判断题由于项目结构分解是为项目的计划和实施控制服务的,是计划和控制的主要对象,所以它还应符合项目计划和目标控制的需要。A对B错
判断题
由于项目结构分解是为项目的计划和实施控制服务的,是计划和控制的主要对象,所以它还应符合项目计划和目标控制的需要。
A
对
B
错
参考解析
解析:
暂无解析
相关考题:
多选题Your company has 10 servers that run Windows Server 2008. The servers have Remote Desktop Protocol (RDP) enabled for server administration. RDP is configured to use default security settings. All administrators’ computers run Windows Vista. You need to ensure the RDP connections are as secure as possible.Which two actions should you perform? ()ASet the security layer for each server to the RDP Security Layer.BConfigure the firewall on each server to block port 3389.CAcquire user certificates from the internal certification authority.DConfigure each server to allow connections only to Remote Desktop client computers that use Network Level Authentication.
单选题What is the maximum number of CTI ports for an IPCC Expess Standard deployment? ()A150 B200 C300 DDepends upon how many expansion servers are used EDepends upon the number of applications configured
单选题At a run time, each Oracle Weblogic Server instance in a given domain creates an in-memory representation of the configuration described in this document()A mds-mbeans.xmlB config.xmlC policy.xmlD data.xml