooring approach may be made from any directionDThe vessel will not swing with a change in wind
单选题Which statement is TRUE about placing the eyes of two mooring lines on the same bollard?()APut one line at the low point and one at the high point of the bollard so they don't touchBTake the eye of the second line up through the eye of the first line before putting the second line on the bollardCNever put two mooring lines on the same bollardDThe mooring line forward should be put on the bollard first
单选题The ARPA may swap targets when automatically tracking if two targets().Aare tracked on reciprocal bearingsBare tracked at the same rangeCare tracked on the same bearingDpass close together
单选题In a storm,the leeward lines of a ship’s mooring system will().Apull the unit in the same direction that the weather is pushing itBpull the unit in the opposite direction that the weather is pushing itCtend to keep the unit on its original location over the well headDaffect the unit's draft and inclination as maximum mooring tensions are reached