单选题If the main engine of an unattended engine room shuts down automatically, it will be indicated by an alarm ().Aat each control stationBin the chief engineer’s quartersCin the captains quartersDAll of the above are correct

单选题
If the main engine of an unattended engine room shuts down automatically, it will be indicated by an alarm ().
A

at each control station

B

in the chief engineer’s quarters

C

in the captains quarters

D

All of the above are correct


参考解析

解析: 暂无解析

相关考题:

STCW78/95 Convention describes that _____ are laid down for the certification of engineer officers in charge of a watch in a traditionally manned engine room, or the designated engineer in a periodically unmanned engine room.A.available minimum requirementsB.available maximum requirementsC.mandatory minimum requirementsD.mandatory maximum requirements

When stand-by before sailing, the duty engineer and officer should check clock, engine telegraph and rudder, and then write it in the0 A.engine room logbookB.vovage logbookc engine room logbook or voyage loglookD.engine room logbook and voyage logbook

What should be prepared before disassembly of cylinder for main engine or auxiliary engine?

With UMS, when the engine room is unwatched will control the main engineA.the bridge officer on watchB.the chief engineerC.the duty engineerD.the duty motorman

Which of the following is the stated proper sequence before commencing cargo operations aboard Ro-Ro vessels?A.Start ventilation,lower the ramp,notify engine roomB.Lower the ramp,start ventilation,notify engine roomC.Notify engine room,lower the ramp,start ventilationD.Start ventilation,notify engine room,lower the ramp

Your vessel has a midships engine room and the cargo is concentrated in the end holds.The vessel is ______.A.sagging with tensile stress on main deckB.sagging with compressive stress on main deckC.hogging with tensile stress on main deckD.hogging with compressive stress on main deck

材料:Condor a catamaran vessel operating between the Channel Islands and France.The vessel has two main engines in each hull.All propulsion units are duplicated,with each set independent from the other.Shortly after leaving St Helier,Jersey,with 31 passengers and 18 crew,the fire alarm sounded indicating a fire in the starboard engine room.This was confirmed by the closed circuit television surveillance system which showed flames in the vicinity of the starboard outer main engine.The vessel was immediately stopped,all machinery in the starboard engine room was stopped and the fuel supplies shut down.Jersey Radio was informed of the situation two minutes after the alarm sounded. After closing all ventilation openings and accounting for all personnel,halon fire smothering gas was released into the starboard engine room.This was done five minutes after the fire alarm first sounded. The crew maintained boundary cooling and intermittently operated the sprinkler system to the affected space.Twenty minutes after the alarm sounded the situation was considered to be under control.Using the port main engines the vessel returned to St Helier where assistance was available from shore based emergency services.问题:Condor has two ________ main engines.A.combinedB.independentC.coupleD.doubleThe fire accident happened in ________.A.both the engine roomsB.neither engine roomsC.the port engine roomD.the starboard engine roomThe fire was mainly extinguished with ________.A.waterB.chemical agentC.foamD.powderIt can be concluded that ________.A.no officials from any authority know the accident after it happenedB.some officials ashore must have learnt the accident at very beginningC.there must be casualties even they were not mentioned in the reportD.fire is not dangerous on board vessel请帮忙给出每个问题的正确答案和分析,谢谢!

材料:At 0840 hrs,with the ships head on 180°,the UNISOL grounded on a rocky bottom,forward of the main engine on her starboard side.A spout of water mixed with oil about 60cm in diameter and 2.5-3m high above the engine room bottom plating was observed,and at which time the main engines seemed to slow down.The engine room flooded rapidly and the water level soon reached the electro-magnetic couplings,stopping the main engine.In the meantime,on being apprised of the situation,the Master ordered the evacuation of the engine room,which was successfully carried out under the supervision of the 2/E engineer,and the engine room crew were mustered on the boat deck wearing life jackets.Shortly thereafter,the emergency air cut-off to the engine room and the emergency fuel shut-off were actuated causing the main generator to stop at 0845 hrs.The emergency generator then started up automatically.The starboard anchor was dropped in an attempt to prevent further westward drift.The vessel was by this time being subjected to pounding on the rocks,eventually breaking her back at 0930 hrs after which the violent motion ceased. Evacuation of the vessel commenced at 1045 hrs using 2 SAR helicopters with a Buffalo fixed-wing aircraft in attendance,and was completed at 1220 hours.问题:The main engine was caused to stop by the loss of the function of ________.A.engine room bottom platingB.emergency fuel shut-offC.emergency air cut-offD.electro-magnetic couplingsThe reason that the violent motion of the vessel ceased was that ________.A.the starboard anchor was dropped properly to prevent further westward driftB.the winds and/or seas decreased in a considerable extentC.the vessel was held fast on the grounding rocksD.the vessel's back was brokenThis report is most likely prepared by ________.A.the master of the vesselB.the cargo owners of the vesselC.the shippers of the vesselD.the independent investigator of the accidentThe crew were taken off the vessel by ________.A.air-planesB.helicoptersC.an fixed-wing aircraftD.the boat under the supervision of the 2/E engineer请帮忙给出每个问题的正确答案和分析,谢谢!

Before using a fixed CO2 system to fight an engine room fire, you must ______.A.secure the engine room ventilationB.secure the machinery in the engine roomC.evacuate all engine room personnelD.All of the above

船舶的主体是船壳。()A、The main body of a vessel is the hull.B、The main body of a vessel is the superstructure.C、The main body of a vessel is the engine room.D、The main body of a vessel is the poop.

机舱人员应启动机舱里的消防泵。()A、Engine room persons should stop their pumps in machinery space.B、Engine room persons should start their pumps in machinery space.C、Engine room persons should start their pumps in officer’s cabin.D、Engine room persons should start their pumps on boat deck.

单选题In ships where the engine room is designed as UMS, temperature sensors are fitted at critical points within the scavenge spacesActivation would cause automatic ()of the engine.AstopBstartCspeed upDslow down

单选题船舶的主体是船壳。()AThe main body of a vessel is the hull.BThe main body of a vessel is the superstructure.CThe main body of a vessel is the engine room.DThe main body of a vessel is the poop.

单选题Before using a fixed CO2 system to fight an engine room fire,you must().Asecure the engine room ventilationBsecure the machinery in the engine roomCevacuate all engine room personnelDAll of the above

单选题If the main engine of an unattended engine room shuts down automatically, it will be indicated by an alarm ().Aat each control stationBin the chief engineer’s quartersCin the captains quartersDAll of the above are correct

单选题Which of the following is the stated proper sequence before commencing cargo operations aboard Ro-Ro vessels?()AStart ventilation,lower the ramp,notify engine roomBLower the ramp,start ventilation,notify engine roomCNotify engine room,lower the ramp,start ventilationDStart ventilation,notify engine room,lower the ramp

单选题With UMS, when the engine room is unwatched () will control the main engine.Athe bridge officer on watchBthe chief engineerCthe duty engineerDthe duty motorman

单选题Your vessel has a midships engine room and the cargo is concentrated in the end holds.The vessel is().Asagging with tensile stress on main deckBsagging with compressive stress on main deckChogging with tensile stress on main deckDhogging with compressive stress on main deck

单选题Control of the main propulsion diesel engines can be shifted from the engine room to the wheelhouse from the ().Awheelhouse control stationBengine room control stationCcaptains officeDchief engineers office

单选题You are operating a lift boat.When beginning to jack down you should().AJack down one leg at a timeBJack up first,then downCUndog doors to the engine roomDAssemble all personnel on the main deck

单选题Why a gearbox is needed in a ship driven by a medium-speed diesel engine?()ATo reduce the main engine speedBTo increase the main engine speedCTo govern the main engine speedDTo fix the propeller shaft

单选题Your vessel is equipped with a fixed C02 system and a fire main system. In the event of an electrical fire in the engine room what is the correct procedure for fighting the fire?().AUse the C02 system and evacuate the engine roomBUse the fire main system and evacuate the engine roomCEvacuate the engine room and use the C02 systemDEvacuate the engine room and use the fire main system

单选题In order to release CO2 to the machinery spaces from a fixed fire extinguishing system, you must().Aactuate an alarm and open the engine room control valveBactuate an alarm and open the engine room CO2 releasing valveCopen the engine room control valve and shut off engine room ventilation fansDopen the engine room control valve and then the CO2 releasing valve

单选题UMS are mainly unattended overnight and during this time () should have control of the main engine.Athe chief engineerBthe engineer on cabin watchCthe bridge officer on watchDthe master

单选题Main diesel engine control can be obtained by the bridge ()Aat any timeBonly after the engine room control station is switched to ‘bridge control’Cwhenever the secondary station is switched to ‘bridge control’Dwhenever the engine side control station is switched to ‘bridge control’

单选题Maximum horsepower of a diesel engine is attained ().Awhen the engine RPM is pulled down by overloadBat rated engine RPMCat 95 % of rated engine RPMDat 95 % of a properly adjusted governor RPM with the engine under full load

单选题Which is false about engine trials?()Aengine trails should be done after finishing the operation of turning the engine with the turning gear and starting the engine on air brieflyBin the operation of engine trails, the main engine should be running in low-speedCAs to the ship equipment with twin main engine, engine trials should be done with one engine ahead and another engine astern at the same timeDthe order “engine trials” should be given by the bridge

单选题STCW78/95 Convention describes that () are laid down for the certification of engineer officers in charge of a watch in a traditionally manned engine room, or the designated engineer in a periodically unmanned engine room.Aavailable minimum requirementsBavailable maximum requirementsCmandatory minimum requirementsDmandatory maximum requirements